| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.4 LAccepted-AOC | ₹77.4 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹79.5 LRejected-Finance | ₹79.5 L | L2 | Rejected-Finance L2 bidder |
| Sl No | Description | Qty | Unit | MUHHAMMED IQBAL I L2 | Deepesh Kumar L1 |
|---|---|---|---|---|---|
| 1.00Ground Development work -Removing existing interlock and relaying the Interlock, Fencing and Compound wall Renovation work, Earth filling | |||||
| 1.01 | 2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 5,430.75 | sqm | 9.26 ₹50,292.71 | 9.02 ₹48,958.62 |
| 1.02 | 2.33.2 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 1 | each | 2,451.87 ₹2,451.87 | 2,386.83 ₹2,386.83 |
| 1.03 | 2.33.3 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 1 | each | 11,380.1 ₹11,380.10 | 11,078.22 ₹11,078.22 |
| 1.04 | 100.98.1008 : Engaging Coolie. | 5 | no | 1,081.1 ₹5,405.49 | 1,052.42 ₹5,262.10 |
| 1.05 | 100.98.1009 : Engaging Fitter ( grade 1). | 5 | no | 1,314.07 ₹6,570.37 | 1,279.22 ₹6,396.08 |
| 1.06 | 16.83 : Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 1,516 | sqm | 136.09 ₹2.1 L | 132.48 ₹2.0 L |
| 1.07 | OD69306/2024-2025 : Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of 6mm aggregate etc. all complete as per t1he direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.) (Based on CPWD 16.84) | 1,098 | sqm | 418.77 ₹4.6 L | 407.66 ₹4.5 L |
| 1.08 | 15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 6.96 | cum | 2,514.41 ₹17,500.31 | 2,447.71 ₹17,036.09 |
| 1.09 | OD69007/2024-2025 : Dismantling chain link fencing/ weld mesh fencing of any size, including making rolls and stacking within 50 metres lead. Cost inclusive of cutting charges, labour etc all complete. Derived data observed from the TS estimate no.EST NO:2022/5817 | 160.5 | sqm | 84.83 ₹13,614.44 | 82.57 ₹13,253.29 |
Tender Value
₹79.6 L
EMD Value
₹50,000
Closing Date
31 Jan 2026, 3:00 pmClosed
The Chief Engineer, Sports Kerala Foundation
Jimmy George Indoor Stadium, Vellayambalam, Thiruvananthapuram
Ground Development work -Removing existing interlock and relaying the Interlock, Fencing and Compound wall Renovation work, Earth filling, Ground Protection work - DR Retaining wall, Drain and Inauguration stone
2026_SKF_827653_2
434/SKF/CE/2025-26
Open Tender
Civil Works - Others
180 days
Kollam
Please refer tender document
6 documents required · 6 mandatory
₹2,950
₹50,000
21 Feb 2026
23 Jan 2026
2 Feb 2026
23 Jan 2026
31 Jan 2026
23 Jan 2026
Ground Development work -Removing existing interlock and relaying the Interlock, Fencing and Compound wall Renovation work, Earth filling
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.33.2 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.33.3 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
100.98.1008 : Engaging Coolie.
100.98.1009 : Engaging Fitter ( grade 1).
16.83 : Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
OD69306/2024-2025 : Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of 6mm aggregate etc. all complete as per t1he direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.) (Based on CPWD 16.84)
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
OD69007/2024-2025 : Dismantling chain link fencing/ weld mesh fencing of any size, including making rolls and stacking within 50 metres lead. Cost inclusive of cutting charges, labour etc all complete. Derived data observed from the TS estimate no.EST NO:2022/5817
15.17.2 : Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:Channels, angles, tees and flats
15.34.1 : Dismantling and stacking with in 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of :T or L iron or pipe
16.70.1 : Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts , bolts and washers as required complete as per the direction of Engineer-in- charge.Made of G.I. wire of dia 4 mm
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.18 : Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.9.1 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
50.6.2.2 : Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.22A.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
10.25.2 : Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.88 : Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
13.48.1 : Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD34524/2025-2026 : Filling with available excavated earth(excluding rock) conveyed from Neendakara harbour to the open areas of proposed site at Chavara GHSS ground in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering and rolling every 3rd and top most layer with power roller of minimum 8 tonnes, lead up to 50m and lift up to 1.5m as per the direction of site Engineer-in- charge including all cost of conveyance, hire charges of machinery, all labour charges etc complete. ( Based on DSR Item No. 50.2.26.1 and 2.2.1)
OD31674/2025-2026 : Filling with contractor's own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering and rolling every 3rd and top most layer with power roller of minimum 8 tonnes, for all leads including all lifts involved as per the direction of site Engineer-in-charge. ( Based on DSR Item No. 50.2.26.1 and 2.2.1)
OD66258/2024-2025 : Supply and Installation of movable type 7's Football Goal Post (3.65m x 1.80m x 1.20m) made of pipe 10cm dia G.I. pipe with nylon net as per the direction of engineer in charge.
OD66259/2024-2025 : BADMINTON POST : Supply and installation of heavy duty badminton post in aluminium and steel uprights option with built in weights and floor protection pads. Base,uprights and back supports can be detached. Rate also includes wheels for easy movement, steel uprights (comes in a pair),badminton net etc. Approval shall be taken prior to supply of item. badminton net etc.
Ground Protection work - DR Retaining wall
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.7 : Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Drain
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD66351/2024-2025 : Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete. ( Based on MoRTH 55.25)
Inauguration stone
OD32535/2025-2026 : Providing and fixing 18 mm thick gang saw cut, mirror polished, pre-moulded and pre polished, machine cut for inauguration granite stone of required size, approved shade, colour and texture laid over 20mm thick base of cement mortar 1:4 (1 cement : 4 coarse sand) joint treated with white cement, mixed with matching pigment, epoxy touchups including rubbing, curing etc. complete at all levels. Area of slab over 0.50 sqm(Based on Item 8.2.2.2 of DSR)
16.21 : Engraving letters in hard stone
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1394311.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tenderdoc.pdf
Tender Documents • 1.36 MB
DWG.pdf
Other Document • 0.50 MB
BOQ_1394311.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid