Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹59.9 L
EMD Value
₹2 L
Closing Date
7 Mar 2024, 5:30 pmClosed
EE NH Divn Kalaburagi
O/o EE NH Divn Kalaburagi
Consultancy Services for the preparation of Tender documents land plan survey including Marking of centre line and fixing of ROW stones for Widening of road from two lane to four lane from Km 0.000 to Km 15.870 Near Miriyan Telangana Karnataka Bord
2024_MoRTH_798228_2
EE/NHD/KLB/AE-1/2023-24/1585
Open Tender
Consultancy
Item Rate
Chincholi
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
Yes
PAO NH Bangalore
₹2 L
24 May 2024
1 Mar 2024
8 Mar 2024
1 Mar 2024
7 Mar 2024
1 Mar 2024
Amount
Reconnaisance Survey including study of sheets, maps etc. for alignment including 3 dimension of apexes, fixing pegs, chain and compass or cross staff with L-section and cross section of alignment at every 30m or at every chainge of deviation which ever is less including fly levels at closing of day, fixing apex and B.M stone os sixe 0.20*0.20*0.75 m in 1:2:4 C.C at every 200m and prepration odf alignment plans and all tyoes of compliance if required from department. etc., complete., As directed by Engineer incharge of the work.
Demarcation of right of way (ROW) as per design using total station including calculation of co-ordinates of 30m interval on both sides of road etc., complete. As directed by Engineer incharge of the work.
Preparation of Land Acquisition proposal including collection of 7/12 and 8/A documents marking alignment on village maps , area calculation, preparation of proposal, printing,bindind, etc. complete and submission of 5 sets more ever liasoning and coordination with revenue authorities with compliance if any until finalisation of award including Joint measurement of the alignment. (For New alignment) etc., complete. As directed by Engineer incharge of the work.
Carrying of detailed topographic survey by using total station along the existing or new road including taking L-section and cross section at every 30m ROW, taking atleaset 10 spot levels per cross section, picking up all existing details inside the ROW like electric telephone line, encroachments, structures etc. connecting all primary total station control points by G.I.S bench mark levels or which ever available with department using auto level and preparing Auto CAD plan by using above data taking out 1 set of black and white printout on 50 micron polyster film sheet A2 size and 2 sets of coloured printout on A2 size submitting soft copy all data on CD.(Plain Terrain New Alignment) etc., complete. As directed by Engineer incharge of the work.
Demarcation of Road boundry (ROW) including fixing the boundry stones of standard size and shape including fixing in block of standard size of C.C. of 1:4:8 white washing at 30 M interval on both sides etc., complete. As directed by Engineer incharge of the work.
Transfering and taking out design on Coordinates of baseline on ground using nails for existing road surfaces and survey pegs for new alignment including taking out coordiates for horizontal curves at required interval of 50m etc. complete (extra line such as right of way median edges to toe line4 not included) etc., complete. As directed by Engineer incharge of the work.
Providing of Jeep/Vehicle for conveying survey material, Engineers, Labours etc., complete. As directed by Engineer incharge of the work.
Scanning, digitisation & Geo-referencing of Cadastral/revenus maps and interpretation of all existing features like building, water boides, rivers, agricultural fields etc to generate map. Creation of G/S platform by using ortho redified images and revenue date by linking of textual date etc., complete. As directed by Engineer incharge of the work.
Land Plan Survey with Drone fitted LiDAR Technology (Approved as per Letter No. PWD:104:AWP:2023- 24:254:DATED 12-07-2023). Carrying of detailed topographic land plan survey by using DGCA Type Certified drone, fitted with advanced LiDAR with inbuilt IMU, RGB and precision GNSS Technology with RTK Technology & real time fleet tracking technology in web-app along the existing or new roads for conducting ROW Survey etc., complete. As directed by Engineer incharge of the work.
Completion of award declaration (3G) for 90% of land parcels identified under 3 (D) etc., complete. As directed by Engineer incharge of the work.
Receipt of land possession certificates (3E) for 90% of all land parcels identified and submission of Land Possession report etc., complete. As directed by Engineer incharge of the work.
Prepration of Tender Docs, Agreement, RFP and Technical Schedules etc. and getting approved by the Authority etc., complete. As directed by Engineer incharge of the work.
NINETECH INFRA SOLUTIONS PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .