| 1 | L8₹49.7 L+₹2.7 L (5.83%)Accepted-AOC 262 1 NEAR MANAV CHOWK NEW GRAIN MARKET AMBALA CITY HARYANA HARYANA 134003 | AMBALA | HARYANA | 134003 | L8 | Accepted-AOC Being reasonable as BOQ notes | |
| 2 | L1₹46.9 LRejected-Finance 411 STREET NO 4 PANCHVATI NAGAR BATHINDA 151001 | BATHINDA | PUNJAB | 151001 | L1 | Rejected-Finance Non bonafide due to less Non bonafide due to less rate quoted than minimum wages, ESI, Bonus,LWC etc as applicable | |
| 3 | L2₹47.8 L+₹88,797.24 (1.89%)Rejected-Finance | L2 | Rejected-Finance Non bonafide due to less rate quoted than minimum wages, ESI, Bonus,LWC etc as applicable | |
| 4 | L2₹47.8 L+₹88,797.24 (1.89%)Rejected-Finance | L2 | Rejected-Finance Non bonafide due to less rate quoted than minimum wages, ESI, Bonus,LWC etc as applicable | |
| 5 | L3₹4.8 Cr+₹4.4 Cr (929.1%)Rejected-Finance | L3 | Rejected-Finance Non bonafide due to less rate quoted than minimum wages, ESI, Bonus,LWC etc as applicable |
Tender Value
₹49.9 L
EMD Value
₹1 L
Closing Date
13 Jul 2020, 6:00 pmClosed
GE (AF) Halwara
GE (AF) Halwara
OUTSOURCING FOR MANNING AND OPERATION OF AC PLANTS IN ZONE A AT AF STATION HALWARA
2020_MES_354156_1
GE/HAL-17/2020-21
Open Tender
Civil Works
Works
334 days
GE (AF) Halwara
MES ENLIESTD CONTRACORS CLASS D CAT a i or d v
8 documents required · 8 mandatory
₹500
Yes
GE (AF) Halwara
₹1 L
Yes
29 Jul 2020
19 Jun 2020
15 Jul 2020
19 Jun 2020
13 Jul 2020
6 Jul 2020
Amount
Manning and operation of Central type AC plants ( 2X30 ) 60 TR in three shifts each of 08 hours round the clock including sundays and holidays by deploying Semi-Skilled worker 01 No at each installation in each shift, having three compressor units complete with suction, discharge, stop valves, pressure gauge, pressure cut out, regulators thermometers and other accessories etc each driven by electric motor running two Nos at a time and one stand by (Total three compressor unit of capacity 30 TR each) including operation of AHU units comprising blower units strips heaters, pre-heaters and reheating, dehumidifying pump along with operation of water circulating of cooling blower pump, setting of different controls during operation such as switches, starters , relay, humidity at pressure gauges, temperature gauge etc. Humidity and temperature should be maintained to meet the required design conditions as directed for plant installed at S4 Complex AC Plant 60 TR Inside design conditions:-Temperature= 20 deg C + 5 deg C. Relative humidity = 50% + 5% complete all as specified & directed.
Manning and operation of Central type AC plants 42 TR in three shifts each of 08 hours round the clock including sundays and holidays by deploying Semi-Skilled worker 01 No at each installation in each shift, having three compressor units complete with suction, discharge, stop valves, pressure gauge, pressure cut out, regulators thermometers and other accessories etc each driven by electric motor running two Nos at a time and one stand by (Total three compressor unit of capacity 21 TR each) including operation of AHU units comprising blower units strips heaters, pre-heaters and reheating, dehumidifying pump along with operation of water circulating of cooling blower pump, setting of different controls during operation such as switches, starters , relay, humidity at pressure gauges, temperature gauge etc. Humidity and temperature should be maintained to meet the required design conditions as directed for plant installed at Hospital AC Plant 42 TR Inside design conditions:-Temperature = 20 deg C + 5 deg C. Relative humidity = 50% + 5% complete all as specified & directed.
All as per item No 1.00 here-in-before but AC Plant of capacity 26 TR (2 x 13 TR) Capacity at NBD in three shifts, each of 08 hours.
All as per item No 1.00 here-in-before but AC Plants of capacity 40 TR (2 x 20 TR) at Photo Section in three shifts, each of 08 hours.
All as per item No 1.00 here-in-before but Package Type AC Plants of capacity 17 TR ( 2 x 8.5 TR) at Logistic Section in Three shifts, each of 08 hours.
All as per item No 1.00 here-in-before but AC Plant of capacity 22 TR (2 x 11 TR) at Spyder LLQRM in three shifts, each of 08 hours.
All as per item No 1.00 here-in-before but AC Plants of capacity 30 & 15 TR (2 x 15 TR & 2 x 7.50 TR) at Parachute in three shifts, each of 08 hours.
Notes for item No 1 to 7:- Thge contractor shall employ one semi-skilled operator (ITI qualified in any trade) for each shift duty in AC plant. Rates quoted for outsourcing the services as described in Srl No 1.00 to 7.00 here-in-before and shall includes the following :- (i) Worker's wages per person for Semi-skilled (ITI Operator) = Rs. 492.00 Per day. (ii) Employees state insurance @3.25% on wages as per existing rules. (iii) EPF, EPS, EDLIS and administrative charges @ 13% on wages as per exisiting rules. (iv) Bonus if applicable as per existing rules. (v) LWC @ 1% on (i) to (iv) above as per existing rules. (vi) GST@ 18% on (i) to (v) above as per existing rules. (vii) EPF-not applicable (for wages more than Rs 15000.00 per month as per existing rules) (viii) Overhead charges and contractor's profit is deemed to be included in the shift rates quoted and nothing extra shall be adimssible on this account. If a firm quotes Nil charges against over head and profit charges, his bid will not be considered for acceptance. (ix) The rates quoted shall not be less than minium wages as notified by Govt of India/State Govt/ local body whichever is higher including all statutory provisions such as EPF, ESIC, Bonus, Taxes etc as applicable. (x) In case two or more firms quote the same rates, the preference will be given to the firm based on the past records and factors like Class of contractor, financial soundness, Performance achieved and work experience for last two years etc. (xi) If during currency of work any rate increases then contractor has to paid increase rates to the workers and his quoted rate is inclusive for the same. Nothing extra is admissable on this account. (xii) Contractor shall not engage child labour in the work. (xiii) Contractor shall provide uniform with name plate as approved by GE/Engineer In Charge to the workers.
(xiv) Worker to be provided with basic phone (without cameras) for obtaining necessary direction from the JE/Engineer in-charge. (xv) Each worker shall be submitted affidavit in stamp paper duly notary attested that he will not claim employment from Department. (xvi) No worker to be engaged in continuous shifts operations . Workers employed during previous year contract for the same work shall not be employed again for this work. (xvii) The tenderer shall have full knowledge for group of buildings/complex to be attended under respective items of BOQ. (xviii) The contractor shall prepare duty roster well in advance and get it approved from Engr-in-Charge and one copy of the duty roster shall be displayed in the notice board installed at site of work. (xix) Contractor is required to quote upto two digits after decimal place or otherwise it will be considered by rounding off to two digits after decimal place. (xx) Contractos accidental/ insuance for each worker employed. (xxi) Also refer Sch Á' notes given in tender documents.
M/s GURFATEH BUILDERS
POWER ELECTRONICS ENGINEERS
M/S SANGA SINGH AND CO
BEHL AND COMPANY
CHOUDHARY ENTERPRISES
JASSI TRADERS
JINDAL AND COMPANY
Kular and Company
SHARDA ENTERPRIES
ALPHA ENGINEERS AND BUILDERS
M/S MAISUR CONSTRUCTION COMPANY PRIVATE LIMITED
M/SSKANDCO
VISHAV CONSTRUCTIONS
kartikconstructions
G M CONSTRUCTION COMPANY
Choice india
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .