Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
7 Sept 2026, 6:00 pm3d left
DEPUTY CITY ENGINEER-3 SOUTH ZONE
Connection to resolve complaints of low pressure and pollution in various water supply line in millatnagar area, kankriya area and other places in maninagar ward of south zone ARC
340485
Tender Notice No 05 Tender No 268
Open
Miscellaneous Works
Works
Ahmedabad
₹900
Municipal Commissioner, Ahmedabad
₹8,500
31 Aug 2026
31 Aug 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
NO. Item Description Qty. Rate Unit Amount
Labour charges for repairing of lekage CI/Di
pipe line for following dia different places
including necessary excavation manually or
by machinery removing mud dewatering
cleaning of pipe and leakafe portion and
repairing by inserting lead wool jute tools
required for inserting lead wool hiring
charges of excavators Hydra/crane j.c.b
dewatering set fuel operator cost of lead
wool etc complete(including all material but
1 excluding cost of pipel)
Providing, supplying and fixing check nut for
sluice valve. C.I./ M.S./G.M. or Brass.
2 Instruction of engg. In charge
Labour charges for repiaing of Sluice valve /
Reflux valve inlcuding materials, labours and
testing etc. Complete. (i) Replacing of S.S.
Providing and fixing to wall, ceiling and floor
galvanised Mild steel tubes (Medium grade)
of the following nominal bore, tube fitting
and clamps including making good the wall
a 40 mm dia 6.00 436.8 RMT
b 25 mm dia 5.00 283.5 RMT
c 20 mm dia 5.00 205.8 RMT
d 15 mm dia 5.00 162.75 RMT
e 50 mm dia 5.00 569.1 RMT
Providing, laying and jointing in true line and
level U.P.V.C pipe (SCH - 40) of following
dia. including fittings of standard make as
approved by Engineer - in - charge. Pipe
shall be fixed on the wall with the help of
clamp at every shall be concealed as
directed including necessary Tee ,bend, any
joint & any fittings etc. including testing of
pipe and joints and fixing the same with
adhesive solvent, including cost of all
A 15 mm (I.code no. 23061) 20.00 84.87 RMT
B 25 mm (I.code no. 23062) 6.00 107.29 RMT
C 32 mm (I.code no.23063) 5.00 139.2 RMT
D 40 mm (I.code no. 23064) 5.00 173.03 RMT
E 50 mm (I.code no. 23065) 5.00 228.61 RMT
F 110mm (I.code no. 23067) 5.00 551.25 RMT
G 160 mm (I.code no. 23066) 5.00 927.65 RMT
Extra rate over item of excavation of earth for
excavation of asphalt pavement of thickness
upto 0.20 meter including demolishing the
asphalt carpet, metal, soiling etc. comp. with
6 stacking the material as directed.
a)upto0.20meterthickness 10 71.43 SMT
0.20 to 0.30 meter (By any type of Breaker
Machine or R.C.C.Cutter machine including
cost of operator, fuel, & transportation etc
b complete. 10.00 177.76 SMT
c)0.30meter&above(ByBreakerMachine
including cost of operator, fuel,
c &transportationetccomplete. 10.00 312.5 SMT
Providing and Making hole for House
connection on C.I./D.I. or M.S. with labour
7 cost. Instruction of engg. In charge
F 2.0" dia on CI/DI Pipe up to300mm dia. 5.00 2679 NO
Transporting from AMC store and laying
spigot and socket New DI pipe line DI-k-9
pipes of various classes with CI/DI/MS
specials of following diameters. Rate
includes excavation up to minimum 1.0 mt.
depth from top of pipe / as per requirement in
any soil, refilling after laying pipe, covering
and temptation of carting surplus earth up to
30 mt. lead and watering and compaction.
Clearing the site. All Joints shall be made
8 tight & leak free etc. comp.
Removing & relaying of existing CI/DI pipe
line & Specials, Cleaning of pipe & Specials
from Inside, including excavation, refilling
etc. comp. in line & level with any type of
9 joints as per instruction of engg. in charge
A 100 mm 6.00 64 RMT
B 150 mm 5.00 78 RMT
C 200 mm 5.00 94 RMT
9A Only Removing & recover of existing CI/DI
pipeline&Specials,removinganytypeofjoint
carting it to the Muni. Stores as & where
directedasperinstructionofEngg.Incharge with
excavation & refilling.
(A)80mmdia 6.00 63.39 Rmt
(B)100mmdia 5.00 64.29 Rmt
(C)150mm dia. 5.00 77.68 Rmt
(D)200mm dia. 5.00 93.75 Rmt
Labours charges for collecting specials from
Municipals store loading , transportation,
unloading to the site, laying and fixing CI
specials inclusive of all jointing materials like
lead, spun etc.and labour, exacavation re-
filling and nece. dewatering as per
10 instrucation of engg. incharge 150.00 21 K.G
Labour charges for installing and jointing
Sluice Valves including loading, transporting
from owner's store, lowering in location to the
required with excavation refilling alignment
by crane/ tripod and chain block including
cost of total nos. of nuts, bolts, Necessary
gaskets and excluding fixing of tail pieces
with lead & jute etc complete as directed by
11 Engg. in charge.
Cutting of existing pipelines of following
diameters including carting of nece. specials
from AMC store to site and from site to AMC
store (recovered materials) nace. labours for
excavation, jodan & backfilling fitter,
supervisor, etc. complete. Rate also includes
electric cutter, dewatering pump fuel and
transportation of machineries, chain pulley
block if requires working at an instructed
12 specific time of day or night etc. complete.
Supplying, labour for excavation of all types
of soil at any depth including excavation of
asphalt pavement of any thickness,
demolition of brick work in CM of any
proportion including stacking of serviceable
materials and disposal of unserviceable
13 material etc. comp. as directed.
A Mazdoor at day /night 300.00 452 NO
B Makadam/ supervision/Fitter at day / Night 150.00 379.46 NO
Dewatering by pumping set of required
capacity including temporary platform carting
pumping at site and fixing the same in
position including all accessories, and fuel
and labour etc. Complete (A) Pump set of HP/Hr
14 Capacity 5.00 18.32 .
Providing & Supplying JCB Machine on
rental basis in case of emergency situation
and break down type work & also during
unavoidable condition as per instruction of
Engg. In Charge, rate includes all nece.
Shifting, fuel and operating charges and
stacking of useful & non-useful materials
15 separately up to store. 10.00 535.71 Hour
Supplying Pneumatic Breaker Machine for
RCC Slab or Asphalt Demolishing Work on
site by using Operator, fuel, power Supply
16 etc. Complete as Directed. 10.00 535.71 Hour
Excavation for trial pit for location of existing
line including excavation of any depth
17 including refilling, watering etc. Comp 10.00 290 NO
Labour charges for doing washout of water
pipe line at end including necessary
excavation of pit, allowing the water to flow
for 15 minutes twice or thrice as per site
condition during supply hour, dewatering the
pit and plugging with existing wooden butch
and refilling the pit .etc. comp .as per
18 instruction 10.00 670 NO
Supplying wooden taper butches from jungle
19 wood (Like limda, ambo) Etc. comp.
A 15 Mm dia. to 20 MM dia. 25.00 15 NO
B 25 Mm dia. to 37 MM dia. 10.00 20 NO
C 50 Mm dia. 5.00 100 NO
D 80 mm dia to 100 mm dia line 15.00 350 NO
E 150 mm dia 10.00 500 NO
F 200 mm dia 5.00 800 NO
Providing and supplying ISI markedonly
standord lengh stone watre pipes instandsrd
lenghths of following cass and diameter
including all taxes insurance tronsportion
freight charges octroi inspestion charges
loading unioading conveyance to
20 deportmental stores etc.
A 100mm 5.00 113 Rmt
B 150mm 5.00 150 Rmt
Fixing of valve Road box incl .locating valve,
nece. excavation, tem also inclues cartring
form AMC store to site. Etc.Comp. as
21 directed 5.00 446 NO
Conveyancecharge of earth
ime,murrum,building rubbish,manual
garbage,sludge,excavated rock ,fly ash,
aggregateofanykindetc.comp.upto5.0Km.
22 lead 5.00 125.33 Cmt
Hiring of Tractor with trolley considering
23 Hrs. As working Day hours inclu. Driver 5.00 2104.1 DAY
Barricading the entire break down or
excavated area on rental basis using
wooden ballies / M.S. angles at max.
meter centre to centre, C.G.I. Sheet,
reflective paint / Board outside to avoid
accident & for smooth traffic diversion &
movement including cautionary board etc.
Item also includes for making temporary
sufficient nos of lighting arrangement
throughout the work with necessary required
arrangement. ..The same shall be removed
after completion of work. (Only for break
24 down work from start to complete) 9.00 79.99 RMT
Reinstatement of Asphalt road/any kind of
25 paving/flooring using the same material. 9.00 103.57 Smt
LabourChargesforremovingandrecover
ofex.C.I.Sluicevalvewith tail pieces and
carting it up to Muni.Store or site as per
instruction of Engg. Inchargeiteminclude.
necessaryExcavation,removingormaking
joints,refillingetc.comp.asdirectedbyEnggin
(A)80mmdia 4.83 544.64 No
(B)100mmdia 5.00 741.07 No
(D)200mm dia. 5.00 1125 No
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Additional City Engineer
mobile no. (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
"South Zone Office", Opp. Fire Station, Rambaug, Maninagar, Ahmedabad - 380
Municipal Commissioner invites online Percentage Rate sealed tenders from interested contractors
for the work mentioned below.
Connection to resolve complaints of low pressure and pollution in
1 Name of work various water supply line in millatnagar area, kankriya area and other
places in maninagar ward of south zone.(ARC)
2 Time Limit 12Months(atubtmt rmJtg)
3 Tender Validity Period 120 days from the date of submission of the tender
Register “E2” class in PWD in Govt. R&B/CPWD/AMC or equivalent
4 Eligibility Criteria
registration with any other state Govt. Or institutions.
Estimated Cost put to
Earnest Money Deposit Rs.8500/- Demand Draft Or Bank Guarantee in favor of Municipal
Commissioner, Ahmedabad to be submitted as prescribed in tender.
5 % of the Tender Amount in form of Bank Guarantee / Demand Draft
7 Security Deposit in favor of Municipal Commissioner, Ahmedabad to be submitted as
prescribed in tender.
Tender fees Rs.900/-Demand Draft in favor of Municipal Commissioner,
(Non refundable) Ahmedabad)
In separate sealed cover each for EMD and Tender Fees along with
Submission of EMD and
Tender as described in the invitation of tender and submitted to
Assistant Manager(South zone), South zone office, Rambaug,
Maninagar Ahmedabad.
Tenders issue date Tenders from the amc.nprocure.com website shall be downloaded
from AS PER TENDER NOTICE INVITED
As per Notice inviting Tender / Addendum / Corrigendum.The
Last date of receiving
11 tenders received after latest schedule date and time will not be
entertained under any circumstances.
As per Notice inviting Tender / Addendum / Corrigendum to
Date of Opening
12 Assistant Manager / Dy.C.E.(S/Z) office, 2nd Floor, South Zone
Office, Opp. Fire Station, Maninagar, Ahmedabad-380008
Document shall be submitted in sealed envelope systems By
Mode of sending the
13 RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate ( One
Tender Documents
Original & One Duplicate) duly sign & seal by contractor .
14 Terms, Condition, & All general condition of contract mentioned in tender shall be
Specification applicable.
The contractor shall be responsible to make good and remedy at this
own expenses any defect which may developed or may be noticed
before the period mentioned here under from the certified date of
completion, The within 15 days of receipts of the notice. In the case of
failure on the part of the contractor, the Engineer in charge may rectify
or remove or re-execute the work at the risk & cost of the contractor.
The Engineer in charge shall be entitled to appropriate the whole or
any part of the amount of security deposit towards they expenses, If
any, incurred by him in rectification, removal or re- execution. The
defect liability period shall be as under (a) for all works costing up to
Rs. 50,000 (amount put to tender), the period shall be three months
15 Defect &Liability Period
from the certified date of completion. (b) for all works costing more
than Rs. 50,000 and up to Rs. 1 crore (Amount put to tender) ,the
period shall be six (6) month from the certified date of completion or
one monsoon , which ever letter.(c) the major project costing more
than Rs. 1 crore , the period shall be 12 months from the certified date
of completion which should include one monsoon.(d) For building
works , the period specified in (a) ,(b) & (c) above or elapse of
monsoon period following certified date of completion, whichever is
letter . For the purpose of deciding the monsoon period, the
September may be treated as the last date.
0.1% per day delay of remaining work after the completion date but
16 Compensation for Delay
not more than 10% of cost of remaining works.
Water, Electricity Contractor shall have to make his own arrangements for water and
electricity for the purpose of work at site at his own expense
Terms, Condition, & All general condition of contract of Form B1 condition of contract
Specification shall be applicable.
Deduction of Retention Retention @ 2% of the value of work done will be deducted from each
Money from each RA Bill RA bill. It will be released along with release of payment of Final Bill.
Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part Of
20 Addendum/Corrigendum
Tender And The Same As to be Attached Along With The Tender
As per Account department circular no.37, date-09/08/2018 & Circular
21 For ESIC & EPFO Act.
As per AMC Finance Department Circular No. 38 dated 21-11-2022.
22 GST The Rates are Exclusive of GST. Prevailing GST will be paid
Conditional tenders will not be accepted. Municipal Commissionerreserves the rights to reject any or
all the tenders without assigning anyreasons thereof.
Seal and Signature of the Bidder Addl City Engineer
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
TECHNICAL SPECIFICATIONS
Labour charges for repairing of lekage CI/Di pipe line for following dia different places
including necessary excavation manually or by machinery removing mud dewatering
cleaning of pipe and leakafe portion and repairing by inserting lead wool jute tools required
for inserting lead wool hiring charges of excavators Hydra/crane j.c.b dewatering set fuel
operator cost of lead wool etc complete(including all material but excluding cost of pipel)
Labour charges for repairing of lekage CI/Di pipe line for following dia different places including necessary
excavation manually or by machinery removing mud dewatering cleaning of pipe and leakafe portion and
repairing by inserting lead wool jute tools required for inserting lead wool hiring charges of excavators
Hydra/crane j.c.b dewatering set fuel operator cost of lead wool etc complete(including all material but
excluding cost of pipel)
The rate shall be for a unit of one no.
Providing, supplying and fixing check nut for sluice valve. C.I./ M.S./G.M. or Brass.
Instruction of engg. In charge
Providing, supplying and fixing check nut for sluice valve. C.I./ M.S./G.M. or Brass. Instruction of engg. In
The rate shall be for a unit of one no.
Labour charges for repiaing of Sluice valve / Reflux valve inlcuding materials, labours and
testing etc. Complete. (i) Replacing of S.S. Spindle only
Labour charges for repiaing of Sluice valve / Reflux valve inlcuding materials, labours and testing etc.
Complete. (i) Replacing of S.S. Spindle only
The rate shall be for a unit of one no.
Providing and fixing to wall, ceiling and floor galvanised Mild steel tubes (Medium grade) of
the following nominal bore, tube fitting and clamps including making good the wall ceiling
Providing and fixing to wall, ceiling and floor galvanised Mild steel tubes (Medium grade) of the following
nominal bore, tube fitting and clamps including making good the wall ceiling and floor
The rate shall be for a unit of one rmt.
Providing, laying and jointing in true line and level U.P.V.C pipe (SCH - 40) of following dia.
including fittings of standard make as approved by Engineer - in - charge. Pipe shall be fixed
on the wall with the help of clamp at every shall be concealed as directed including
necessary Tee ,bend, any joint & any fittings etc. including testing of pipe and joints and
fixing the same with adhesive solvent, including cost of all materials
Providing, laying, fixing, and jointing in true line and level U.P.V.C. (Unplasticized Polyvinyl
Chloride) pipes of specified nominal diameter (Schedule 40) conforming to IS 4985 / ASTM D1785,
including all standard make fittings (Tees, Elbows, Bends, Couplers, Reducers, Unions, Adapters,
etc.) approved by the Engineer-in-Charge. Work includes fixing on walls/slabs with GI/MS heavy-
duty clamps at intervals not exceeding 1.0 meter (or chasing and concealing in masonry wall with
1:3 cement mortar mix as directed), making solvent cement joints using approved adhesive solvent,
pressure testing of lines and joints, complete with labor, materials, scaffolding, tools, and incidental
Materials Specification
Pipes: UPVC Schedule 40 (pressure rating as per standard), smooth internal surface, lead-
free, non-toxic, conforming to ASTM D1785 / IS
Fittings: Heavy-duty UPVC Schedule 40 solvent weld fittings conforming to ASTM D2466
Solvent Cement: High-strength heavy-bodied solvent cement complying with ASTM
Clamps & Supports: Galvanized Iron (GI) or M.S. metal clamps with wooden/rubber
spacers and anchor fasteners.
Workmanship & Execution
Cutting & Preparation: Pipes cut clean and perpendicular to the axis using fine-toothed
saws; edges deburred, chamfered, and cleaned with a dry cloth or suitable cleaner.
Jointing Procedure: Apply a uniform coat of solvent cement to the outer pipe end and inner
fitting socket, push home immediately with a quarter-turn, and hold firmly for 30 seconds to
allow initial set.
Fixing & Aligning: Secure pipes horizontally and vertically using clamps fixed to walls at
maximum 1.0 m spacing (0.8 m for smaller diameters). Vertical chases in walls must be
neatly cut, pipes secured, and plastered flush with 1:3 cement-sand mortar.
Testing: The entire line shall be hydrostatically tested at a minimum working pressure of
times the operating pressure (or 7–10 kg/cm²) for a continuous period of not less than
minutes without showing any leaks or drop in pressure.
The rate shall be for a unit of one rmt.
Extra rate over item of excavation of earth for excavation of asphalt pavement of thickness
upto 0.20 meter including demolishing the asphalt carpet, metal, soiling etc. comp. with
stacking the material as directed. a)upto0.20meterthickness(ByManual) 0.20 to 0.30 meter
(By any type of Breaker Machine or R.C.C.Cutter machine including cost of operator, fuel, &
transportation etc complete. c)0.30meter&above(ByBreakerMachine including cost of
operator, fuel, &transportationetccomplete.
Extra rate over item of excavation of earth for excavation of asphalt pavement of thickness upto 0.20 meter
including demolishing the asphalt carpet, metal, soiling etc. comp. with stacking the material as directed.
a)upto0.20meterthickness(ByManual) 0.20 to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter
machine including cost of operator, fuel, & transportation etc complete.
c)0.30meter&above(ByBreakerMachine including cost of operator, fuel, &transportationetccomplete.
The rate shall be for a unit of one smt.
Providing and Making hole for House connection on C.I./D.I. or M.S. with labour cost.
Instruction of engg. In charge
Providing and Making hole for House connection on C.I./D.I. or M.S. with labour cost. Instruction of engg. In
The rate shall be for a unit of one no.
Transporting from AMC store and laying spigot and socket New DI pipe line DI-k-9 pipes of
various classes with CI/DI/MS specials of following diameters. Rate includes excavation up
to minimum 1.0 mt. depth from top of pipe / as per requirement in any soil, refilling after
laying pipe, covering and temptation of carting surplus earth up to 30 mt. lead and watering
and compaction. Clearing the site. All Joints shall be made tight & leak free etc. comp.
Transporting from AMC store and laying spigot and socket New DI pipe line DI-k-9 pipes of various classes
with CI/DI/MS specials of following diameters. Rate includes excavation up to minimum 1.0 mt. depth from top
of pipe / as per requirement in any soil, refilling after laying pipe, covering and temptation of carting surplus
earth up to 30 mt. lead and watering and compaction. Clearing the site. All Joints shall be made tight & leak
free etc. comp.
The rate shall be for a unit of one rmt.
Removing & relaying of existing CI/DI pipe line & Specials, Cleaning of pipe & Specials from
Inside, including excavation, refilling etc. comp. in line & level with any type of joints as per
instruction of engg. in charge
Specifications for above Item are as under.
Labour charges includes clearing recovered pipes by means of long rigid pipe of suitable
length. Pipe should be cleaned from inside. The contractor should remove all clots and rusted
parts from inside pipe surface.
This Specification covers the requirements for collecting from Municipal Stores or
contractor’s stack yard transportation of cast to work sites, laying, jointing and field
testing of cast iron pipes and fittings for the water distribution Network.
Cast iron/ Ductile iron pipes and fittings shall be transported from the Municipal Stores
ocontractor’s stack yard to the work sites at places along the alignment of pipeline as directed
by Owner/Engineer. The Contractor shall be responsible for the safety of pipes and fitting in
transit, loading/unloading. Every care shall be exercised in handling pipes and fittings to avoid
damage. While unloading, the pipes and fittings shall not be thrown down from the truck on
the hard surfaces. They shall be unloaded on timber skids with steadying ropes of by any
other means. Padding shall be provided between coated pipes, fittings and skids to avoid
damage to the coating. Suitable gaps between pipes should be left at intervals in order to
permit access from one side to the other. In case of spigot socket pipes, care should be taken
regarding orientations of pipes while unloading. As far as possible pipes shall be unloaded on
one side of the stretch only. The pipes shall be checked for any visible damage (such as
broken edges, cracking or spalling of pipe ) while unloading and shall be sorted out for
reclamation. Any pipe which shows sufficient damage to precude it from being used shall be
discarded. Dragging of pipes and fittings along concrete and similar pavement with hard
surfaces shall be prohibited. necessary warning boards and lamps should be provided in front
and side of pipes to avoid any accident. Pipes should be stacked with sufficient packing to
prevent rolling of the same. Contractor will be fully responsible for any accident due to pipes or
other materials stacked on site of yard. Contractor will be fully responsible for any legal
formalities arising due to such accident and all legal compensations and legal charges there of
shall be paid by contractor of will be recovered from his running bill of the same or other AMC
Before excavating the trench, the alignment of pipeline shall be approved by Owner/Engineer.
The excavation for trenches and pits for manholes/chambers shall be carried out in
accordance with specification and shall be done such that it does not get far ahead of the
laying operations as approved by the Owner/Engineer.
Utmost care shall be taken to see that width of the trench at the top of pipe is not more than
that specified in Data Sheet . In case additional width is required it shall be provided only in
the top portion from the ground level upto 300 mm above the crown of pipe. If any extra width
is excavated in the area below this portion, the Contractor shall have to provide remedial
measures as directed by Engineer. Contractor shall not be paid any additional compensation
for extra excavation as well as for remedial measures. If rock is met with, it shall be removed
to 15 cm below the invert level of pipes and fittings and the space resulting shall be refilled
with excavated materials and properly consolidated. Bottom of trenches/pits shall be saturated
with water well rammed wherever the Owner/Engineer may consider it necessary to do so.
Wherever a socket of pipe or fitting occurs, a grip is to be cut in the bottom of the trench or
concrete bed to a depth of at least 75 mm below the bed of the pipe and does not rest upon its
socket. Such grip shall be of sufficient size in every respect to admit the hand all around the
socket in order to make the joint and the grip shall be maintained clear until the joint has been
approved by Owner/Engineer.
The road metal and also the rubble packing shall first be stripped off for the whole width of the
trench/pit and separately deposited in such places as may be determined by the
Owner/Engineer. In case of the metal packing or Khandkies not being so deposited or being
mixed up with excavated materials and not available for backfilling and making good the
excavation, the cost of the new metal, packing or Khandkies required shall be charged to the
The material from excavation shall be deposited on either side of the trench leaving adequate
clear distance from the edges of the trench and pit or as may be necessary to prevent the side
of the trench/pit to slip or fall or at such a distance and in such a manner as to avoid covering
fire hydrants, sluice valves, manhole covers etc. and so as to avoid abutting any existing wall
or structure or causing inconvenience to the public and other service organizations of
otherwise as Owner/Engineer may direct.
