Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted as per DNIT |
| 2 | Accepted-Technical | Accepted-Technical Accepted as per DNIT |
Tender Value
₹31.7 L
EMD Value
₹63,455
Closing Date
11 Aug 2026, 2:00 pmClosed
Executive Engineer,RD Santirbazar Division
O/o the Executive Engineer RD Santirbazar Division Santirbazar South Tripura
Construction of Yoga centre at Baikhora under Jolaibari RD Block of South Tripura District (PWD SoR-2023)
2026_CERDD_75072_1
eDT 09/SE-VII/S/STB-DIV/DNIT/26-27 Dt-07/07/26 (2ND Call)
Open Tender
Civil Works - Building
Percentage
180 days
As per DNIT
please refer tender document
9 documents required · 9 mandatory
₹1,000
₹63,455
24 Aug 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
29 Jul 2026 - 10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Yoga centre at Baikhora under Jolaibari RD Block of South Tripura District (PWD SoR-2023) (detail estimate available with DNIT) | 1 | complete work | 31,72,769 | ₹31,72,769 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.66 MB
FINALDNITeDT92ndCall.pdf
Tender Documents • 4.27 MB
BOQ_76425.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .