| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC VILLAGE VILLAGE TEHSIL BAIJNATH DISTRICT KANGRA | MANDI | HIMACHAL PRADESH | 175013 | ₹14.3 L | L1 | Accepted-AOC Awarded to L1 |
| 2 | L2₹14.7 L+₹39,767.19 (2.77%)Rejected-Finance HIMACHAL PRADESH | ₹14.7 L+₹39,767.19 (2.77%) | L2 | Rejected-Finance L2 |
| 3 | L3₹15.1 L+₹75,904.78 (5.29%)Rejected-Finance | ₹15.1 L+₹75,904.78 (5.29%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | AMIT CHOUDHARY L1 | GALAXY ASSOCIATE L3 | Ravinder Kumar L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 109.7 | Cum | 90 ₹9,873 Lowest | 95 ₹10,421.5 | 92 ₹10,092.4 |
| 2.00 | Preparation and Consolidation of Sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulation etc. and re-rolling the sub grade and disposal of surplus earth within all leads and lift and complete in all respect to the entire satisfaction of the Engineer-in-Charge. | 1,080.97 | Sqm | 50 ₹54,048.5 Lowest | 70 ₹75,667.9 | 60 ₹64,858.2 |
| 3.00 | Providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specifications including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and chamber applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical specifications clause 405 within all leads and lift and complete in all respect to the entire satisfaction of the Engineer-in-Charge. | 81.07 | Cum | 2,300 ₹1,86,461 Lowest | 2,450 ₹1,98,621.5 | 2,400 ₹1,94,568 |
| 4.00 | Providing and laying in position cement concrete 1:3:6 (1 Cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | 100.64 | Cum | 5,800 ₹5,83,712 Lowest | 6,000 ₹6,03,840 | 5,900 ₹5,93,776 |
| 5.00 | Providing and laying in position cement concrete 1:2:4 (1 Cement: 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) and curing complete in pavements laid to required slope and camber in panels as required including consolidation finishing and tamping complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | 75.48 | Cum | 6,600 ₹4,98,168 Lowest | 6,800 ₹5,13,264 | 6,700 ₹5,05,716 |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form work for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 19.44 | Sqm | 250 ₹4,860 Lowest | 270 ₹5,248.8 | 260 ₹5,054.4 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form work for Edges of slab and break in floor and walls complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | 16.2 | Rmt | 90 ₹1,458 Lowest | 95 ₹1,539 | 92 ₹1,490.4 |
| 8.00 | Providing Mild steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | 198.68 | Kg | 92 ₹18,278.56 Lowest | 98 ₹19,470.64 | 95 ₹18,874.6 |
| 9.00 | Providing and laying in position reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) and curing complete in All work up to plinth level excluding the cost of centering, shuttering & reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | 2.98 | Cum | 7,200 ₹21,456 Lowest | 7,500 ₹22,350 | 7,300 ₹21,754 |
| 10.00 | Providing and laying in position cement concrete 1:3:6 (1 Cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centering , shuttering in All work up to plinth level, complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | 5.88 | Cum | 6,000 ₹35,280 Lowest | 6,400 ₹37,632 | 6,200 ₹36,456 |
Tender Value
₹12.6 L
EMD Value
₹33,045
Closing Date
16 Apr 2026, 5:00 pmClosed
District Project Manager HPCDP JICA ODA
District Project Manager O/o DPMU HPCDP JICA ODA Phase-II, Opposite to Soil Testing Lab, Holta at Palampur
Construction of Farm Access Road at Flow Irrigation Scheme Soian Kuhal, G.P Panaper, Tehsil-Palampur District Kangra (H.P).
2026_HPCDP_133561_1
No.AGR. DPMU. KGR. F (7) Tender/13/2022-85
Open Tender
Civil Works - Roads
Item Rate
60 days
G.P Panaper, Tehsil-Palampur District Kangra (H.P)
Please refer Tender documents.
15 documents required · 15 mandatory
₹1,500
₹33,045
District Project Manager HPCDP JICA ODA
30 Jun 2026
7 Apr 2026
17 Apr 2026
7 Apr 2026
16 Apr 2026
7 Apr 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
| 2 | Preparation and Consolidation of Sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulation etc. and re-rolling the sub grade and disposal of surplus earth within all leads and lift and complete in all respect to the entire satisfaction of the Engineer-in-Charge. | - | Sqm | - | - |
| 3 | Providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specifications including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and chamber applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical specifications clause 405 within all leads and lift and complete in all respect to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
| 4 | Providing and laying in position cement concrete 1:3:6 (1 Cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
| 5 | Providing and laying in position cement concrete 1:2:4 (1 Cement: 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) and curing complete in pavements laid to required slope and camber in panels as required including consolidation finishing and tamping complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | - | Sqm | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for Edges of slab and break in floor and walls complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | - | Rmt | - | - |
| 8 | Providing Mild steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | - | Kg | - | - |
| 9 | Providing and laying in position reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) and curing complete in All work up to plinth level excluding the cost of centering, shuttering & reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
| 10 | Providing and laying in position cement concrete 1:3:6 (1 Cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centering , shuttering in All work up to plinth level, complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BIDSOIAN.pdf
Tender Documents • 1.45 MB
BOQ_197446.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .