Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.5 LAccepted-AOC 143 INDUSTRIAL AREA PHASE 2 PANCHKULA HARYANA | PANCHKULA | PANCHKULA | HARYANA | L1 | Accepted-AOC ok | |
| 2 | L2₹37.0 L+₹2.8 L (8.23%)Rejected-AOC 46 LOWER GROUND FLOOR CHARMWOOD PLAZA EROS GARDEN FARIDABAD HARYANA 121009 | FARIDABAD | FARIDABAD | HARYANA | 121009 | L2 | Rejected-AOC ok |
Tender Value
₹34.3 L
EMD Value
₹68,680
Closing Date
24 Jan 2023, 5:00 pmClosed
Executive EngineerLWS Mech Div Ch Dadri
Executive EngineerLWS Mech Div Ch Dadri
Work for shifting of 5 No. 1600 2000 Amp. MCC Panal in newly constructed switch room from old building at Pump House 6 Loharu Canal
2023_HRY_252806_6
65-85/37-A ated 05/01/2023
Open Tender
Supply, Erection and Commissioning
Works
180 days
Ch Dadri
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹68,680
Yes
13 Apr 2023
6 Jan 2023
25 Jan 2023
6 Jan 2023
24 Jan 2023
6 Jan 2023
Amount
Dismantling/Disconnection & shifting of 1000, 1600 & 2000 amp. Motor Control Centre /Panel complete in all aspect with separated all the 15no outgoing panel & 5 no incoming panel /parts and including transportation, loading & unloading in new Switch room
Erection and commissioning of 1000, 1600 & 2000 amp. Motor Control Centre /panel with Supply, Erection and commissioning of following items for all the 4no MCC Panel :- A) 200mtr LT power cable 3.5 core aluminium conductor 400mm^2 XLPE insulated armoured cable from Motor Control Centre panel to 5 no. 50 Cs. VT pump/325HP motorin main building. B) 200mtr LT power cable 3.5 core aluminium conductor 400mm^2 XLPE insulated armoured cable from Motor Control Centre panel to 4 no. 50 Cs. VT pump/225HP motorin main building. C) 240mtr LT power cable 3.5 core aluminium conductor 185mm^2 XLPE insulated armoured cable from Motor Control Centre panel to 6 no.20 Cs. VT pump/100HP motor in main building. The above point (A.B.C) including labour charge & all the allied accessories like lugs, nut bolts, thimbles etc. complete in all aspect including any leftover item as per site requirement.
Providing & Fixing of Earthing with three pits & connection of 5no Motor Control Centre Panels with GI Strip complete all respect .
ace marketing pvt ltd
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .