Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC 22 12 SIJUA TETULMARI DHANBAD DHANBAD DHANBAD 828121 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828121 | ₹6.5 L | L1 | Accepted-AOC Approved |
| 2 | L2₹6.8 L+₹32,362.15 (5.00%)Rejected-Finance 22 12 SIJUA DHANBAD 828121 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828121 | ₹6.8 L+₹32,362.15 (5.00%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Finance DATTUMURI BASTI 22 12 SIJUA DHANBAD | DHANBAD | DHANBAD | JHARKHAND | 828121 | - | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹6.5 L
EMD Value
₹8,100
Closing Date
30 Dec 2025, 5:00 pmClosed
AM EnM Sijua Area
Sijua Area office
Complete Rewinding/Repairing of 500KVA Transformer 3.3KV/440V Sl.No.801709 at NPC(ii)and Overhauling and Maintenance of 550V/440V,500KVA Lighting Transformer Sl.No.171/1936 Make Metropolitan Vickers KNC(iii)Repairing and Complete Rewinding of 500KVA
2025_BCCL_349702_1
GM/SA/AM(EnM)-NIT/2025-26/118
Open Tender
Electrical and Maintenance Works
Percentage
10 days
NPC, KNC and MDC under Sijua Area
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,100
5 Aug 2026
19 Dec 2025
31 Dec 2025
20 Dec 2025
30 Dec 2025
20 Dec 2025
20 Dec 2025 - 27 Dec 2025
New Copper Strio Primary & Secondary
Old Copper Less Scrap Primary & Secondary(1000-400=600*190=114000
TPC Covering Primary & Secondary
Insulating Materials 10% of 350 Kgs on Ve
Soldering materials(Rupaton)with Oxygen & DA
Cork Sheet for Top Cover, bushing & cooling
Copper Stud with bushing Secondary Complete Set
Old Transformer Tank Cleaning repairing & painting cost
Labour Charge-H/Skilled
S/Skilled
Skilled
Transporting charges(Up & Down)
For Overhauling & Maintenance of 550V/440V,500KVA Lighting Transformer
Internal & External Cable Connection Open
Cork Sheet Primary & Secondary bush
Oil Seal for Primary & Secondary bushing
Copper Stud Secondary Side 15*2 with Nut
Copper Stud Primary Side 15*3/4 with Nut
Connection New Copper Patti Primary and Secondary
Top Cover Opening & Fitting
Transformer 500KVA 6.6KV/550V of 3 No.Substation MDC.
New copper strips 1000/- New-400/-Scrap replacemnt of Primary Secondary side
Cleaning & DE-carbonized of remaining copper strip
Re-insulation with T.P covering
Soldering materials(Rupaton)with oxygen & DA
Cork Sheet for top cover,bushing & cooling
Transformer oil filtration
insulation materials of primary & secondary strip total 309 Kg x 1000/-10%
High pressure testing charges
Energy charge for heating & backing of core
Providing & fitting of breather
Tank cleaning & painting
Transporting both side
Copper stud with bushing secondary complete set
Labour charges complete dismantling and assembling of core & coil cork sheet changing complete rewinding etc. and fitting(a) H/Skilled
(b)Skilled manpower
(c ) S/Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.70 MB
BOQ_362445.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .