Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹87,000
Closing Date
26 Jun 2026, 11:00 am4d left
Similar tender results from the same govt authority in the past 3 years.
EE, MGCCD 14, GARHMUKTESHWAR
EE, MGCCD 14, GARHMUKTESHWAR
CONSTRUCTION OF V.R.B. AT KM 1.745 of Bagarpurpur Dy.
2026_UPIDC_1144252_9
03/EE/2026-27
Open Tender
Civil Works - Canal
45 days
HASANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹87,000
20 Jun 2026
20 Jun 2026
26 Jun 2026
20 Jun 2026
26 Jun 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work. | 87.81 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
Cement Concrete in (1:3:6) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 28.7 | Cum | - | - | BI01010001010000000000000515BI0100001114 | |
| 3 | Ist class Brick work in 1:4, Cement Coarse Sand (F.M. Not less than 2.00), morter in warping i/c cost of material Labour & T&P etc complete for proper completion of work | 108.47 | Cum | - | - | - |
Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 60.51 | Sqm | - | - | - | |
| 5 | Providing and fixing Centering & shuttering in Straight Portion of C.C. work including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge . | 32.15 | Sqm | - | - | - |
Providing and fixing Centering & shuttering in Straight Portion of R.C.C. work including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge . | 75.84 | Sqm | - | - | - | |
| 7 | Cement Concrete in (1:1.5:3) M20 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work. | 22.29 | Cum | - | - | - |
Reinforced Cement Concrete in (1:1:2) M25 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. complete for proper completion of work as per directed by engineer in charge. | 2.48 | Cum | - | - | - | |
| 9 | S/L of Two coat Tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | 9.01 | Sqm | - | - | - |
Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate over angle iron welded contineously work including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 14.51 | RM | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.16 MB
2.pdf
Tender Documents • 2.39 MB
BOQ_2179075.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid