Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹53.1 LAccepted-AOC A 04 ADGNJ CHANDAN NAGAR OPP IOCL PETROL PUMP RAMPUR ROAD BAREILLY U P 243001 | BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | L-1 | Accepted-AOC Being the lowest bidder | |
| 2 | L-2₹62.0 L+₹8.9 L (16.8%)Rejected-AOC | L-2 | Rejected-AOC Being other than the lowest bidder | |
| 3 | L-3₹72.6 L+₹19.6 L (36.9%)Rejected-AOC 72 USMAN ENCAVE SECTOR O ALIGANJ LUCKNOW 226004 UP | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226004 | L-3 | Rejected-AOC Being other than the lowest bidder | |
| 4 | L-4₹76.7 L+₹23.6 L (44.5%)Rejected-AOC 303 GHS 888 SECTOR 20 PANCHKULA 134116 HARYANA | PANCHKULA | PANCHKULA | HARYANA | 134116 | L-4 | Rejected-AOC Being other than the lowest bidder | |
| 5 | L-5₹79.3 L+₹26.3 L (49.5%)Rejected-AOC NO 9 BYRAVESHWARA INDUSTRIAL ESTATE ANDRAHALLI MAIN ROAD NEAR PEENYA 2ND STAGE BENGALURU 560 091 | BENGALURU URBAN | KARNATAKA | 560091 | L-5 | Rejected-AOC Being other than the lowest bidder |
Tender Value
₹88 L
EMD Value
₹1.6 L
Closing Date
3 Nov 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Commander Works Engineer, MES, Bareilly
HEADQUARTERS, COMMANDER WORKS ENGINEER, MILITARY ENGINEER SERVICES, STATION ROAD, BAREILLY CANTT, PIN 243001
CA NO.CWE BLY/GE (E)/ 34 OF 2020-21 SPECIAL REPAIRS TO REPLACEMENT OF BER HT OCBS AND TRANSFORMER UNDER GE (WEST) BAREILLY
2020_MES_361659_3
8200/B/631/E8
Open Tender
Electrical and Maintenance Works
Item Rate
240 days
BAREILLY
For enlisted contractor Class C Category b ii and for unenlisted contractor meeting the eligibility criteria of class C and category b ii
6 documents required · 6 mandatory
₹1,000
GE East Bareilly
₹1.6 L
Yes
5 Dec 2020
13 Oct 2020
9 Nov 2020
13 Oct 2020
3 Nov 2020
20 Oct 2020
13 Oct 2020 - 27 Oct 2020
60 days
Amount
Supply, installing, testing and commissioning AC 3 phase 50 Hz, 315 KVA capacity transformer copper wound step down ,outdoor type 11000/433 Volts (at on no load) double wound, oil immersed, naturally cooled with external cooling tubes, core type delta connected on primary side (HV) and star connected on secondary side (LV) in accordance with vector symble Dy-II (vector group) with Neutral brought out on secondary side (LV side) and having tapings at + 2.5% & + 5.0% and +7.5% to be changed by means of hand operated off load tap changer gear. The maximum temperature rise should not exceed 45 degree centigrade in oil and 55 degree centigrade in HV/LV winding when measured by resistance method after continuous full load run in ambient temp of 40 degree centigrade and the transformer shall be IS-1180 (Part-I) (Level-III) including suitable platform to mount the transformer as per manufacturer's instructions or ammended time to time and shall comprise of the following standard fittings:-
(a) Three Nos porcelain bushing with arching horn on HV side suitable for 11 KV complete with bushing copper rods, nuts and washers. (b) One cable box on HT side (Primary side) consisting of three Nos porcelain with copper bushing rods, complete with nuts and washers, with one No cable glands suitable for reception / connection of HT cable 11000 volts grade PVC sheathed and XLPE insulated, heavy duty, armoured cables including gland joint and jointing materials complete and One cable box on LT side (Secondary side) consisting of four Nos porcelain with copper bushing rods, complete with nuts and washers, with one No cable glands suitable for reception / taking out 01 Nos 3.5 core 625/630 Sqmm LT 1100volts grade PVC sheathed and XLPE insulated, heavy duty, armoured cables including gland joint and jointing materials complete.
(c) Oil conservator with filter type drain valve and oil level gauge. (d) De-hydrating breather with first fill of dehydrating agent (silica gel). (e) Explosive vent. (f) Thermometer pocket on tank cover. (g) One No 100 mm dia, dial type thermometer, vapour pressure type, having range 0-120 degree Celsius with metal guard having maximum temperature indicator with resisting device for transformer. (h) Two earthing terminals on tank cover to facilitate fixing of 50 x 6 mm GI earth strip. (j) Rating plate and terminal marking plate. (k) Oil level gauge. (l) Oil drain filter valve. (m) Lifting lungs
(n) Oil filling hole with cap/plug with connection plate complete. (o) Air relief valve plug (p) Four plain solid cast steel detachable rolers. (q) Extra bushing for neutral outside the cable box for providing independent set of earthing for neutral. (r) First fill of fresh transformer oil conforming to relevant is tested & above 60KV dielectric strength at 2.5 mm air gap as per IS: 335 for insulating oil for transformer and switch gear
Supply install commissioning and testing , HT 11 KV, 3 phase 50 Hz 250 MVA 13.1 KA for 06 Nos out going VCBs & 350 MVA 18.37 KA for 04 Nos incoming VCBs and 01 No. Bus coupler, each single panel switch board, vertical/ horizontal isolation and horizontal draw out type vacuum circuit braker (VCB) confirming to IS-13118, EIC 56 totally enclosed, single copper bus bar floor mounting metal clad indoor extendible, fully interlock vertical isolation and horizontal draw out type indoor circuit breaker suitable for installation in 11 KV 3 phase 3 wire supply system. The each VCB shall consist the following:- FIXED PORTION (a) Floor mounting jig set fabricated steel cubical complete with supports for the gear, earthing connections, final wiring and labels. (b) Integral earthing feature built-in for bus bar and circuit earthing. (c ) Three phase epoxy resin/encapsulated isolating spout assemblies complete with isolating contacts and pair of automatic safety shutter which may be individually locked in the closed position for earthing/ maintenance purpose. (d) Three Nos , epoxy cast WPL current transformer with 50/25/5+5, 30 VA burden and CL 1 and CL 5P10 accuracy for metering & protection respectively for 06 Nos VCB outgoing.
(e) Three Nos , epoxy cast WPL current transformer with 100/50/5+5, 30 VA burden and CL 1 and CL 5P10 accuracy for metering & protection respectively for 02 Nos VCB incomimg. (f) Three Nos , epoxy cast WPL current transformer with 50/25/5+5, 30 VA burden and CL 1 and CL 5P10 accuracy for metering & protection respectively for 02 Nos VCB incoming. (g ) One No. Bus Coupler with interlocking.
(h) One Nos three phase 3 limb PT 11 KV/110V with 100 VA Burden per phase class B class1.0 accuracy for metering & protection respectively for 04 Nos VCB incoming. (j) Rear cable box suitable for termination of cables. (k) Multicore cable termination block. (l) Heater with switch and thermostat. (m) Door type instrument panel extension chamber.
RELAYS (A) One No. 3 O/C+ 1 E/F Relay RS 485port compatible for SCADA opertion in each VCB panel excluding Bus Coupler.
REMOVABLE PORTION (Breaker) (a) 400A 13.1 KA, 06 Nos VCB outgoing with hand charge mechanism and electrical closing. The breaker is mounted on a truck carriage complete with self contained fully interlocked raising and lowering mechanism. The carriage is fitted with: (i) Mechanical On/OFF indicator with hand trip device (ii) Shunt Trip Coil (110VDC) (iii) Shunt release Coil(110VDC) (iv) Mechanical operation counter (v) Spring charge motor-220 VAC (b) 400A 13.1 KA, 02 Nos VCB incoming & 630A 18.37 KA 02 Nos VCB incoming with hand charge mechanism and electrical closing. The breaker is mounted on a truck carriage complete with self contained fully interlocked raising and lowering mechanism. The carriage is fitted with: (i) Mechanical On/OFF indicator with hand trip device. (ii) Shunt Trip Coil (110VDC) (iii) Shunt release Coil(110VDC) (iv) Mechanical operation counter (v) Spring charge motor-220 VAC (c) 630A 18.37 KA, VCB Bus Coupler 01 No. including 11 KV Bus duct with 3 phase copper bus bar 800 Amp capacity as required at site including 11KV phase barriers with hand charge mechanism and electrical closing. The breaker is mounted on a truck carriage complete with self contained fully interlocked raising and lowering mechanism. The carriage is fitted with: (i) Mechanical On/OFF indicator with hand trip device (ii) Shunt Trip Coil (110VDC) (iii) Shunt release Coil(110VDC) (iv) Mechanical operation counter (v) Spring charge motor-220 VAC
S&F Battery bank Float cum Booster battery charger (FCBC) suitable for 11 kv HT panel with 110 Volt and 55 Nos 2 volt each of 100Ahs lead acid battery Battery with Charger 25Amp complete all as specified and directed.
M&L for earthing complete with galvanized steel plate electrode 60cm x 60cm x 6 mm thick buried directly in ground earth pit not less than 2.25 meter deep below normal ground level with top edge of the plate not less than 1.5m below normal ground level connected to galvanized earth lead GI strip 32x6mm dia by means of bolts, nuts, check nuts and washer of galvanized iron or steel all as shown in electrical plate No 3 of SSR Part-I connected to continuous earth wire/lead all as specified and testing on completion complete all as specified and directed.
M&L for maintenance free Chemical earthing system as per IS Code 3043 ;2018 IEEE-80,IEC62561-2 using ISOGEL with copper bonded rod 10 feet length, 17.2mm dia (min copper bonding shall be 250 micron) UL listed and is CPRI tested for 25 KA fault current along with exothermic weld busbar of copper 25x6x200 mm with copper bonded rod. And earth enhancement material with resistivity of less than 0.14 Ohms the earth pit chamber cover shall be made of plastic material and presence of Engineer In Charge. Necessary test certificate, Standard earth resistance value and 2 Year of Guarantee shall be provided complete all as specified and directed.
M&L for earth continuity conductor or main earthing lead 32x 6 mm copper strip from earth plate to earthed point of equipments complete including fixing as directed at site and complete all as specified and directed.
Dismantling of old unserviceable Transformer from foundation with disconnection of all HT & LT Connection and Shifting to MES Store complete all as specified and directed.
Dismantling of old unserviceable OCBs & VCBs from foundation with disconnection of all HT connection and Shifting as under:- (a) Shifting of 10 Nos OCBs to MES store yard complete all as specified and directed. (b) Shifting of 05 Nos VCBs, 04 Nos OCBs & 01 No. OCB Bus Coupler to other 11 KV sub station, reinstallation & refixing connection inlet & outlet cabling through cable lugs testing and commissioning complete all as specified and directed.
M&L for cable jointing kit for 11 KV (Earthed) grade cable for indoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 95 sqmm complete all as specified and directed.
Note : Tenderers may note that amount of credit Rs 5200.00 will be deducted from the total amount arrived, at the time of Acceptance of contract.
JAZZCON ENGINEERS PVT LTD
Unnati Engineers
R D Bansal
Vijay Electricals
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .