Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 CrAccepted-AOC LAMTIBAHAL BRAJRAJNAGAR JHARSUGUDA 768216 | JHARSUGUDA | ODISHA | 768216 | ₹10.0 Cr | L1 | Accepted-AOC Awarded bieng the L1 bidder. |
| 2 | L2₹10.2 CrRejected-Finance | ₹10.2 Cr | L2 | Rejected-Finance Rejected not being the L1 bidder. |
| 3 | L3₹10.4 CrRejected-Finance AT P O P S BELPAHAR DIST JHARSUGUDA | BELPAHAR | JHARSUGUDA | ODISHA | ₹10.4 Cr | L3 | Rejected-Finance Rejected not being the L1 bidder. |
| 4 | L4₹11.0 CrRejected-Finance | ₹11.0 Cr | L4 | Rejected-Finance Rejected not being the L1 bidder. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected by the Tender Committee |
| Sl No | Description | Qty | Unit | AADITYA CONSTRUCTION L2 | RAJ KISHOR SINGH L1 | SG SKA JV L4 | Shree Balaji Engicons Limited L3 |
|---|---|---|---|---|---|---|---|
| 1.01 | Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.) | 23,614.6 | cum | 50 ₹11.8 L | 30 ₹7.1 L | 50 ₹11.8 L | 50 ₹11.8 L |
| 2.01 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 ) | 12,987.25 | cum | 100 ₹13.0 L | 100 ₹13.0 L | 120 ₹15.6 L | 100 ₹13.0 L |
| 3.01 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- I Material | 5,313.68 | cum | 1,200 ₹63.8 L | 1,190 ₹63.2 L | 1,450 ₹77.0 L | 1,000 ₹53.1 L |
| 4.01 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- III Material | 5,313.68 | cum | 1,200 ₹63.8 L | 1,190 ₹63.2 L | 1,400 ₹74.4 L | 1,050 ₹55.8 L |
| 5.01 | Dry Lean Cement Concrete Sub- base
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601 of specifications complete in all respect. | 4,031.18 | cum | 2,100 ₹84.7 L | 2,000 ₹80.6 L | 2,400 ₹96.7 L | 2,400 ₹96.7 L |
| 6.01 | Cement Concrete Pavement
Construction of un-reinforced, dowel jointed, plain cement concrete pavement (minimum flexural strength - 4.5 Mpa) over a prepared sub base with cement @ 400 kg per cum (minimum), coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a batching and mixing plant as per approved mix design,transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved,curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc. | 9,406.07 | cum | 4,560 ₹4.3 Cr | 4,300 ₹4.0 Cr | 4,300 ₹4.0 Cr | 4,300 ₹4.0 Cr |
| 7.01 | Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification and as per relevant clause of section 1600 | 92.75 | tonne | 40,000 ₹37.1 L | 32,500 ₹30.1 L | 50,000 ₹46.4 L | 45,000 ₹41.7 L |
| 8.01 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications and as per relevant clause of section 1600 | 9.21 | tonne | 45,000 ₹4.1 L | 40,000 ₹3.7 L | 50,000 ₹4.6 L | 60,000 ₹5.5 L |
| 9.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 6,308.64 | cum | 100 ₹6.3 L | 120 ₹7.6 L | 136 ₹8.6 L | 100 ₹6.3 L |
| 10.01 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 302.7 | cum | 500 ₹1.5 L | 600 ₹1.8 L | 550 ₹1.7 L | 750 ₹2.3 L |
Tender Value
₹16.3 Cr
EMD Value
₹20.4 L
Closing Date
22 Jul 2025, 5:00 pmClosed
Shri Kaushal Kumar
MCL.Jagriti Vihar. Burla. Dist.-Sambalpur. PIN-768020. Odisha. Contact No.9438879957. 0663-2542779
Construction of PQC road along with drain and concrete pavement at Kulda OCP of Basundhara Area
2025_MCL_337482_1
MCL/Samb/Civil-TC/e-Tender /25-26/05 Dated 04.07.2025
Open Tender
Civil Works - Roads
2065 days
Kulda OCP under Basundhara Area, MCL
As per tender documents
5 documents required · 5 mandatory
₹20.4 L
20 Feb 2026
4 Jul 2025
24 Jul 2025
4 Jul 2025
22 Jul 2025
5 Jul 2025
4 Jul 2025 - 15 Jul 2025
Amount
Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.)
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 )
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- I Material
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- III Material
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601 of specifications complete in all respect.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement (minimum flexural strength - 4.5 Mpa) over a prepared sub base with cement @ 400 kg per cum (minimum), coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a batching and mixing plant as per approved mix design,transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved,curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc.
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification and as per relevant clause of section 1600
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications and as per relevant clause of section 1600
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC/PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical specifications
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Preparation and consolidation of subgrade with road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with power roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth upto 50 metres.
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density in accordance to Table No. 400-12, 400-13 and as per clause of section 406 of specifications
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
AADITYA CONSTRUCTION (BID ID -1167381)
Shree Balaji Engicons Limited (BID ID -1166449)
SG SKA JV (BID ID -1169764)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ_349884.xls
BOQ • 0.34 MB
174851450.pdf
Tender Documents • 2.27 MB
174851451.pdf
Tender Documents • 1.30 MB
174851457.html
Tender Documents • 0.06 MB
Download all tender documents and submit your bid