Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Fee/PreQual/Technical/Finance | -13.00% | ₹4.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.5 L+₹5,105.10 (1.15%)Admitted-Fee/PreQual/Technical/Finance | -12.00% | ₹4.5 L+₹5,105.10 (1.15%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.6 L+₹15,366.34 (3.46%)Admitted-Fee/PreQual/Technical/Finance MUKALEL AMARAVATHY P O KUMILY | KUMILY | IDUKKI | KERALA | -9.99% | ₹4.6 L+₹15,366.34 (3.46%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹4.7 L+₹21,951.91 (4.94%)Admitted-Fee/PreQual/Technical/Finance KAROTTUKOCHUPARAMBIL H MOONGALAR PO IDUKKI | IDUKKI | IDUKKI | KERALA | -8.70% | ₹4.7 L+₹21,951.91 (4.94%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.0 L
EMD Value
₹15,000
Closing Date
16 Jul 2026, 5:00 pmClosed
Deputy Director
Deputy Director, Periyar East Division, Thekkady
Maintenance work of turtle park under Thekkady range during 2026-27
2026_FD_859216_1
T-3611/2026/S
Open Tender
Civil Works - Others
Percentage
60 days
Thekkady Range
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,420
Yes
₹15,000
Yes
18 Jul 2026
7 Jul 2026
18 Jul 2026
7 Jul 2026
16 Jul 2026
7 Jul 2026
7 Jul 2026 - 16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 12 mm cement plaster of mix 1:4 | 50 | sqm | 369.76 | ₹18,488 |
| 2 | Engaging Mason | 6 | Day | 1,256.66 | ₹7,539.96 |
| 3 | Grading roof for waterproofing treatment with Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.7 | cum | 9,418.56 | ₹25,430.11 |
| 4 | Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying:a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours.b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours.The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. | 522 | sqm | 647.84 | ₹3,38,172.48 |
| 5 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 290 | sqm | 203.59 | ₹59,041.1 |
| 6 | Finishing with Epoxy paint (two or more coats) on concrete work as per manufacturer specifications including appropriate priming coat. preparation of surface, etc. complete.On concrete work | 120 | sqm | 248.82 | ₹29,858.4 |
| 7 | Engaging Painter. | 10 | Day | 1,197.94 | ₹11,979.4 |
| 8 | LS Amount for Electrification. | 1 | LS | 20,000 | ₹20,000 |
stage.html
html • 0.02 MB
finance_1453472.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.21 MB
Tendernotice_3.pdf
PDF • 0.07 MB
Tendernotice_4.pdf
PDF • 2.00 MB
BOQ_1453472.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .