Loading…
Loading…
Tender Value
₹10.2 L
EMD Value
₹10,200
Closing Date
8 Oct 2026, 5:00 pm
SE UKIDIVN, Borigumma,Dist-Koraput
Office of the Superintending Engineer, U.K.I.Division,Borigumma, Dist- Koraput, PIN 764056
CANAL ROAD WORK
2026_UPIDB_141809_1
SEUKID-03/2026-27 (SL07)
Open Tender
Civil Works - Canal
Percentage
60 days
BORIGUMMA
AS PER DTCN
3 documents required · 3 mandatory
₹6,000
₹10,200
Yes
28 Sept 2026
28 Sept 2026
9 Oct 2026
28 Sept 2026
8 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying sub-base in layers not exceeding 225mm watering and compacting to the required density in O.M.C with Vibratory Roller but excluding cost and conveyance of all materials with all lead, lift and de-lifts etc. complete as per the direction of the Engineer-in-charge. | 149.63 | Cum | 767.6 | ₹1,14,855.99 |
| 2 | Collecting, conveying, stacking and labour for laying I.R.C. Gr.I metalling conforming to sieve analysis as per M.O.S.R.T&H specification using 45 mm to 90 mm size crusher broken hard granite metal free from weathered skin and excess of flat, elongated, soft and disintegrated particles, dirt and other objectionable materials, spreading metal on the scientifically approved road surface to a uniform thickness hand packing to proper camber including all cost, conveyance, labour charges. Royalty and all taxes of all materials including pre-stacking to regular box heaps of size (1.5 x 1.5 x 0.5) mtr. to be measured as 1 cum and conveying from stacks for spreading, packing the voids with small stones hand packing to proper camber filling the interstices with moorum and sand of approved quality, watering, turf edging etc. consolidation with P.R.R. including hire and running charges of P.R.R. etc. complete as per specification and the direction of Engineer-in-Charge. | 139.65 | Cum | 2,922.1 | ₹4,08,071.27 |
| 3 | Collecting, conveying, stacking and labour for laying I.R.C. Gr.II metalling conforming to sieve analysis as per M.O.S.R.T&H specification using 45 mm to 63 mm size crusher broken hard granite metal free from weathered skin and excess of flat, elongated, soft and disintegrated particles, dirt and other objectionable materials, spreading metal on the scientifically approved road surface to a uniform thickness hand packing to proper camber including all cost, conveyance, labour charges. Royalty and all taxes of all materials including pre-stacking to regular box heaps of size (1.5 x 1.5 x 0.5) mtr. to be measured as 1 cum and conveying from stacks for spreading, packing the voids with small stones hand packing to proper camber filling the interstices with moorum and sand of approved quality, watering, turf edging etc. consolidation with P.R.R. including hire and running charges of P.R.R. etc. complete as per specification and the direction of Engineer-in-Charge. | 139.65 | Cum | 3,062.2 | ₹4,27,636.23 |
| 4 | Earth work in excavation in hard soil with all leads, lifts and de-lifts including rough dressing, breaking the clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m thick in approved filling reaches of canal including cost, labour charges, T&P materials, royalty, taxes etc. complete as per specification and the direction of Engineer-in-Charge. | 236.91 | Cum | 276.4 | ₹65,481.92 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.55 MB
DTCN-7.pdf
Tender Documents • 1.42 MB
BOQ_611061.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .