Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC | ₹18.6 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SUNILKUMAR.K.T L1 |
|---|---|---|---|---|
| 1.00Bridge proper | ||||
| 1.00 | 15.1.A:Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates. | 18 | cum | 4,606.32 ₹82,913.76 |
| 1.00 | OD76113/2023-2024:Providing and laying boulders apron WITH DEPARTMENTAL RUBBLE on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates. | 18 | cum | 1,994.49 ₹35,900.82 |
| 1.00 | OD120150/2024-2025:Removing damaged concrete:
Loose and delaminated concrete shall be identified and marked before proceeding with the
removal. The loose cover concrete including the loose damaged concrete shall be removed upto
beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only
affected concrete shall be removed and conducting proper investigation, (Good & sound
concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by
mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at
periphery to avoid feather edge for all height and removal and disposal of debris at designated
location including all material, labour, tools, temporary supports for structures, electricity, plant
and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of
chipping may vary from 20 to 100 mm. | 41.5 | per sqm | 562.88 ₹23,359.52 |
| 1.00 | OD120151/2024-2025:Rust remover/Rust Convertor:Cleaning of rust / scales / corrosion from reinforcement bars should be carried out using acid based rust remover, Reebakleens RR of Fosroc or equivalent, or using alkali based rust
converters such as Feovert of Krishna Conchem. The material is to be applied to the rusted
metal bar, using brush and leaving it to dry for 30 Min. & washing surface with fresh water as
required to exposed reinforcement bar at all heights, including all material, labour, tools,
temporary supports for structures, electricity, plant and machineries complete as per detail
specification and as directed by Engineer-in-charge and/or Consultant. The concrete surface
area containing the cleaned rebars shall be measured for payment. | 12.45 | sqm | 402.85 ₹5,015.48 |
| 1.00 | OD120161/2024-2025:Anti Corrosive treatment to Steel:Providing & applying inhibition coats/system to exposed reinforcement bars & also new bars,after cleaning & removing scales and rust completely as specified in 1.4, Two component
inhibitor Nitozinc Primer std. of Fosroc or MasterEmaco P130 of BASF or equivalent having
specific gravity of 1.75 and solid content 57(+/-3) Adhesive bond strength > 1.5 N/mm2, 40
microns DFT per coat as approved by Engineer-in-charge and/or Consultant shall be used as
per manufacturer?s specification in two coats at all heights, including all material, labour, tools,
temporary supports for structures, electricity, plant and machineries, necessary surface
preparation and necessary protection after and during work. The concrete surface area
contianing the rebars where the treatment is carried out shall be considered for measurement | 16.6 | sqm | 875.6 ₹14,534.96 |
| 1.01 | OD120162/2024-2025:New/Additional steel Reinforcement: Supplying, cutting, fabricating new reinforcement Fe500 for Jacketing, and providing additionalsteel reinforcement to compensate corroded reinforcement in existing member etc. and fixing
with old existing reinforcement which was reduced to 15 % or more of its original diameter as
required as provided in original structure and additional steels as directed by EIC and/ or
consultant as required tying with 16 gauge annealed binding wire complete as per drawing and
specifications for all heights including all material, labour, tools, temporary supports for
structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-incharge and/or consultant (TMT BARS of various size as required) | 147.55 | kg | 80.93 ₹11,940.9 |
| 1.01 | OD120180/2024-2025:Anchoring mainsteel and stirrups: Drilling holes of min 4mm larger than new rebar diameter into existing concrete substrate for anchoring of new rebar and depth of Min. 10 times the diameter of rebar and fixing with anchor resin grout Lokfix E (35/55/75) series or Lokfix P or Emfix or chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18-836 includingcleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports forstructures, electricity, plant and machineries etc. complete as directed by Engineer-in-chargeand/or consultant for all heights | 50 | no | 378.32 ₹18,916 |
| 1.01 | OD120195/2024-2025:Anchoring Steel & Shear Connectors:
Drilling holes into existing concrete structure for anchoring of new rebar with 10 mm dia. shear
connectors at 0.5 Mt. c/c (or as per design recommendation) and fixing with anchor resin grout
Lokfix P / Lokfix E 75/55/35 series or Emfix or pure epoxy resin based cartridge form chemical
anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18-
836. Drilling hole for diameter: 14 mm, Drilling hole for depth: 100 mm including cleaning,
cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures,
electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or
consultant for all heights | 60 | 1 nos | 263.11 ₹15,786.6 |
| 1.01 | OD120235/2024-2025:Epoxy Injection Grouting:
Providing and executing injection/pressure grouting in cracks in the parent concrete by fixing
PVC perforated nozzles at 150 mm to 200 mm distance or specified distances as per design and
detailed specifications. Pressure grouting using low viscous epoxy grout Conbextra EP10M of
Fosroc or Masterinject 1315 of BASF or Shaligroput EI or equivalent having mix density 1050
kg/m3, Compressive Strength (ASTM D695)->50 N/mm2,Tensile Strength (ASTM C 304-97)-
18 N/mm2, Flexural strength(BS 6319 Part 4)-45 N/mm2 Pressure grouting shall be done at
required pressure at all heights, including all material, labour, tools, temporary supports for
structures, plant and machineries, curing etc. complete as directed by Engineer-in-charge
and/or consultant. | 50 | per kg | 1,842.87 ₹92,143.5 |
Tender Value
₹19.0 L
EMD Value
₹47,467
Closing Date
26 May 2026, 3:00 pmClosed
Executive EngineerPWDBridges DivisionPalakkad
O/o Executive EngineerPWDBridges DivisionPalakkad
RETENDER-GENERAL-2025-26 Rehabilitation works to VANDITHODU BRIDGE at Para - Kunnachi R o a d i n M a l a m p u z h a L A C - 2 0 2 5 - 2 6 Rehabilitation works to VANDITHODU BRIDGE at Para - Kunnachi Road in Malampuzha LAC-General Civil Work
2026_PWD_846888_2
PWD/BR/TR/12261/2023_5_1_1/1
Open Tender
Civil Works - Bridges
Para - Kunnachi R o a d
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹47,467
Yes
29 Jun 2026
18 May 2026
28 May 2026
18 May 2026
26 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Bridge proper | |||||
| 1.001 | 15.1.A:Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates. | - | cum | - | - |
| 1.002 | OD76113/2023-2024:Providing and laying boulders apron WITH DEPARTMENTAL RUBBLE on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates. | - | cum | - | - |
| 1.003 | OD120150/2024-2025:Removing damaged concrete:
Loose and delaminated concrete shall be identified and marked before proceeding with the
removal. The loose cover concrete including the loose damaged concrete shall be removed upto
beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only
affected concrete shall be removed and conducting proper investigation, (Good & sound
concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by
mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at
periphery to avoid feather edge for all height and removal and disposal of debris at designated
location including all material, labour, tools, temporary supports for structures, electricity, plant
and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of
chipping may vary from 20 to 100 mm. | - | per sqm | - | - |
| 1.004 | OD120151/2024-2025:Rust remover/Rust Convertor:Cleaning of rust / scales / corrosion from reinforcement bars should be carried out using acid based rust remover, Reebakleens RR of Fosroc or equivalent, or using alkali based rust
converters such as Feovert of Krishna Conchem. The material is to be applied to the rusted
metal bar, using brush and leaving it to dry for 30 Min. & washing surface with fresh water as
required to exposed reinforcement bar at all heights, including all material, labour, tools,
temporary supports for structures, electricity, plant and machineries complete as per detail
specification and as directed by Engineer-in-charge and/or Consultant. The concrete surface
area containing the cleaned rebars shall be measured for payment. | 1 | sqm | - | - |
| 1.005 | OD120161/2024-2025:Anti Corrosive treatment to Steel:Providing & applying inhibition coats/system to exposed reinforcement bars & also new bars,after cleaning & removing scales and rust completely as specified in 1.4, Two component
inhibitor Nitozinc Primer std. of Fosroc or MasterEmaco P130 of BASF or equivalent having
specific gravity of 1.75 and solid content 57(+/-3) Adhesive bond strength > 1.5 N/mm2, 40
microns DFT per coat as approved by Engineer-in-charge and/or Consultant shall be used as
per manufacturer?s specification in two coats at all heights, including all material, labour, tools,
temporary supports for structures, electricity, plant and machineries, necessary surface
preparation and necessary protection after and during work. The concrete surface area
contianing the rebars where the treatment is carried out shall be considered for measurement | - | sqm | - | - |
| 1.006 | OD120162/2024-2025:New/Additional steel Reinforcement: Supplying, cutting, fabricating new reinforcement Fe500 for Jacketing, and providing additionalsteel reinforcement to compensate corroded reinforcement in existing member etc. and fixing
with old existing reinforcement which was reduced to 15 % or more of its original diameter as
required as provided in original structure and additional steels as directed by EIC and/ or
consultant as required tying with 16 gauge annealed binding wire complete as per drawing and
specifications for all heights including all material, labour, tools, temporary supports for
structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-incharge and/or consultant (TMT BARS of various size as required) | 0.4 | kg | - | - |
| 1.007 | OD120180/2024-2025:Anchoring mainsteel and stirrups: Drilling holes of min 4mm larger than new rebar diameter into existing concrete substrate for anchoring of new rebar and depth of Min. 10 times the diameter of rebar and fixing with anchor resin grout Lokfix E (35/55/75) series or Lokfix P or Emfix or chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18-836 includingcleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports forstructures, electricity, plant and machineries etc. complete as directed by Engineer-in-chargeand/or consultant for all heights | - | no | - | - |
| 1.008 | OD120195/2024-2025:Anchoring Steel & Shear Connectors:
Drilling holes into existing concrete structure for anchoring of new rebar with 10 mm dia. shear
connectors at 0.5 Mt. c/c (or as per design recommendation) and fixing with anchor resin grout
Lokfix P / Lokfix E 75/55/35 series or Emfix or pure epoxy resin based cartridge form chemical
anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18-
836. Drilling hole for diameter: 14 mm, Drilling hole for depth: 100 mm including cleaning,
cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures,
electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or
consultant for all heights | - | 1 nos | - | - |
| 1.009 | OD120235/2024-2025:Epoxy Injection Grouting:
Providing and executing injection/pressure grouting in cracks in the parent concrete by fixing
PVC perforated nozzles at 150 mm to 200 mm distance or specified distances as per design and
detailed specifications. Pressure grouting using low viscous epoxy grout Conbextra EP10M of
Fosroc or Masterinject 1315 of BASF or Shaligroput EI or equivalent having mix density 1050
kg/m3, Compressive Strength (ASTM D695)->50 N/mm2,Tensile Strength (ASTM C 304-97)-
18 N/mm2, Flexural strength(BS 6319 Part 4)-45 N/mm2 Pressure grouting shall be done at
required pressure at all heights, including all material, labour, tools, temporary supports for
structures, plant and machineries, curing etc. complete as directed by Engineer-in-charge
and/or consultant. | - | per kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1438966.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.70 MB
BOQ_1438966.xls
BOQ • 0.33 MB
merged1.pdf
Tender Documents • 8.69 MB
Download all tender documents and submit your bid