Loading…
Loading…
Tender Value
₹17.8 L
EMD Value
₹18,000
Closing Date
12 Jun 2026, 6:00 pm7d left
Executive Engineer Panchayat Irrigation Division, Mehsana
CONSTRUCTION OF RAINWATER HARVESTING STRUCTURE IN UNJHA TALUKA DIFFERENT VILLAGES AMUDH, TUNDAV, VISHOL, KARALI, KARANPUR, HAJIPUR DIST. MEHSANA(Ayojan M.P.Fund)(Re TRy)
308735
0 1 of 2026-2027
Open
Miscellaneous Works
Mehsana
10 documents required · 9 mandatory · 1 optional
₹900
Executive Engineer Panchayat Irrigation Division, Mehsana
₹18,000
29 May 2026
29 May 2026
29 May 2026
12 Jun 2026
29 May 2026
Name Of Work: CONSTRUCTION OF RAINWATER HARVESTING STRUCTURE IN UNJHA TALUKA DIFFERENT
VILLAGES AMUDH, TUNDAV, VISHOL, KARALI, KARANPUR, HAJIPUR DIST. MEHSANA
Qty Estimated Rate (Weightage
estimated rates)
Item according to the
but may be Item of work Unit
more or In figure In words quantities
Item No-1 Rupees Five
Drilling of pilot bore hole in alluvial strata by direct Hundred Sixty
1 786.00 563.00 Three and Zero Rmt.
rotary rig / reverse rotary rig 300mm dia (for
Mehsana upto 300 mt) Paisa Only
Item No-2 Rupees Four
Reaming of pilot bore hole in alluvial strata by direct Hundred Seventy
2 786.00 478.00 Eight and Zero Rmt.
rotary rig / reverse rotary rig 600mm dia (for
Mehsana upto 300 mt) Paisa Only
Item No-3 Rupees Twelve
Electrologging charges (With Carting ) (a) fow Own Thousands and
3 6.00 12,000.00 Zero Paisa Only Job
Deptt. Works: For Mehsana District
Item No- 4 Rupees Four
Supply and fixing of 300 mm dia RCC plaine pipes Hundred Five and
4 534.00 405.76 Seventy SIx Paisa Rmt.
used in drilling of RCC tubewell
Item No- 5 Rupees Four
Supply and fixing of 300 mm dia RCC slotted Hundred Eighty and
5 252.00 480.95 Ninety Five Paisa Rmt.
(strainer) pipes used in drilling of RCC tubewell
Item No-6 Rupees Two
Gravel packing GWSSB Mechenical SOR 2022-23 Thousands Twenty
6 60.18 2,029.00 nine and Zero
Item No-7 Rupees Seven
Clay packing GWSSB Mechenical SOR 2022-23 Hundred Fifty one
7 9.54 751.00 and Zero Paisa Cmt.
Item No-8 Rupees One
Lowering and removing of 100 mm dropline and 32 Hundred Fourty Six
mm dia airline for development of each water and Zero Paisa
bearing zone come across upto full depth of Only
tubewell of size of 300 mm dia. for tubewell having
depth upto 186 meter through suitable air
compressor. the job is for complete period of
development of tubewell. (Without charges for air
Item No-9 Rupees Three
Compressor Test of tube well by air compressor of Thousands Eight
9 24.00 600 CFM/150 PSI capacity in all districts. 3,893.00 Hundred Ninety Hour
Item No-10 Rupees Ninety SIx
10 408.00 MS Special (For Bottom plate, Clamps, Bolts etc.) 96.00 and Zero Paisa Kg.
Up to 300 mm. dia. Only
Item No-11. Rupees Eighty Nine
Excavation in all sorts of strata and formations and Zero Paisa
including depositing the unuseful excavated stuff as Only
and where directed including sorting and stacking
useful materials as required and upto lead of 200mt.
And all lifts etc. complete, including dewatering. (a)
Overburden including hard murrum.
Item No-12 Rupees Three
Providing and laying foundation concrete of Thousands Four
proportion as under by using cement, sand and Hundred twenty
machine crushed course aggregate laid in situ four and Thirty
12 5.16 3,424.30 Paisa Only Cmt
including necessary temping, smooth finishing,
watering and curing as directed with all leads and
lifts etc complete. (a) PCC 1:3:6
Item No-13 Rupees Four
Providing and laying CC 1:2:4 grade using cement, Thousands Eight
sand & crushed metal incuding providing & erecting Hundred Seventy
13 21.84 necessary form work, centering, vibrating, smooth 4,873.40 three and Fourty Cmt
finishing, watering & curing as directed with all leads Paisa Only
& lifts etc. complete. (A)sub structure .
Item No-14 Rupees Seven
Providing layer of Crushed Metal (40 to 63 mm) Hundred twenty
14 19.62 with all lead and lift in required thickeness. 728.35 Eight and Thirty five Cmt.
Item No-15 Rupees Eight
Providing layer of Crushed Metal (20 mm) with all Hundred Sixteen
lead and lift in required thickeness. and Fifty five Paisa
(Basic Rate of Material as per Rate Analysis-2)
Item No-16 Rupees Seven
Providing layer of Crushed Metal (10 mm) with all Hundred Eighty
16 19.62 789.45 nine and Fourty five Cmt.
lead and lift in required thickeness
Item No-17 Rupees Three
Providind and fixing number plate of Marble plate Hundred Three and
17 6.00 stone of required size set in C.M. 1:4 including 303.11 Eleven Paisa Only No.
finishing and engraving letters etc. completes
In Word:- Rupees Seventeen Lacs Seventy Nine Thousands Two Hundred Four and Six Paisa Only
I / We am / are willing to carryout the work at_______ %(___________________________) above / below ( Percentage should be written in
figures and words) of the estrimated rates mentioned above. Amount of my / our tnder works out as under:-
Estimated amount Estimated amount
Put to tender:- Rs_______________________ Put to tender:- Rs___________________
(1) All work shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed
(2) All the columns of Schedule should be filled in ink and the total of the entries in the last columnshould be struck by the contractor under his
(3) Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all
conditions, site, moisture, weather etc.
(4) To be continued on additiional sheets, if found necessary
Executive Engineer
Signature of the Panchayat Irrigation Division
contractor : D.P. Mehsana
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD MP Fund Works Unjha.pdf
Schedule B MP Fund works Unjha.pdf
nivida 01 2026-27.pdf
Cement Consumption MP Fund Works Unjha.pdf
Required Document.pdf
Download all tender documents and submit your bid