| 1.00 | Earthwork in excavation by mechanical means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and such material either in full or in parts, as the case may be adopting any approved method or methods as may be convenient or permitted incl. chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, providing barricading, danger lighting and gaurding, dresing of sides and bottom and backfilling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge. | 322.7 | Cum | 300 ₹96,810 Lowest | 300 ₹96,810 Lowest |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 21.6 | Cum | 2,250 ₹48,600 | 2,000 ₹43,200 Lowest |
| 3.00 | Supplying jamba wooden bally piles 150mm mean diameter cut to a length required (not exceeding 9 metres ) and planted in position ready for driving: a.) Upto 2.50m long pile | 112.5 | R.M. | 150 ₹16,875 Lowest | 200 ₹22,500 |
| 4.00 | Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile complete at site (portion in ground only to be measured) :- a.) Upto 2.50m long pile | 99 | R.M. | 200 ₹19,800 Lowest | 250 ₹24,750 |
| 5.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for : (a) Foundations, footings, bases for columns and mass concrete. | 161 | Sq.m | 500 ₹80,500 Lowest | 600 ₹96,600 |
| 6.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: (a) All works upto plinth level. | 218.3 | Cum | 7,100 ₹15,49,930 | 7,000 ₹15,28,100 Lowest |
| 7.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge : A) 110mm Dia. | 30.6 | R.M | 500 ₹15,300 Lowest | 500 ₹15,300 Lowest |
| 8.00 | 12mm cement plaster 1:3 (1 cement: 3 fine sand) | 58.2 | Sq.m | 500 ₹29,100 Lowest | 500 ₹29,100 Lowest |
Tender Value
₹20.9 L
EMD Value
₹41,747
Closing Date
14 Jan 2025, 4:00 pmClosed
EE XI, WRD
Rawanfond, Navelim
Repairs and Strengthening of existing sluice gate of Borkhajan bund in Village Borim of Shiroda Constituency.
2025_WRD_19203_1
WDXI/PB/F.24/2024-25/1363/Sr4
Open Tender
Miscellaneous Works
Item Rate
45 days
Rawanfond, Navelim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹41,747
6 Oct 2026
2 Jan 2025
16 Jan 2025
2 Jan 2025
14 Jan 2025
2 Jan 2025
Amount
Earthwork in excavation by mechanical means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and such material either in full or in parts, as the case may be adopting any approved method or methods as may be convenient or permitted incl. chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, providing barricading, danger lighting and gaurding, dresing of sides and bottom and backfilling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Supplying jamba wooden bally piles 150mm mean diameter cut to a length required (not exceeding 9 metres ) and planted in position ready for driving: a.) Upto 2.50m long pile
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile complete at site (portion in ground only to be measured) :- a.) Upto 2.50m long pile
Centering and shuttering including struttings, propping etc. and removal of formwork for : (a) Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: (a) All works upto plinth level.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge : A) 110mm Dia.
12mm cement plaster 1:3 (1 cement: 3 fine sand)
Noorudeen C. K. (BID ID -42511)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .