Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.6 LRejected-Finance TP 479 KULANGARAYIL THODIYOOR NORTH P O VENGARA KARUNAGAPALLY KOLLAM 690 523 | KARUNAGAPALLY | KOLLAM | KERALA | 690523 | L1 | Rejected-Finance Debarred from KMML due to safety violation | |
| 2 | L2₹54.2 L+₹63,000 (1.18%)Rejected-Finance PB NO 04 KARUNAGAPALLY KOLLAM 690 518 | KARUNAGAPALLY | KOLLAM | KERALA | 690518 | L2 | Rejected-Finance L2 | |
| 3 | L3₹8.8 L−₹44.8 L (83.6%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.2 Cr+₹67.3 L (125.7%)Rejected-Finance 14 474A 14 474B 14 474C 14 474D BROTHERS ARCADE AMBALAMEDU P O OPP SNDP MANDIR KUZHIKKADU ERNAKULAM KERALA 682303 | ERNAKULAM | KERALA | 682303 | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
19 Mar 2022, 1:00 pmClosed
HOU -T
The Kerala Minerals and Metals Ltd Sankaramangalam Chavara Kollam 691 583
Design Validation Fabrication Painting Erection Testing Commissioning of 600 NB and 300 NB Piping works from new cooling tower to main distribution header at TP unit of KMML
2022_KMML_474566_1
TP/PROJ/CT/01
Open Tender
Miscellaneous Works
Item Wise
84 days
TP UNIT
Please refer Tender documents.
7 documents required · 7 mandatory
₹10,974
₹1.6 L
TP UNIT OF KMML
9 Jun 2022
19 Feb 2022
21 Mar 2022
19 Feb 2022
19 Mar 2022
21 Feb 2022
19 Feb 2022 - 19 Mar 2022
2 Mar 2022
BOQ DETAILS
Design validation, Piping Stress Analysis using CAESAR-II software, Stress Analysis report preparation & Submission, Piping Isometrics preparation & Submission. Design of piping supports / structural restraints as per the piping stress analysis report.
Fabrication, Painting, Erection, Testing, Flushing, Passivation & Commissioning of 600 NB (24") & 300 NB (12") Cooling water Supply & Return header from the new Cooling tower with valves / fittings as required and interconnecting with the existing Cooling water network as detailed in the Schematic drawing as per the Validated design and Technical specification attached and through KMML constructed stockade – Approximately 17000 Inch Meters
Supply, transportation to site, unloading, Erection, Testing at site and commissioning of new 24" Gear Operated Butterfly valve - 2 numbers with Suitable WNRF mating flanges of size 24" - 4 Numbers - as per the piping stress analysis report & Technical specification attached.
Supply, transportation to site, unloading, Erection, Testing at site and commissioning of new 12" Gear Operated Butterfly valve - 2 numbers with Suitable WNRF mating flanges of size 12" - 4 Numbers - as per the piping stress analysis report & Technical specification attached.
Fabrication of piping supports as per the Stress Analysis / Design report, Painting as per KMML standard Specification, Erection at site as per KMML soecification including coast and conveyance of all consumables, labour, lead, lift etc complete as directed by Engineer in charge at all levels (Strucutral steel shall be supplied departmentally) as per the Technical specification attached - Approximately 10 MT
ANILKUMAR K K
HIND ERECTORS
G S CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .