Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.8 LAccepted-AOC AT SIRISPAL PO RANKI PS KEONJHAR TOWN DIST KEONJHAR | KEONJHAR | ₹5.8 L | 1 | Accepted-AOC QUALIFIED |
| 2 | 2₹6.3 LRejected-AOC | ₹6.3 L | 2 | Rejected-AOC DISQUALIFIED |
| 3 | 3₹6.7 LRejected-AOC AT KRISHNA CHANDRAPUR PO GOPAPUR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹6.7 L | 3 | Rejected-AOC DISQUALIFIED |
Tender Value
₹7.6 L
EMD Value
₹7,558
Closing Date
10 Feb 2026, 5:00 pmClosed
O/O EXECUTIVE OFFICER, KEONJHARGARH MUNICIPALITY
O/O EXECUTIVE OFFICER, KEONJHARGARH MUNICIPALITY
Special Repair of Road from Jayanta Sahoo house to Subal Kishor Sahoo house in Ward No-15
2026_ORULB_125106_44
ODULB_KGM_21/2025-2026
Open Tender
Civil Works - Others
120 days
KEONJHARGARH MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹7,558
Yes
8 May 2026
31 Jan 2026
11 Feb 2026
31 Jan 2026
10 Feb 2026
31 Jan 2026
31 Jan 2026 - 5 Feb 2026
Earth work in excavation of foundation in hard soil or Gravelly soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed and breaking clods to maximum 5cm to 7cm. and laying in layers not exceeding 0.3 M in depth and as per direction of the Engineer-in-charge. including cost of all labour cess etc.all complete
Carriage of Excavated earth by mechanical means with in 5km lead including loading and unloading with all cost Conveyance T&P sun dries etc.complete as per direction of Enggineer-in-charge.
Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete
C.C. ( 1 : 4 : 8 ) using 40 mm size hgcb metal free from weathered skin & all foreign materials including cost , conveyance to site , watering and curing,royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete
PCC and RCC work of M20 with 20mm size black HGCB chips including hoisting & laying including cost of all materials and cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete
Rigid & smooth Centering & shuttering for PCC works including false work and dismentalling them after casting including cost & charges of all materials & cost of all labour complete .
Supplying all labour , T & P , etc. for preparation of Stainless steel with ACP Sheet Display Board including writing charges & provision of photto graphs Pre, during & post etc. including cost of all materials & cost of all labour complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_578426.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_578426.xls
BOQ • 0.23 MB
DTCN.pdf
Tender Documents • 1.41 MB
Download all tender documents and submit your bid