| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 LAccepted-AOC | ₹3.7 L | 1 | Accepted-AOC L1. Agreement executed. |
| 2 | 2₹3.8 LRejected-AOC | ₹3.8 L | 2 | Rejected-AOC L2 |
| 3 | 3₹4.1 LRejected-AOC | ₹4.1 L | 3 | Rejected-AOC L3 |
| 4 | 4₹4.2 LRejected-AOC | ₹4.2 L | 4 | Rejected-AOC L4 |
| 5 | 5₹4.6 LRejected-AOC | ₹4.6 L | 5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | NOUSHAD POOVATHINGAL L1 | M.V.SAKKEER HUSSAIN L3 | MUNEER P L2 | MUHAMMED ALI P.S. L4 | RAJESH GOPI L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Appendix . A | ||||||||
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 8.27 | cum | 1,126.96 ₹9,318.83 | 1,200 ₹9,922.80 | 1,169.85 ₹9,673.49 | 1,296.34 ₹10,719.44 | 1,406.75 ₹11,632.42 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 137.5 | cum | 186.78 ₹25,681.32 | 210 ₹28,873.95 | 193.46 ₹26,599.78 | 214.38 ₹29,476.18 | 282.38 ₹38,825.84 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 12.49 | cum | 5,751.35 ₹71,863.12 | 6,550 ₹81,842.25 | 5,971.2 ₹74,610.14 | 6,616.87 ₹82,677.79 | 7,155.51 ₹89,408.10 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 147.81 | sqm | 279.96 ₹41,380.89 | 320 ₹47,299.20 | 290.58 ₹42,950.63 | 322 ₹47,594.82 | 348.31 ₹51,483.70 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 18.38 | cum | 6,212.63 ₹1.1 L | 7,500 ₹1.4 L | 6,450.74 ₹1.2 L | 7,148.22 ₹1.3 L | 7,729.36 ₹1.4 L |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.48 | cum | 6,696.08 ₹16,612.97 | 8,000 ₹19,848 | 6,952.1 ₹17,248.16 | 7,703.83 ₹19,113.20 | 8,330.84 ₹20,668.81 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 88.2 | sqm | 249.24 ₹21,982.97 | 280 ₹24,696 | 258.21 ₹22,774.12 | 286.13 ₹25,236.67 | 314.6 ₹27,747.72 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 23.06 | kilogram | 81.51 ₹1,879.95 | 90 ₹2,075.76 | 84.31 ₹1,944.53 | 93.43 ₹2,154.87 | 101.41 ₹2,338.92 |
| 1.01 | OD15028/2025-2026:Engaging labor for cleaning pump house and surroundings and slipped earth and other floating materials in canal during distribution etc. including direction of departmental officers at site. | 80 | 1 nos | 784.58 ₹62,766.40 | 700 ₹56,000 | 814.52 ₹65,161.60 | 902.6 ₹72,208 | 976.12 ₹78,089.60 |
Tender Value
₹5.1 L
EMD Value
₹12,679
Closing Date
10 Nov 2025, 3:30 pmClosed
Ajayakumar V
Assistant Executive Engineer Office of the AEE,MI Subdivision,Shoranur
GENERAL-Annual Maintenance 2025-26- Annual Maintenance works to LIS Koottakkadavu in Paruthur Panchayath.- General Civil Work
2025_Irrig_818129_1
IRR/IA/TR/3517/2025_5_4_1/1
Open Tender
Civil Works - Lift Irrigation Schemes
180 days
Paruthur
Please refer tender documents.
7 documents required · 7 mandatory
₹1,120
₹12,679
9 Jan 2026
1 Nov 2025
13 Nov 2025
1 Nov 2025
10 Nov 2025
1 Nov 2025
Amount
Appendix . A
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD15028/2025-2026:Engaging labor for cleaning pump house and surroundings and slipped earth and other floating materials in canal during distribution etc. including direction of departmental officers at site.
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
MUNEER P (BID ID -2434290)
M.V.SAKKEER HUSSAIN (BID ID -2433390)
MUHAMMED ALI P.S. (BID ID -2434615)
RAJESH GOPI (BID ID -2434364)
Bidder Name
MUNEER P
M.V.SAKKEER HUSSAIN
MUHAMMED ALI P.S.
NOUSHAD POOVATHINGAL
RAJESH GOPI
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1370977.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
formoftender.pdf
Additional Documents • 0.18 MB
affidavitformandepayment.pdf
Additional Documents • 0.08 MB
preliminaryagreement.pdf
Tender Documents • 0.11 MB
viewsbd.pdf
Tender Documents • 1.73 MB
integritypact.pdf
Additional Documents • 0.05 MB
BOQ_1370977.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid