Executive Engineer, Panchayat (R&B) Division, Tapi
15th Finance Commission 2020-21 PROPOSED CONSTRUCTION OF LIBRARY AT.PANIYARI TA:VYARA , DIST.TAPI
298209
31 OF 2025-26
Open
Civil Works - Buildings
Tapi
6 documents required · 6 mandatory
₹1,500
Executive Engineer, Panchayat (R&B) Division, Tapi-Vyara
₹46,000
21 Apr 2026
21 Apr 2026
21 Apr 2026
29 Apr 2026
21 Apr 2026
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
1 Excavation for foundation upto 1.5 m depth including 312.38 CMT. 120.00
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead. (A)
Loose or soft soil ( I ) 0 To 1.5 mt. Depth
2 Excavation for foundation upto 1.5 m to 3.0 m depth 173.77 CMT. 132.86
including sorting out and stacking of useful
materials and disposing off the excavated stuff upto
Meter lead. (A) Loose or soft soil ( II ) 1.5 To 3.0 MT
3 Filling in plinth with sand under floors including 34.86 CMT. 471.69
watering ramming, consolidating and dressing
complete (A) Foundation and plinth
4 Filling available excavated earth (Including rock in 383.28 CMT. 133.65
trenches plinth, sides of foundations etc. in layers not
exceeding 20 cm. in depth consolidating each deposited
layer by ramming and watering)
5 Providing & filling in plinth with murrum or yellow soil 139.45 CMT. 296.29
watering, ramming & consolidation etc. complete.
6 Providing and laying cement concrete 1:2:4 (1- Cement 65.69 CMT. 3966.27
:2- Coarse sand : 4- graded stone aggregates 20 mm
nominal size) and curing complete including cost of
formwork in (A) Foundation and Plinth (A) PCC
7 Providing and laying controlled cement concrete M.250 72.05 CMT. 4534.90
and curing complete inculding the cost of formwork but
Excluding the cost of reinforcement for reinforced
concrete work in foundation, footings base of column
and mass concrete. (A) Footing/ Raft
8 Providing and laying controlled cement concrete M.250 7.77 CMT. 7176.05
and curing complete inculding the cost of formwork but
Excluding the cost of reinforcement for reinforced
concrete work in All Types of Column D) Column,
Pillers, posts and struts , upto Plinth
9 Providing and laying controlled cement concrete M.200 11.83 CMT. 7139.69
and curing complete inculding the cost of formwork
and Excluding reinforcement for reinforced concrete
work in in All Types of Column D) Column, Pillers,
posts and struts upto Ground Floor
10 Providing and laying controlled cement concrete M.200 2.92 CMT. 7180.94
and curing complete inculding the cost of formwork
and Excluding reinforcement for reinforced concrete
work in in All Types of Column D) Column, Pillers,
posts and struts upto First Floor
11 Providing and laying controlled cement concrete work 22.04 CMT. 6450.87
M250 and curing complete including the cost of form
work but excluding the cost of reinforcement of
reinforced concrete work in Beams. (E) Beam, upto
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
12 Providing and laying controlled cement concrete work 22.04 CMT. 6413.50
M200 and curing complete including the cost of form
work but excluding the cost of reinforcement of
reinforced concrete work in Beams. Ground Floor
13 Providing and laying controlled cement concrete work 2.76 CMT. 6454.75
M200 and curing complete including the cost of form
work but excluding the cost of reinforcement of
reinforced concrete work in Beams. first Floor
14 Providing and laying controlled cement concrete work 33.15 CMT. 6356.94
M200 and curing complete including the cost of form
work but excluding the cost of reinforcement of
reinforced concrete work in All Types of Slabs. Ground
15 Providing and laying controlled cement concrete work 2.56 CMT. 6303.41
M200 and curing complete including the cost of form
work but excluding the cost of reinforcement of
reinforced concrete work in All Types of Stair case
Ground Floor
16 Providing and laying controlled cement concrete work 1.53 CMT. 6546.82
M200 and curing complete including the cost of form
work but excluding the cost of reinforcement of
reinforced concrete work in All Types of Wall,All
Thickness in Walls PARDI upto Ground Floor
17 Providing and laying controlled cement concrete work 1.55 CMT. 7311.39
M200 and curing complete including the cost of form
work but excluding the cost of reinforcement of
reinforced concrete work in Lintel. upto Ground Floor
18 Providing and laying controlled cement concrete work 0.14 CMT. 7352.64
M200 and curing complete including the cost of form
work but excluding the cost of reinforcement of
reinforced concrete work in Lintel. upto First Floor
19 Providing and laying controlled cement concrete work 6.48 CMT. 7002.33
M200 and curing complete including the cost of form
work but excluding the cost of reinforcement of
reinforced concrete work in Chajja. Upto Ground Floor
20 Providing and laying controlled cement concrete work 0.34 CMT. 7043.58
M200 and curing complete including the cost of form
work but excluding the cost of reinforcement of
reinforced concrete work in Chajja. Upto First Floor
21 Providing and fixing TMT bars Fe-500D steel 21185.15 Kg . 76.23
reinforcement for R.C.C. work including binding,
bending and placing in position complete upto floor two
level ,Ground Floor , First floor , Terrace Floor All Floor
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
22 Brick work using common brunt clay building bricks 25.61 CMT. 4121.54
having crushing strength not less than 35 kg/sqcm. in
foundation and plinth in cement mortar 1:6 (1 cement :6
fine sand) etc.comp. (B) Conventional Ground floor
upto Plinth
23 Brick work using common brunt clay building bricks 40.32 CMT. 4403.39
having crushing strength not less than 35 kg/sqcm. in
superstructure above plinth level upto floor two level in
cement mortar 1:6 (1 cement :6 fine sand) etc.comp. (B)
Conventional Ground Floor
24 Brick work using common brunt clay building bricks 25.32 CMT. 4444.58
having crushing strength not less than 35 kg/sqcm. in
superstructure above plinth level upto floor two level in
cement mortar 1:6 (1 cement :6 fine sand) etc.comp. (B)
Conventional First Floor
25 (i) Half brick masonry in common brunt clay building 28.80 SMT. 614.83
bricks having crushing strength not less than
Kg/Sq.Cm. in Cement mortar 1:4 (1- Cement : 4 -coarse
sand ) in Ground Floor (B) Conventional
26 (i) Half brick masonry in common brunt clay building 13.50 SMT. 669.33
bricks having crushing strength not less than
Kg/Sq.Cm. in Cement mortar 1:4 (1- Cement : 4 -coarse
sand ) in first Floor(B) Conventional
27 Providing 15mm thick cement plaster in single coat on 198.42 SMT. 172.83
Rough (Similar)side of single or Full/half brick walls
for interior plastering upto floor two level and finished
even and smooth in (ii) Cement mortar 1:4 (1-cement :4-
sand) Ground Floor
28 Providing 15mm thick cement plaster in single coat on 108.27 SMT. 196.80
Rough (Similar)side of single or Full/half brick walls
for interior plastering and finished even and smooth in
(ii) Cement mortar 1:4 (1-cement :4-sand) First Floor
29 Providing & laying 10 mm. thick cement plaster in 232.41 SMT. 155.21
single coat on fair side of ceilings for interior plastering
upto floor two level and finishing with smooth mala
plaster.(i) Cement mortar 1:4 (1 cement : 4 sand) Ground
30 20mm thick sand faced cement plaster on walls upto 420.60 SMT. 337.52
height 10 metres above ground level consisting of
12mm thick backing coat of C.M. 1:3 (1-cement : 3-
sand) and 8mm thick finishing coat of C.M. 1:1 (1-
cement : 1-sand) etc. complete. Upto Ground Floor to
First Floor
31 Providing and laying polished Granite Slab 18mm thick 38.52 SMT. 2440.16
in Flooring,Risers of steps, Dedo, window sill, jembs
and pillars laid 20mm thick Cement Mortar 1:4 (1-
Cement : 4-Coarse Sand)and adhesive to fix and jointed
with Grey Cement Slurry including full molded round
front edges , rubbing and polishing etc. complete.
32 Providing and laying polished Granite Slab 18mm thick 49.59 SMT. 2446.22
in Risers of steps, Dedo, window sill, jembs and pillars
laid 10mm thick Cement Mortar 1:4 (1-Cement : 4-
Coarse Sand)and adhesive to fix and jointed with Grey
Cement Slurry including full molded round front edges
rubbing and polishing etc. complete
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
33 Providing and laying Virtified tiles 8 to 10 mm thick , 190.53 SMT. 1099.95
24'' x 24'' in flooring treads of steps and landing laid on
a bed of 12mm thick cement mortar 1:3 (1-cement : 3-
coarse sand ) finishing with flush pointing in white
cement.,Soluble Salt Vitrified Tiles Flooring.
34 Providing and laying Virtified tiles 8 to 10 mm thick , 6.12 SMT. 1169.98
24'' x 24'' in skrting risers of steps and dedo on 10mm
thick cement plaster 1:3 (1-cement : 3-coarse sand) and
jointed with white cement slurry,Soluble Salt Vitrified
Tiles Flooring.
35 Providing and fixing flush door both sides laminated 3.68 SMT. 3373.40
andshutter fabricated from 35 mm thick solid core
malemine faced three layered pre laminated flat pressed
wood based exterior grade bonded BWP/BWR synthetic
resin having stamped IS 12823 grade I type II including
three coats of lacquer polishing to exposed wooden
surfaces and Stainless steel decorative type designs
fixtures / fastening 2Nos. Handles, 2Nos. Aldropes,
towerbolt etc. as per architectural detailed drawing and
as directed by engineer in charge..
