Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.2 LAdmitted-Finance | -12.90% | ₹18.2 L | L1 | Admitted-Finance |
| 2 | L2₹18.6 LAdmitted-Finance | -11.02% | ₹18.6 L | L2 | Admitted-Finance |
| 3 | L3₹20.1 LAdmitted-Finance | -3.60% | ₹20.1 L | L3 | Admitted-Finance |
| 4 | L4₹20.8 LAdmitted-Finance | -0.50% | ₹20.8 L | L4 | Admitted-Finance |
| 5 | L5₹20.8 LAdmitted-Finance | -0.25% | ₹20.8 L | L5 | Admitted-Finance |
Tender Value
₹20.9 L
EMD Value
₹42,000
Closing Date
10 Apr 2026, 3:00 pmClosed
E.E, MINOR IRRIGATION DIVISION CHAIBASA
E.E, MINOR IRRIGATION DIVISION CHAIBASA
CONSTRUCTION OF DRAIN BEHIND SATSANG BIHAR NEW COLONY TUNGRI. BLOCK - SADAR CHAIBASA DISTRICT - WEST SINGHBHUM, JHARKHAND
2026_WRD_112235_1
MID/CHAIBASA/F2-17/2025-26
Open Tender
Civil Works
90 days
SADAR CHAIBASA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹42,000
Yes
13 Jun 2026
4 Apr 2026
11 Apr 2026
4 Apr 2026
10 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50M including all lift leveling ramming the foundation trenches, removing roots of trees shrubs all complete as per approved design, building specification and direction of E/I. (5.1.1 BCD) | 1 | M3 | 151.82 | ₹151.67 | - |
| 2 | Providing clean coarse sand filling in foundation trenches including ramming, watering, royalty and all other taxes complete job as per specification and direction of E/I . (7.1.37 WRD PART B) | - | M3 | 584.42 | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (5.3.1.2 BCD PART B) | - | M3 | 4,598.23 | - | - |
| 4 | Providing and laying in position specified grade of reinforced cement concret of excluding the cost of centring, shuttering and finishing and reinforcement - All work upto plinth level :-(1:1.5:3(1cement :1.5coarse sand (zone-III):3 graded stone aggregate 20mm nominal size) (5.3.9.1 BCD) | - | M3 | - | - | - |
| 5 | Centring and shuttering including strutting ,proping etc and removal of form for foundation ,footing ,bases of columns ,etc for mass concrete. (5.3.17.1 BCD) | 1 | M2 | - | - | - |
| 6 | Filling in foundation trenches or in plinth in layer not exceeding 150 mm thick, well watered rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50m and lift of 1.5m all completed as per direction of E/I(mode of measurement compacted volume). (5.1.8 BCD) | 1 | M3 | 128.88 | ₹128.75 | - |
| 7 | Providing TOR Steel Reinforcement as per approved design and drawing with cutting, bending , binding with annealed wire with cost of wire removal of rust, placing the rods in position (Including carriage of bars to site) all complete as per building specification and direction of E/I. (5.5.5a BCD) | 1 | MT | 82,096.54 | ₹82,088.33 | - |
| 8 | U PVC pipe of 75 mm diameter. (M-1265 BCD P.No-74) | - | Meter | 80.47 | - | - |
| 9 | Carriage of materials (i)Cement | - | MT | - | - | - |
| 10 | (ii) Sand | - | M3 | 312.76 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_151623.xls
BOQ • 0.29 MB
special-conditions.pdf
Additional Documents • 0.29 MB
TENDER-DOC-17-1.pdf
Tender Documents • 1.84 MB
Download all tender documents and submit your bid