Contractor shall at the rates entered in the schedule additional excavation, take into account
additional excavation if any as Owner/ Engineer may require in order to locate the position of
water pipes, drains, sewers, etc or any other works which may be encountered. Such service
lines if met with during excavation shall be properly maintained by Contractor by means of
shoring, strutting, planking over, padding or otherwise as Owner/Engineer may direct and shall
be protected by the Contractor from damage during the progress of the work. All precautions
shall be taken during excavation and laying operations to guard against possible damage to
any existing structure/pipeline of water, gas, sewage etc. If there is any damage then such
damage shall be made good either by Contractor or by other agency, as Owner/Engineer may
decide and wholly in either case at the expense of Contractor.
If work for which the excavation has been made is not completed by the expected date of
setting in of rain or before the day fixed by Owner/ Engineer for filling in any excavation on
account of any festival or special occasion, Contractor shall backfill such excavation and
consolidate the filling at his own expenses as directed by Owner/ Engineer and shall re-
excavate when required at his own cost.
The excess excavated material shall be transported from site of works to a place upto a
distance of 5 km. as directed by Owner/ Engineer immediately so as not to cause any
inconvenience to the public or traffic.
Contractor shall not be paid any additional compensation for excess excavation over what is
specified as well as for any remedial measures that are specified.
The excess excavated material shall be carried away from site of works as specified, failing
which in view of public safety and traffic convenience Owner/ Engineer may carry out the work
by any other agency at Contractor's risk and cost.
The rate shall be for a unit of one rmt.
Labours charges for collecting specials from Municipals store loading , transportation,
unloading to the site, laying and fixing CI specials inclusive of all jointing materials like lead,
spun etc.and labour, exacavation re-filling and nece. dewatering as per instrucation of engg.
Labours charges for collecting specials from Municipals store loading , transportation, unloading to the site,
laying and fixing CI specials inclusive of all jointing materials like lead, spun etc.and labour, exacavation re-
filling and nece. dewatering as per instrucation of engg. incharge
The rate shall be for a unit of one kg.
Labour charges for installing and jointing Sluice Valves including loading, transporting from
owner's store, lowering in location to the required with excavation refilling alignment by
crane/ tripod and chain block including cost of total nos. of nuts, bolts, Necessary gaskets
and excluding fixing of tail pieces with lead & jute etc complete as directed by Engg. in
Labour charges for installing and jointing Sluice Valves including loading, transporting from owner's store,
lowering in location to the required with excavation refilling alignment by crane/ tripod and chain block
including cost of total nos. of nuts, bolts, Necessary gaskets and excluding fixing of tail pieces with lead & jute
etc complete as directed by Engg. in charge.
The rate shall be for a unit of one no.
Cutting of existing pipelines of following diameters including carting of nece. specials from
AMC store to site and from site to AMC store (recovered materials) nace. labours for
excavation, jodan & backfilling fitter, supervisor, etc. complete. Rate also includes electric
cutter, dewatering pump fuel and transportation of machineries, chain pulley block if
requires working at an instructed specific time of day or night etc. complete.
The excavation for jointing work shall be done to the required for width, length & depth as directed by
Engineer-in-charge or his representative. The excavated materials from the gap shall have to be deposited
within a lead of 50 mt. or as directed by Engineer-in-charge. The relevant specification for excavation &
refilling shall confirm to item No.2 above.
After completion of excavation work, jointing shall be done between the period of two water supply time, in
such a way that it will not affect the water supply time in any part of city .This item includes the work of
cutting the existing line labour for jointing of CI specials & valves with the existing line the dewatering
required etc. complete.
All the necessary care shall be taken by the contractor during jointing work, so that pipe shall not be
cracked the cutting limit.
After completion of jointing work & testing of lead joints, the gap shall be refilled after obtaining necessary
permission of Engineer-in charge of the work.
The jointing work shall be in line & level with other existing network.
The Payment shall be made on No.basis for all the jointing work made for this work.
Supplying, labour for excavation of all types of soil at any depth including excavation of
asphalt pavement of any thickness, demolition of brick work in CM of any proportion
including stacking of serviceable materials and disposal of unserviceable material etc.
comp. as directed. (A) Mazdoor at day /night (B) Makadam/ supervision/Fitter at day / Night
Supplying, labour for excavation of all types of soil at any depth including excavation of asphalt pavement of
any thickness, demolition of brick work in CM of any proportion including stacking of serviceable materials
and disposal of unserviceable material etc. comp. as directed. (A) Mazdoor at day /night (B) Makadam/
supervision/Fitter at day / Night
The rate shall be for a unit of one no.
Dewatering by pumping set of required capacity including temporary platform carting
pumping at site and fixing the same in position including all accessories, and fuel and
labour etc. Complete (A) Pump set of Capacity
Pump Set: Heavy-duty self-priming centrifugal pump or non-clog submersible dewatering
pump set of approved make, rated capacity, and head.
Accessories: Standard suction line with strainer and non-return foot valve; rigid/flexible
delivery piping extending up to the designated safe disposal point; suction hoses, couplings,
and electrical control gear.
Support System: Heavy timber sleepers, steel frames, or scaffolding for mounting pumps
securely clear of rising water levels.
Fuel & Spares: Supply of diesel, oil, grease, or electricity connection along with immediate
standby wearing parts (impellers, seals, hoses).
Execution & Operation Rules
Installation: Pump sets shall be mounted on stable platforms above water level with suction
strainers properly immersed and clear of mud/silt buildup to prevent clogging.
Disposal of Dewatered Water: Water pumped out must be conveyed through closed pipes
or lined channels to the nearest storm drain or approved natural watercourse without flooding
adjacent properties, roads, or damaging nearby structures.
Continuous Operation: Dewatering shall run continuously day and night (24x7) as required
during excavation, sub-structure concrete, or masonry work until the concrete/masonry
achieves initial set and curing stability.
Standby Provision: The contractor shall maintain at least one standby pump set of equal
capacity at the site to prevent flooding during power failures or mechanical breakdowns.
The rate shall be for a unit of one hrs.