36 Providing and fixing window having extruded 47.22 SMT. 1713.69
aluminum Colour anodized section frame main outer
size 63.50 x 38.10 x 1.95 mm(Wt 1.094 Kg / Rmt),
horizontal two track member size 61.85 mm x 31.75 mm
x 1.20mm (wt.of 0.695 Kg/mt), vertical member of size
with sliding shutters of horizontal member size 40mm x
18mm x 1.29mm (wt.of 0.456Kg/mt), vertical member
of size 40mm x 18mm x 1.29mm (wt.of 0.456Kg/mt/
Section 8948, @ Wt. 0.457 Kg/mt) with 5 mm thick
transparent bronze colour tinted float glass with powder
coated aluminum fittings and fixtures and transparent
silicon sealant glass fixing to frame as per details etc
complete for window.
37 Providing and fixing standared extruded of alluminium 0.36 SMT. 1175.55
section of size 63mm x 38.10mm x 1.2mm (Jindal
Section :2434, @ Wt. 0.643 Kg/mt) with colour
anodized alluminium frame for ventilation with 5 mm
thick frosted glass as details etc complete for Ventilation
38 Providing and fixing M.S. grill of required pattern of 713.70 Kg. 113.12
windows etc. with M.S.. flats at required spacing and
frame alround square or round headed bolts and nuts or
by screws.including applying a priming coat of red lead
paint and two coats of oil painting etc complete
(A)Plain grill
39 Applying two coats of Birla (white cement based) or 539.10 SMT. 40.59
(acrylic lapy- putty) or equivalent & two coats of primer
of approved brand and manufacture on new wall surface
to give an even shade including thoroughly brushing the
surface free from mortar dropping and other foreign
matter and sand papered smooth.
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
40 Wall painting (two coats) with plastic emulsion paint of 539.10 SMT. 81.37
approved brand and manufacture on undecorated wall
surface to give an even shade including throughly
brushing the surface free from mortar droppings and
other foreign matter and sand papered smooth.
41 Finishing wall with weather proof exterior emulsion 420.60 SMT. 117.40
paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the surface
to remove all dirt, and remains of loose powdered
materials.etc complete
42 Applying priming coat over new steel and other metel 2.40 SMT. 125.72
surface after and including preparing the surface by
throughly cleaning, oil,grease, dirt and other foreign
matter and scoured with brushes fine steel wood,
scrapers and sand paper with ready mixed priming paint
brushing red lead. and Painting two coats (excluding
priming coat) on new steel and other metal surface with
enamel paint, brushing, interior to give an even shade
including cleaning the surface an even shade including
cleanicn the surface of all dirt, dust and other foreign
43 Steel work welded in built up sections, framed work 0.36 Quintal 9108.48
including cutting, hoisting, fixing in position and
applying a priming coat of red lead paint :-
(A) In beams and joints channels angles, column, tees,
flats with connecting plates or angle cleats as in main
and cross beams, hip and jack rafters, purlins connected
to common rafters and the like.
44 Providing and fixing in position callapsible steel shutters 7.35 SMT. 6001.94
with vertical channels 20 x 10 x 2 mm braced with flat
iron diagonals 20 x 5 mm size with top and bottom rails
of T_rin 40x 40 x 6 mm with 38mm dia, steel pulleys
complete with bolts, nuts, locking arrangements,
stoppers handles including applying a priming coat of
read lead paint.
45 Providing and fixing Stainless Steel railing having 50 96.00 KG. 435.31
mm dia hollow stainless steel pipe as hand rail and
mm dia hollow stainless steel pipe with combination of
10 cm long 16mm dia pipe as per virtical supports
mm dia hollow stainless steel pipes Height As Per
Drawing As per Consultant Drawing , Suggesion &
Instruction & EIC.
Rupees FourtyFive Lakh NinetyEight Thousand Four Hundred SeventyOne Paise FourtySeven Only
I we am / are willing to carry out the work at …................................ % above/ Below percent ( Should Be writen
in figures And words) of the estimated rate mentioned above. Amount of my / our tender works out as under.
Estimated Amount Put to tender. 45,98,471.47 Estimated Amount Put to tender.
Deduct…........ % Below Deduct…........ % Below
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
In Words In Words
(1) The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
(2) The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
(3) GST and Income tax TDS will be deducted at a source while making payments of bills
(4) In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
Signature of Bidder
Deputy Executive Engineer Divisional Accountant
Panchayat ( R&B) Sub Division Panchayat ( R&B) Division
Tapi - Vyara Tapi- Vyara
Executive Engineer
Panchayat ( R&B) Division
Tapi- Vyara
SHEDULE B Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.0 BOQ_Paniyari Library.pdf
2.0 SBD Library Paniyari.pdf
3.0 Specification Library.pdf
3.1 Building-Specification Book.pdf
Specification of Index.pdf
4.0 GROUND FLOOR PLAN LIBARAY R4.pdf
CamScanner 04-09-2025 15.03.58.pdf
Download all tender documents and submit your bid