| 1 | L1₹14.1 LAccepted-AOC HRISHYAMU KH SOUTH TRIPURA PIN 799156 | BELONIA | SOUTH TRIPURA | TRIPURA | 799156 | ₹14.1 L | L1 | Accepted-AOC Rate is favourable to the department. |
| 2 | L2₹15.1 LRejected-AOC GOMATI DISTRICT TRIPURA | ₹15.1 L | L2 | Rejected-AOC 2nd Lowest Bidder |
| 3 | L3₹17.0 LRejected-AOC | ₹17.0 L | L3 | Rejected-AOC 3rd Lowest Bidder |
| 4 | L4₹17.9 LRejected-AOC D PRIYARANJAN DATTA J SHATILLA D BELONIA BELONIA SOUTH TRIPURA | BELONIA | SOUTH TRIPURA | TRIPURA | ₹17.9 L | L4 | Rejected-AOC 4th Lowest Bidder |
| 5 | L5₹20.1 LRejected-AOC VIVEKANANDA PALLI WARD NO 02 AMARPUR GOMATI DISTRICT TRIPURA | ₹20.1 L | L5 | Rejected-AOC 5th Lowest Bidder |
Tender Value
₹24.3 L
EMD Value
₹48,531
Closing Date
22 May 2026, 3:00 pmClosed
The Executive Engineer, DWS Division Belonia
O/o the Executive Engineer, DWS Division Belonia
Repair and maintenance of 1.00 MGD SWTP at Belonia, including mtc of Chorine Dosing and Pump House, Grading of Roof the SWPT, mtc of plaster, painting and other allied works under DWS Sub-Division, Belonia during the year 2026-27.
2026_CEDWS_72752_1
05/DNIeT/EE/DWS/BLN/2026-27
Open Tender
Civil Works - Water Works
120 days
Belonia
Please refer bid documents
5 documents required · 5 mandatory
₹1,000
₹48,531
1 Jul 2026
12 May 2026
22 May 2026
12 May 2026
22 May 2026
12 May 2026
12 May 2026 - 22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1New work for Chlorine House | |||||
| 1.01 | Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of work
By manual means | - | Cum | 231.6 | - |
| 1.02 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
All kind of soil | - | Cum | 161.3 | - |
| 1.03 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | Cum | 1,177.3 | - |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:
i. 1:4:8 ( 1 Cement: 4 fine sand : 8 graded stone aggregate 40 mm nominal size) | - | Sqm | 9,960.7 | - |
| 1.05 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement-
i) 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone
aggregate 20 mm nominal size) | 1 | Cum | 13,305.8 | ₹13,292.49 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement.
All work upto plinth level:
i. 1 : 1.5 : 3 ( 1 cement : 1.5 fine sand : 3 graded stone aggregate of 20 mm nominal size) | - | Cum | 12,073.8 | - |
| 1.07 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-
i. 1 : 1.5 : 3 ( 1 cement : 1.5 fine sand : 3 graded stone aggregate of 20 mm nominal size) | - | Cum | 13,584.5 | - |
| 1.08 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level. i) Thermo-Mechanically Treated bars/Cold twisted deformed steel bars | - | Kg | 103.9 | - |
| 1.09 | Providing and laying cement concrete 1:2:4 (1 cement: 2 fine sand : 4 graded well burnt brick aggregate) flooring finished with a floating coat of neat cement including cement slurry, rounding of edges and strips and cost of glass strips etc. all complete as per direction of Engineerin- charge.
i. 40 mm thick | - | Sqm | 614.3 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74036.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_74036.xls
BOQ • 0.37 MB
DNIT05.pdf
Tender Documents • 9.26 MB
Download all tender documents and submit your bid