Providing & Supplying JCB Machine on rental basis in case of emergency situation and
break down type work & also during unavoidable condition as per instruction of Engg. In
Charge, rate includes all nece. Shifting, fuel and operating charges and stacking of useful &
non-useful materials separately up to store.
Transporting, shifting, mobilization, and demobilization of the machine to and from the site.
Fuel, lubricants, oils, operational wear-and-tear, maintenance, and repairs.
Services of a qualified, licensed operator along with skilled/unskilled helpers.
Clearing, handling, and systematic sorting/stacking of serviceable and unserviceable (useful
and non-useful) excavated materials separately up to the municipal or site store.
Execution & Operational Rules
1. Deployment & Mobilization:
o The contractor must supply the machine within the specified emergency response
timeframe upon receiving instructions from the Engineer-in-Charge.
The machine supplied must be in sound mechanical condition with functional
hydraulic systems, front loader, and rear backhoe attachments.
2. Fuel & Crew Provision:
o The contractor is entirely responsible for arranging fuel, lubricants, maintenance,
operator wages, and helper allowances. No extra payment will be made for fuel or
operational overheads.
3. Material Handling & Stacking:
o Useful materials (e.g., sound paving stones, reusable aggregates, un-damaged pipe
sections) must be carefully separated from non-useful debris/rubble and stacked
neatly in designated store areas as directed by the site authority.
4. Breakdown Non-Payment Clause:
o No payment shall be allowed for idle time, breakdowns, non-working machine
conditions, or maintenance downtime.
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by
using Operator, fuel, power Supply etc. Complete as Directed.
Mobilization, demobilization, cartage, and shifting of the complete pneumatic breaker unit,
air compressor, air hoses, couplings, lubricator, and heavy-duty chisels/points to and from the
All operational charges including fuel (diesel/petrol), engine oil, lubricants, repair,
maintenance, and replacement of worn chisels.
Continuous power supply/compressed air supply required for non-stop breaking operation.
Engagement of qualified, experienced machine operators along with skilled labor/helpers.
Neatly breaking the RCC slab/asphalt to manageable sizes, cutting embedded reinforcement
steel (if required), and systematically sorting and stacking usable and unusable material clear
of the work area as directed.
Execution & Operational Guidelines
1. Equipment Condition:
o The pneumatic breaker (typically 20 kg to 35 kg weight class) and air compressor
must be in top mechanical condition, capable of delivering continuous high-impact
blows without frequent breakdown.
o Anti-vibration handles and silencers/mufflers should be present where noise and
vibration compliance is required.
2. Safety & Site Controls:
o Operators must wear proper Personal Protective Equipment (PPE) including safety
boots, eye goggles, heavy-duty gloves, and ear mufflers.
o Adjacent existing structures or underground utilities must be protected from over-
breakage or impact damage during operation.
3. Breakdown Non-Payment Clause:
o Payment shall only be made for actual productive working hours logged. No
payment will be allowed for machine idle time, breakdown hours, fuel replenishment
downtime, or waiting time.
Excavation for trial pit for location of existing line including excavation of any depth
including refilling, watering etc. Comp
Labour charges for doing washout of water pipe line at end including necessary excavation
of pit, allowing the water to flow for 15 minutes twice or thrice as per site condition during
supply hour, dewatering the pit and plugging with existing wooden butch and refilling the pit
.etc. comp .as per instruction
Supplying wooden taper butches from jungle wood (Like limda, ambo) Etc. comp.
Providing and supplying ISI markedonly standord lengh stone watre pipes instandsrd
lenghths of following cass and diameter including all taxes insurance tronsportion freight
charges octroi inspestion charges loading unioading conveyance to deportmental stores
Providing and supplying ISI markedonly standord lengh stone watre pipes instandsrd lenghths of following
cass and diameter including all taxes insurance tronsportion freight charges octroi inspestion charges loading
unioading conveyance to deportmental stores etc.
The rate shall be for a unit of one rmt.
Fixing of valve Road box incl .locating valve, nece. excavation, tem also inclues cartring
form AMC store to site. Etc.
Fixing of valve Road box incl .locating valve, nece. excavation, tem also inclues cartring form AMC store to
The rate shall be for a unit of one no.
Conveyancecharge of earth ime,murrum,building rubbish,manual garbage,sludge,excavated
rock ,fly ash, aggregateofanykindetc.comp.upto5.0Km. lead
All the surplus earth etc. shall be carried away immediately from the site of work to a place
within 5 km. distance or as directed and ordered by the Engineer, so as not to cause any
inconvenience to the public traffic finding which in view of public safety and traffic convenience. The
Corporation shall carry out the work by any other agency at the contractor’s risk and cost. if the
instructions are not complied within 7 days from the date of order to cart the surplus materials and
clear the site, the said work shall be carried out by the Municipal Corporation at the risk and cost of
the contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the
same shall be carried out by the contractor without asking any extra rate. The contractor shall have
to cart the surplus earth after the trenches we will watered and refilled with the sand. The rate of
carting including carting of brick bats, metal, rubble vegetable and garbage, if necessary to clear the
Hiring of Tractor with trolley considering 8 Hrs. As working Day hours inclu.
The rate shall be for a unit of one hrs.
Barricading the entire break down or excavated area on rental basis using wooden ballies /
M.S. angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board outside
to avoid accident & for smooth traffic diversion & movement including cautionary board etc.
Item also includes for making temporary sufficient nos of lighting arrangement throughout
the work with necessary required arrangement. ..The same shall be removed after
completion of work. (Only for break down work from start to complete)
Barricading the entire break down or excavated area on rental basis using wooden ballies / M.S. angles at
max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board outside to avoid accident & for smooth
traffic diversion & movement including cautionary board etc. Item also includes for making temporary
sufficient nos of lighting arrangement throughout the work with necessary required arrangement. ..The same
shall be removed after completion of work. (Only for break down work from start to complete)
The rate shall be for a unit of one rmt.
Reinstatement of Asphalt road/any kind of paving/flooring using the same material.
Labour Charges for removing and recover of ex. C.I. Sluice valve with tail pieces and carting
it up to Muni. Store or site as per instruction of Engg. Incharge item include. necessary
Excavation,removing or making joints,refilling etc.comp.as directed by Enggin charge.
Labour Charges for removing and recover of ex. C.I. Sluice valve with tail pieces and carting it up to Muni.
Store or site as per instruction of Engg. Incharge item include. necessary Excavation,removing or making
joints,refilling etc.comp.as directed by Enggin charge.
The rate shall be for a unit of one no.
13. કો ાકટર ારા ESIC અને EPFO ર શન ગેના અ. .ુ કોપ . નાણાં ખાતા
ESIC અને EPFO ર શન કો ાકટર ીઓએ ટ ડર સાથે ર ુ કરવા ંુ રહશે.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water
Resources Department with the latest correction slips may be referred for quality of
construction & standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be
taken to mean as reference to the latest edition of the same of force on the date of
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence
of specific mention for a particulars point / aspect, the same in the relevant Indian
Standards shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out
nearest to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in
charge/ Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well
as for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at
the site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if
proposed to be adopted by the contractor shall be considered only if the contractor
provided satisfactory evidence that such special mode of construction and completion of
work to the required strength and quality. Acceptance of the same by the Engineer in
charge shall not however, absolve the contractor from the responsibility of any adverse
effect and concordance of adopting the same in the course of exaction or completion of
14. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government
from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various
relevant Indian Standard) shall be taken to engrave the safety of men, materials and
machinery on the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to
the quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission
18. The work in general shall be carried out as per standard specifications of the relevant
items to be executed & as per the instruction of Engineer in charge & as per the guidance
of AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written work
order to the contractor after fullfillng the formality life SD & Agreement. No time
extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation
given by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations
as necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour
26. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water
for drinking, washing, sanitation and cleaning down. The contractor will be responsible
for all the costs where applicable of connection, meter installation, water consumed,
water required for testing purposes, disconnection and the laying, maintenances and
ultimate removal of any distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site
for purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for
use of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income
tax clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued
by Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes
& thereby total amount of work increases/ decreases.
& thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding on
the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 10 days from the date if
issue of Letter of Interest (LOI). And after paying the balance S.D. the time limit will be
started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 10 days penalty at the rate of
0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, If work is not started because of monsoon or any
other special reason (like site is not available), after evaluation of situation the actual
date of starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the
39. The payment shall be made as per the A.M.C policy for the work done by the contractor.
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per
guidelines published by WHO/ Center government/State government /Ahmadabad
municipal Corporation.
Signature of contractor with seal Additional City Engineer (S.Z)
Date Ahmedabad Municipal Corporation
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad
MunicipalCorporation, A'bad specified up to his first written demand, without demur without delay
andwithout the necessity of a previous of judicial or administrative procedures and without
thenecessity to prove to the Bank the defects or short comings or debits of the contractor any
2. We further agree that the Guarantee herein contemned shall remain in full force and effectduring
the period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the
tender)we shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consentof
the Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tendereror of
Date: Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender isaccepted
and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
South Zone, Ahemedabad
Name of Works: - Connection to resolve complaints of low pressure and pollution in
various water supply line in millatnagar area, kankriya area and other places in
maninagar ward of south zone.(ARC)
I/We the undersigned have carefully gone through and clearly understood the Tender documentsfor the above
work. I/We have satisfied myself/ourselves as to the location of site, examined drawings.I/We have visited
site & fully acquainted with local situations regarding materials, labours & others factorspertaining to work
before submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in
accordance with the specification, designs, drawing and instruction in writing referred to in the saiddocument
and with such materials as are provided for, at the respective rates which I/we have quoted in theschedule-B
or at such other rates as maybe fixed under the provisions of these conditions.In the event of this tender being
accepted I/We agree to enter into an agreement and when required andexecute the contract, according to your
fom1 of agreement as or in default where of I/we bindmyself/ourselves to forfeit the "Earnest Money
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC
fromthe date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and
takenecessary action as deemed fit.
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit", for
thesum as mentioned in tender notice, the full value of which is to be absolutely forfeited to the Employer
IfI/We fail to commence the work specified. Otherwise the said sum shall be retained, by the Employer as
onaccount of such. Security)' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in accordance
withConditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may receive.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date
ofopening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on work,
octroiduties and other prevailing Government taxes/charges on such items on which the same are leviable and
therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractor
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR.ytÃgt ctœ 10 rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex Che ðgth ctœ&e dKJtbtkk ytJNu.
<ubs ðgth ctœ Jfo ytuzoh R~gw&gu&e mbtg bgtoœt NY &guje dKtNu.<&t <u mt&u fhthvºt fhJtltu hnuNu. ylu<u bwsc ftb NÁ
fhJtle <theF dKJtbtk ytJNu. yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -10 fh<tk J^w rJjkc ltk rfMmt
btk <ubs Jfo ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e «r<rœl bkswh xuLzh hfbltk 0.01 % juFu vulÕxe cej btk&e ftvJtbtk
ytJNu. <ub A<tk rJrNÐ rfMmt btk atubtmt ltk fthKu y&Jt yrlJtgo fthKtumh ftb NÁ &R Nfu <ub l ntug <u rfMmt btk gtuøg<t
aftme zu.Bgw.frb©h (œ.Ítul) le bkswhe bu¤Je ftb NÁ fhJtle <theF dKJtbtk ytJNu.
2. xuLzh Jujezexe 90 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe fhJuht ChJtle sJtc>the
ftuLx[tfxhle hnuNu.
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u bwsc ftuLx[tfxlt cejbtk&e fvt<
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb cejbtk&e ftve juJtbtk ytJNu.
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk ytJNu.
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb ytvJtbtk ytJNu.
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu y.BGþ.ftuvotu.btk btLg ftuLx[tfxhtu le gtœebtk
hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu. su BGþrl.ftuvtuohuNl Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvotu.lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk ytJNu.
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu zu.BGþrl.frbNlh©eltu rlKog ytFhe hnuNu.
14. >huf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl MxtLzzo ftuz ytuV «ufxem ltkk btLg ^tht
^tuhKtu Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu rlKog ytFhe hnuNu. Jtuxh´d fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ
WvtzJtbtk lrn ytJu <tu ftuLx[tfxhltk Fauo ylu òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu
cejbtk&e hfb ftve juJtbtk ytJNu.
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s yuf s c<tJuj søgtyu fhJwk vzNu. yuf
ftb ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu lrn.
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEl lu LþfNtl &Nu <tu <ule mkÃËKo
sJtcœthe (òlbtjle) ftuLx[tfxhle vtu<tle hnuNu. mtEx vh ftb œhBgtl bswh fu sl<t lt ftuE btKmlt òlbtjlu lwfNtl
&tg <ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegt>&tg <tu <ule sJtc>the vK ftuLx[tfxhle hnuNu. CuFz ^me l vzu <ule
sJtc>the vK vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk
W<thJt, mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vhegt>btk sJtct>h hnuNu
ylu BGþrl.ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxÕþk mbSlu s xuLzh ChÔþk. Btswhtultu rJbtu vK
17. juch yufx «btKu<ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015bwsc <btb juch / bsqhtulwk dwsht< rcÕzekd yuLz
y^h fLMx[[fNl Jfombtkk VhSgt<hSMx[uNl fhtJJt ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu.
juch yufx «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu<ulu vubuLx ytvJtbtk ytJNu lrn
<ubs ct¤ bswhtulu ftb Wvh htFe NftNu lrn.<ubs JF<tu JF< Bgw. frBNlh©e îtht fhJtbtkk ytJuj mh¾gwjhtule Nh<tu
ftuLx[[tfxhlu ckk^l f<to hnuNu.
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu LþfNtle- J¤<hltu n¬ >tJtu fhe NfNu
lrn fu ftg>tfeg ftgoJtne yt ykdu &E NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s >uJtLþk Au <uJtu &E NfNu lrn.
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl VuhVth &Jtle N¾g<t hnuje Au.
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu <u ykdu ftuLx[tfxh îtht ftuEvK «fthle
J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu ftb ytuAw &tg <tu ftuLx[tfxhle J¤<hle btkdKe MJefthJtbtk ytJNu lrn.
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE sJtltu hnuNu. yLg&t ftuvtuohuNl îtht <u
hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule LþfNtlele sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve NfNu.
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux
nt<k btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu.
juch yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux
nt<k btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu.
juch yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf Bþsc yLþmhJtltk hnuNu. Mt>h ÃþM<eft
øþsht< çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-21, dtk^eldh&e b¤e hnuNu. su Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt ykdultu mkÃËKo Fao <&t
Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t buLGþVufah´d søgt Mþ^e jtJJt -jE sJtltu Fao vK ftuLx[tfxhu CtudJJtltu hnuNu.
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb atÕþ > vnujt, atÕþ ftbu <&t ftb
ÃËKo >ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk hnuNu <u rmJtg ftbLþk vubuLx fhJtbtk ytJNu lrn òu MxtV MËalt ytvu <tu
fubuhtbtk&e ftuBÃGþxhbtk Vtuxt x[tLmVh fhe ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk ytJNu lrn.
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle btkdKe fhe NfNu lrn. yt
Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt hnuNu. sgtk ftuE atuFJx
l &E ntug ðgtk ytE.yum.ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu muBvj yu«wÔz fhtÔgt ct>
ftb NY fhtJJtLþk hnuNu.
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu ylu òu yum.ytu.yth.btk ytExb l
ntug <tu btfuox huEx&e huEx yultjemem fhe su CtJ Ft<t <hV&e ytvu <u ftuLx[tfxhu juJtltu hnuNu. yt mbSlu s xuLzh ChJtLþk
hnuNu. J^tht le ytRxb btk ftuLx[tfxhle btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt, CgMËaf ctuzo, jtj xul , cuhefuxekd xuv,
ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu mtaJJtLþk hnuNu. ylu ftuEvK yfMbt<&Nu <tu <ule mkÃËKo sJtc>the ftuLx[tfxhle
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus ytme.mexe yuLSlegh©ele <ubtk mne
juJtle hnuNu, <ubtk >hhtus ftb fh<t bswhtule mkÏgt, fhuj ftbdehe <&t yr^ftheytuyu ftb Mþ^thJt fu «tud{um J^thJt ltuk^ fhuj
ntug <tu <uLþk ftuBÃjtgLm ytvJtLþk hnuNu ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle
m•tt yuze.mexe yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh ftuE Jtk^tu jE NfNu lrn.
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu vulÕxe BGþrl.ftuvtuohuNllu åþfJJtle hnuNu.
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
Wvhtuf<<btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the works.
Progress of work should be in proportion to time limit. The details of reinforcement of R.C.C. work
shall be as per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may
be brought by him on site. This account shall be regularly maintained and kept open for inspection
by Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall
be made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements
of binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall
be final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the
rejected materials shall be removed from site within 24 hours by contractor at this risk and cost.
Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall
have to prepare through of bigger size and mix the mortar in the required proportion. In on case he
shall be allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have
to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest
SOR or if item is not available in SOR than based on current market rates. In case of extra item
decision of Add.City Engg.shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of
the propose work the contractor shall carry out the same at his quoted rates without charges any
extra and the contractor will have to carry out the works and he will be paid at the rate quoted by
him. No claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors
shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work.
Contractor will be fully responsible for compliance of the various provisions under contract Act.
1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (90) days from the date of opening of
the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer
on his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If work is not started within specified time limit i.e. within ten days from the date of order to
start the work the penalty of the 0.01% tender Amount per day of delay of start shall be recovered
separately from the immediate bills payable to the contractor. Contractor has to make his own
arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully :-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form
of demand draft.
iv) Condition of Form - B1 only Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept.
- Govt. of Gujarat booklets of Building Works & and Road Works Specifications published
by Gujarat Book Depot, Sector-21. Gandhinagar. Other techinical condition will be
applicable as per tender condition only.
CONTRACTOR'SSIGNATURE & STAMP ADD. CITY ENGINEER
Mobile No.:- (South Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender no.268 Milattnagar.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].