| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | ₹1.5 L | L1 | Accepted-Finance Financial |
| 2 | L2₹1.6 LAccepted-Finance | ₹1.6 L | L2 | Accepted-Finance Financial |
| 3 | L3₹1.7 LAccepted-Finance | ₹1.7 L | L3 | Accepted-Finance Financial |
Tender Value
₹1.5 L
EMD Value
₹2,000
Closing Date
11 Oct 2023, 12:00 pmClosed
EE, ETD, Bareilly
Hydle Colony, Rampur Garden, Bareilly
Replacement of 36 KV VCB, Attend the Emergency Breakdown and Replacement of C R Pannel at various sub Station, Under ETD, Bareilly
2023_UPTCL_846410_1
Short Term E-Tender No. 05 / ETD / (B) / 2023-24
Open Tender
Electrical Works
15 days
Bareilly
Please Refer In Tender Documents
2 documents required · 2 mandatory
₹590
Ac No 0043002100037996 IFSC PUNB0004300
₹2,000
12 Oct 2023
5 Oct 2023
11 Oct 2023
5 Oct 2023
11 Oct 2023
5 Oct 2023
Amount
Replacement of defective/damaged 33KV VCB Installed at 220KV S/S C.B. Ganj, 132KV S/S Bareilly Town, 132KV Bareilly II(Balipur), 132KY S/S MEERGANJ, 132KV S/S Faridpur &132KV S/S Richha.
Dimantling of 33KV Damaged/Defective VCB after removal of both side jumper and earthing, including shifting of dismantled VCB from switch yard to storage place/store room.
Modification of 33KV VCB foundation as per site requirement/ as per manufacturing drawing or as per direction of supervising Engineer.
Erection of new 33KV VCB in proper alignment and cable Termination of circuit breaker as per logic for tripping/ closing/ spring charging/ indication/supervision ckt with proper ferruling and checking out of breaker operation from Local/remote, including earthing and connection of both side jumpers and works related to complete the erection work. All required T&P. skilled labours, crane/Hydra etc. shall be arranged by the contractor at his own cost.
Dismantling of old Transformer control and relay Panel of 40 MVA at 132kv substation Richha by opening of all the associated control cable termination and earthing strip. Shifting of dismantled panel to store. The work also includes shifting of new control panel from store to site and erection of new 40 MVA transformer control & relay panel, earthing of panel and all the associated cable terminations and and other associated work to complete the commissioning of panel.
Shifting of new 33kv tripple feeder control & relay panel from store to site and erection of new control & relay panel, earthing of panel and all the associated cable terminations and and other associated work at 132kv substation Bareilly Town
Loading of various equipments like CT, PT, LA, PANELS, VCB of different ratings with the help of manual labour/Hydra and safe transportation of above equipments between substations under division (distance under 50 kms) with the help of private vehicles and also safe unloading of above equipments with the help of manual about/Hydra.
M/s S.S. Refregeration
EMC Associates
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid