Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Fee/PreQual/Technical/Finance PLOT NO 392 DESHRATAN SAHYOG SAMITI LTD DHANBAD DHANBAD 828124 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828124 | +9.99% | ₹5.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.9 L+₹25,549.92 (4.55%)Admitted-Fee/PreQual/Technical/Finance | +15.00% | ₹5.9 L+₹25,549.92 (4.55%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.0 L+₹40,849.27 (7.28%)Admitted-Fee/PreQual/Technical/Finance | +18.00% | ₹6.0 L+₹40,849.27 (7.28%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.1 L
Closing Date
14 Jul 2026, 5:00 pmClosed
AREA CIVIL ENGINEER
OFFICE OF THE GENERAL MANAGER WJ AREA
Drain Cleaning and Bush Cutting inside the Area Office Premise under W.J.Area,Moonidih
2026_BCCL_361602_1
WJA/MND/C/e-Tender/2026-27/07
Open Tender
Civil Works - Others
Percentage
28 days
MOONIDIH
Please refer Tender documents.
5 documents required · 5 mandatory
Exempted
16 Jul 2026
3 Jul 2026
16 Jul 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
4 Jul 2026 - 11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Item Description/ Heading | - | - | - | - |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 779.63 | M3 | 154.9 | ₹1,20,764.69 |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 19,000 | M2 | 10.5 | ₹1,99,500 |
| 3 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 9,750 | M2 | 5.35 | ₹52,162.5 |
| 4 | Carriage of material for earth by mechanical trasnport including loading unloading and stacking(lead-3km) as per the direction of Engineer I/C | 389.81 | M3 | 153.3 | ₹59,757.87 |
| 5 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.02 MB
finance_374491.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_374491.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .