Tender ID
Tender Value
₹1.6 L
EMD Value
₹1,614
Closing Date
30 Mar 2026, 6:00 pmClosed
Executive Engineer, Public Health Works Division, Palanpur
Shifting of Abhapura to Shiyavada Section Rising main Pipeline @Nr.Ratanpur due to Excavation of Farmland Survey No.62 of Danta-Vadgam-Palanpur RWSS, Tal;Danta, Dist.Banaskantha
286857
16 of 2025-2026
Open
Civil Works - Water Works
Works
Banaskantha
5 documents required · 5 mandatory
₹600
Executive Engineer, P. H. Works Division, Palanpur
₹1,614
16 Mar 2026
16 Mar 2026
16 Mar 2026
30 Mar 2026
16 Mar 2026
Name of Work: Shifting of Abhapura to Shiyavada Section Rising main Pipeline @ Nr.Ratanpur due to
Excavation of Farmland Survey No. 62 of Danta-Vadgam-Palanpur RWSS Tal.Danta, Dist.Banaskantha
Sr. No. Description of Materials Qty. to be Rate Unit Place of Delivery
1 250 mm dia D.I.Pipe K-7 319.0 Free of Cost Rmt Abhapura Store
1 The Contractor submitting the tender should see that the rate in Schedule - A (of tender documents) are filled by the Engineer
in charge prior of the time of issue of tender.
2 Any additional materials to be supplied free of cost as per Schedule-A if found necessary at the time of execution will be
supplied to the contractor free of cost.
3 Any materials other than that provided in Schedule-A if required for the labour items of Schedule-B issued on request to the
contractor provided the same are available with department at prevailing market rate or department issue rate whichever is
4 The contractor shall provide his own arrangement at his own cost for loading, unloading and transport to the site of work for
the material stipulated in Schedule-A.
5 Those works will be executed which are found necessary at the time of execution, contractor will not be entitle for any claim
for saving in any items as per site condition.
6 The rate of recovery for short fall or damage of material issued free of cost will be present S.O.R. plus 3% storage charge or
rates of Board R/C Plus 3 % storage whichever is higher.
7 No negotiation at present in from and hence contractor should quote their rates accordingly.
8 The sub contract, if any given by the contractor would not create any right against the Board.
9 The Amount Recoverable from the contractor by the Gujarat water supply and sewerage board on any account shall be liable
to be recovered from the amount payable to the contractor / suppliers.
10 After passing the bill fund shall be demanded to higher authority payment shall be made after getting fund from higher
11 Labour Cess under the prevailing rules of the Government Resolution shall be borne by the bidder. (Present rate is 1%).
12 Royalty on Minerals Consumed in works from End User under the prevailing rules of the Government Resolution Dt.
18/06/2016 shall be borne by the bidder.
13 The contractor has to supply all the equipment / accessories / materials & components as per GWSSB’ approved vendor list
only. Prevailing approved vendor list is uploaded on www.gwssb.org website. However any addition (approved by the
competent authority of Board) in makes / brands of equipment etc. during bidding process, shall automatically apply. In case
of items not explicitly mentioned in vendor list the same shall be supplied as per relevant national / international standard of
reputed makes with prior approval from the Chief Engineer.
Signature of Contractor. Dy.Ex.Engineer Executive Engineer
P.H.S.Sub.Dn. P.H.Works Division
Name of work :- Shifting of Abhapura to Shiyavada Section Rising main Pipeline @ Nr.Ratanpur due to Excavation of Farmland Survey No.62
of Danta-Vadgam-Palanpur RWSS Tal.Danta, Dist.Banaskantha
Items Qty. Unit
No. Description of item RATE PER Amount
Manufacture, supply & Delivery of Ductile Iron flange socket spigot bends, tees, reducers or any other
specials as per BS -EN-545/1995 Class -A series K12 suitable for use with D.I. Pipes manufactured as
1 per IS: 8329/1994 delivery of Specials is to be made to GWSSB store or site of works any where in
Gujarat including all taxes, loading, unloading, carting,Stacking Insurance, Inspection charges, octroi
With external bitumen & Zinc coating & internal cement mortar lining
a) Socket & Spigot Type
135.0 kg DI Specials 80 mm to 300 mm 148.00 kg
Excavation for pipes line trenches including all safety provisions using site rails stacking the excavated
2 stuff upto a lead of 90 mtr cleaning the site etc. complete for lift and strata as specified.
For depth 0.00 to 1.50 m
A) In all sorts of soil and soft murrum incl.
275.0 Cmt 89.00 Cmt
(B) In Hard Murrum, boulders incl
184.0 Cmt 135.00 Cmt
Lowering and jointing CI S&S spun pipessuitable for tyton joints/ Mortarlined DI K-7pipes of various
classes with CI/DI specials of following diameters in proper position grade and alignment as directed by
3 engineer- in-charge including conveyance from store to site of work, labour, giving hydraulic testing etc.
complete (IS-8329/1999 DI PIPE) DI K-7 pipe
250 mm dia D.I. K7 Pipe
319.0 Rmt 127.00 Rmt
Making job connection for old pipes in connecting the pipe line with existing main and inserted of special
including cost of excavation cutting of pipes, dewatering testing, refilling etc. complete including all
4 jointing materials etc. complete (excluding cost of specials , pipes and fittings ) job work in cement joints
2.0 Rmt 250 mm dia D.I. Pipeline 5500.00 Rmt
5 Hiring of Hydra /Crane with Driver ( 8 working Hours in Day)
2.00 Day Hiring of JCB/Crane 6412.47 Day
6 Carting of D.I/M.S Pipe incl. loading, Unloading, Stacking at. Site of work from Site of work to Abhapura
2.00 Job Store incl. cutting of D.I. Pipe carting By tractor 4000.00 Job
7 Refilling the pipe line trenches 15 cm thick layers from excavated stuff including ramming, watering, and
439.00 Cmt disposal of surplus stuff as directed within a radious of 3 km. 22.00 Cmt
8 Removing existing pipe line incl. removal of specials, valves jointingmaterial including carting and
staking of removed material from site of work to the department store as directed excl. excavation and
180.00 Rmt 250 mm dia D.I. 56.00 Rmt
Rupees One Lac Sixty One Thousand Three Hundred Seventy & Paise Ninety Four only
I / We am / are willing to carry out work at _______________ % (Should be written in figures and words) Below/ Above the estimated rate mentioned
above amount of my/our tender work out as under;
Estimated cost put to Estimated cost put to
Tender Rs.______________ Tender Rs.______________
Signature of Contractor. Dy.Ex.Engineer Executive Engineer
P.H.S.Sub.Dn. P.H.Works Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
00_Title_ P_0.pdf
01A_NIT.pdf
01C_P_8-9.pdf
02_VOL 1 A Technical Bid_P_10-129.pdf
03A_VOL 1 B GCC_P-130-191.pdf
04_SCH-A and B_.pdf
04A_Memorandum_P_244.pdf
04B_ Volume-III Price bid_P_245-252.pdf
05A_Schedule of Payment_Pg 256-259.pdf
06_B1-Itemwise Specification_Civil_Pg 260-274.pdf
07_General Specifications_P_275-372.pdf
08_Special Note_P_373.pdf
09_INTEGRITY PACT_P_374.pdf
10_Vendor list_Pg_375.pdf
11_Ann Royalty GR .pdf
12_1.2_Royelty_18.06.19_New rate.pdf
13_05_Ann 5 Purchase Policy.pdf
14_06_Any-6A_Labour Circular.pdf
15_6_Mecilianius-min.pdf
16_Annexure 4 -GR Unbalance Rate R and B.pdf
17_07_Ann 6B shramyogi GR.pdf
18_4_Vigilace Unit-min.pdf
19_7_GR LD Deduction 10-1-2018.pdf
20_Circular_26_SIGN BOARD.pdf
21_GR- PART - 1_01 to 11.pdf
22_Min wages Circular.pdf
23_150.2025.pdf
24_1203_3_GR_15022024.pdf
25_Ann. Excavation Hard Rock (Board ).pdf
26_labour rate 30.09.2025.pdf
27_Deposit Release Circular.pdf
28_SD - EMD Financial GR_DMO_01-05-2025.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .