Tender Value
₹5.3 Cr
EMD Value
₹5.3 L
Closing Date
12 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Gir Somnath Irrigation Division, Veraval Ishvar Complex, 3rd Floor, A-Wing, Opp. Reliance Mall, Veraval-Junagadh Road, Veraval-362265
Construction Of Two New Checkdam At Village Kalapan And Zankharvada Taluka Una In Gir Somnath District.
360511
Tender Notice No-23 2026-27
Open
Civil - All
Works
Gir Somnath
10 documents required · 10 mandatory
₹12,000
Executive Engineer, Gir Somnath Irrigation Division,Veraval
₹5.3 L
28 Oct 2026
28 Oct 2026
28 Oct 2026
12 Nov 2026
28 Oct 2026
120 days
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to
Bidder, Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be
the actual quantities of work ordered and carried out, as measured by the
Contractor and verified by the Engineer and valued at the rates and prices
tendered in the priced Bill of Quantities, where applicable, and otherwise at
such rates and prices as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is other wise provided under the Contract, include all construction al
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set
out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities,
whether quantities are stated or not. The cost of Items against which
Contractor has failed to enter a rate or price shall be deemed to be covered by
other rates and prices entered in the Bill of Quantities (in case of Item rate
6. The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the priced Bill of Quantities, and where no
Items are provided the cost shall be deemed to be distributed among the rates
and prices entered for the related items of Work.
7. General direction and descriptions of work and material sare not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each it emin the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for this work. For building works specifications for building are to
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Item Of excavation in Hard rock is to be operated as per tender item and hard rock
received shall be issued to contractor at the SOR rate Rs.224.08 per cum as per
operated quantity. The Royalty if any shall be paid by contractor on such quantity of
hard rock to relevant department the stuff of hard rock irrespective of void or
quarry spalls shall be taken by contractor. The excavated hard rock fully on UCR to
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Description of Item (with brief CD-1 CD-2 Total Rate
specification and reference to book of Quantities Quantities Quantities Unit (Without
No. (Without GST)
specifications) (Kalapan) (Zankharvada) GST)
1 Care and diversion of River including 25000000.000 25000000.00 50000000.00 Job 0.01
dewatering during construction of
checkdam and allied works as prescribed
and directed etc. completed.
2 Jungle clearance (Ganda Baval etc) of 17600.000 14700.00 32300.00 Sqm 5.00
Light/heavy dence (work done by manually
or by machinery ) including grabbing of &
removing the roots & girth completely from
the ground & back fill with earth & making
surface good as directed including
depositing & removing the material away
from the site of work at own risk and cost
as and where directed etc completed for
following. (b) Heavy density
3 Excavation in all sort of strata and 8340.00 9670.00 18010.00 Cum 79.00
formations incl. depositing the unuseful
excavated stuff as and where directed incl
sorting and stacking useful materials as
directed upto 200 mt lead and all lift etc.
complete incl. dewatering.(A) IN
OVERBURDEN INCL. HARD MURRUM.
4 Providing & laying in position non cohesive 439.00 408.00 847.00 Cum 145.00
layers of locally available material
(Selected Soil) inclusive of required
finishing & light compaction with all lead &
5 Providing and laying compacted rubble 436.00 405.00 841.00 Cum 1471.10
soiling as directed with all leads and lifts
6 Constructing RCC diaphragm wall
cmthick special tools equipments and
method of execution with concrete of M-20
class consisting of following items and
components of work with all leads and lifts
(A) Constructing 30cm thick R.C.C.M-10
cast in citu or pre cast PRE TRENCH for
providing platform as per drawing etc
complete with excavation in all sort of
strata and backfilling required and
maintaining it upto completion of work for
constructing .R.C.C. Diaphragm wall on
(B) Boring with special equipments for the
concrete diaphragm wall of 60cm
thickness through all sorts of soils
including overburden, hard murrum and
soft rock upto required depth and all lift etc
( C) Providing and placing in position
DESIGN MIX Tremmmy concrete grade
M-20 (MSA- 20mm) for 60cm thick
concrete diaphragm wall with the use of
tremmy upto required level including all lift
(D)Providing and placing in position for
reinforcement cage in 60 cm thick
concrete diaphragm including cutting,
bending,binding ,fixing in position with help
of crane etc complete with all lift. 3) TMT
7-A Prov. & Laying in position cement concrete 92.00 182.00 274.00 Cum 2946.00
using cement , sand and crushed metal
coarse aggregate by mass and machine
mix for PCC/RCC including necessary
formworks compaction by vibrator,curing
as directed with all lead & lift etc complete.
(Excluding cost of steel ) FOR .BODY
WALL, APRON, TRAINING
WALL, SIDE WALL, SPLAY WALL, KEY
WALL, CUT OF WALL ETC.(4/A)
Concrete (1:3:6) and MSA-40mm
(cement level 220 kg/cum)
7-B Prov. & Laying in position cement concrete 1290.00 1081.00 2371.00 Cum 3423.00
using cement , sand and crushed metal
coarse aggregate by mass and machine
mix for PCC/RCC including necessary
formworks compaction by vibrator,curing
as directed with all lead & lift etc complete.
(Excluding cost of steel ) FOR .BODY
WALL, APRON, TRAINING
WALL, SIDE WALL, SPLAY WALL, KEY
WALL, CUT OF WALL ETC.(4/C)
Controlled Concrete grade M-15 and
8-A Providing & Laying in position controlled 840.00 756.00 1596.00 Cum 4729.00
cement concrete using cement sand &
crushed metal aggregate by machine mix
incl. necessary formworks compaction by
mechanical vibratoer curing as directed
with all lead and lift etc complete.
Excluding the cost of steel.(ii) For ogee
crest,u/s and d/s face skin concrete E)
Concrete grade M-20 and MSA-
8-B Providing & Laying in position controlled 491.00 617.00 1108.00 Cum 4890.00
cement concrete using cement sand &
crushed metal aggregate by machine mix
incl. necessary formworks compaction by
mechanical vibratoer curing as directed
with all lead and lift etc complete.
Excluding the cost of steel.
(i) For bucket and endsill etc C) Concrete
grade M-25 and MSA-40mm(Graded)
9 Providing,cutting,bending,binding and 14.70 14.10 28.80 M.T. 76574.00
fixing in position as per drawing .TMT BAR
, reinforcement for R.C.C. works and
anchor bars incl cost of black annealed
to 18 BWG M.S.. Wire etc.complete with
all lead and lift. (B) Fe-500
10 Providing and fixing in position 100/110 16.00 35.00 51.00 Rmt 358.00
mm dia PVC Pipe weep holes in the
retaining walls/sidewall/abt etc
11 Providing and laying graded filters of 383.00 351.00 734.00 Cum 530.00
sand,gravel/metal and over size metal (
100 to 150 mm) behind the retaining wall
& wing walls as directed as per approved
drawing with all lead and lifts etc complete.
12 Providing and laying dry rubble pitching 1587.00 961.00 2548.00 Sqm 723.00
with 20 cms gravel/metal and 20 cms sand
layers as base of inverted graded filter and
without header stone but incl.hand packing
trimming & dressing of slopes etc
complete.(b) 45 cms thick stone pitching
13 Providing and laying STONE LOANCHING 2400.00 1740.00 4140.00 Cum 765.00
APRON by using 50% stone which having
weighing not less than 40 Kg or as
specified incl hand packing and filling the
interstices by spouls etc complete with all
14 Back filling with appropriate excavated 196.00 142.00 338.00 Cum 84.00
material behind the structures or refilling
the trenches with excavated useful
material including watering ramming,
consolidation etc complete with all lead
15 Providing and fixing P.V.C. water stops of 66.00 69.00 135.00 Rmt 596.00
different size as below and as per
std.drawing and specification. (a) P.V.C.
16 Providing & filling in contraction joints with 62.00 67.00 129.00 Sqm 702.00
12mm thick bitumen sheet of approved
quality as directed.
17 Providing and fixing in position white 1.00 1.00 2.00 No. 1350.00
marble plate of size 45x45x1.8 cm incl
ingraving the letters as per drawing/as
directed etc complete.
18 Providing, laying & fixing in position 217.00 196.00 413.00 CFT 2000.00
wooden needles of size 1.30 m x 0.15 x
0.075 m of locally available boat material
inclusive of required finishing, provding
Iron Stripus & Iron Rind for loading un
loading etc comp with all lead & lift.
19 Carring out plate load test on defined 2.00 2.00 4.00 Nos. 43912.00
location of foundation of Bodywall/
abutment/ wing wall for working out soil
bearing capacity with R.C.C. wall & soling
of designed thickness, including supplying
all material, equipments, labour etc.
required for working out S.B.C. as per
directed by engineer in charge etc.
20 Excavation for foundation upto 1.5 m 18.00 18.00 36.00 Cum 164.64
depth including sorting out and stacking of
useful materials and disposing off the
excavated stuff upto 50 Meter lead.(B)
Dense or Hard soil
21 Excavation for foundation upto 1.5 m 21.00 21.00 42.00 Cum 281.73
depth including sorting out and stacking of
useful materials and disposing off the
excavated stuff upto 50 Meter lead.(C)
22 Excavation for foundation upto 1.5 m 40.00 40.00 80.00 Cum 289.40
depth including sorting out and stacking of
useful materials and disposing off the
excavated stuff upto 50 Meter lead.(D)
Soft rock not requiring Blasting
23 Providing and laying cement concrete 4.05 4.05 8.10 Cum 4192.33
1:3:6 (1- Cement : 3- Coarse sand : 6-
crushed stone aggregates 20 mm nominal
size) and curing complete including cost of
formwork in (A) Wall Caps / Coping
24 Uncoursed Rubble Masonry with hard 23.76 23.76 47.52 Cum 2641.38
stone of approved quality in foundations
and plinth in Cement Mortar 1:5 (1-
cement : 5-coarse sand including levelling
up etc. complete
25 Providing and laying cement concrete 9.51 9.51 19.02 Cum 4559.65
1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal
size) and curing complete including cost of
formwork in (A) Foundation and Plinth
26 Filling available excavated earth 30.89 30.89 61.78 Cum 137.47
(excluding rock) in trenches. plinth, sides
of foundations etc. in layers not
exceeding 20 cm. in depth consolidating
each disposited layer by ramming and
27 Carring out plinth treatment to post 23.76 23.76 47.52 Sqm 62.30
construction / existing structure by
spraying chemical solution for termite
control treatment including labour and
material consistment with I.S.I
specification. Using Chlordene and
Chiorpurfiles 20 EC. As Per 6131_paret-II
Consentration Weight one percent is
recommended i.e one litre 20 EC chemical
emulsion with 19 liter give 1 %
concrentration inclusive of one litre
chemical emulsion appication at the rate of
5 Litre chemical / Sqm of surface is
recommended as per I.S
28 White Stone Bela mesonry block in course 14.58 14.58 29.16 Cum 6698.05
in superstructure with stone of approved
quality in Lime Mortar 1:5 (1-Cement :5-
course sand) including packing the joints
etc. complete. (G.F.)
29 White Stone Bela mesonry block in course 5.41 5.41 10.82 Cum 6993.19
in superstructure with stone of approved
quality in Lime Mortar 1:5 (1-Cement :5-
course sand) including packing the joints
etc. complete. (Masonry F.F.)
30 Providing and laying controlled C.C.M.200 1.51 1.51 3.02 Cum 6598.94
& curing complete including the cost of
form work but excluding the cost of
reinforcement for reinforced concrete work
in Beam upto floor two level for G.F.
31 Providing and laying controlled C.C.M.200 5.54 5.54 11.08 Cum 6196.47
& curing complete including the cost of
form work but excluding the cost of
reinforcement for reinforced concrete work
in Slabs ,landing, cantilevers for slab (GF
32 Providing and fixing FRP frame size 8.93 8.93 17.86 Sqm 2377.76
100x50 mm and 28mm thick FRP depress
panel shutter having extra reinforcement
on sides & edges in Gel coat finish. The
core of the shutter & frame is to be filed up
with injected fire retardant grade
polyurethene foam done in situ alongwith
embedded wooden pieces for stiffening &
also taking hinges & fintures. The whole
FRP frame & shutter is to be water proof
proof, termite proof & resistance to mild
acid/alkali. Rates are to be inclusive of S.S
hinges with necessary screws &
alluminium fixtures & fastenings & fastener
33 20mm thick sand faced cement plaster on 312.65 312.65 625.30 Sqm 358.72
walls upto height 10 metres above ground
level consisting of 12mm thick backing
coat of C.M. 1:3 (1-cement : 3-sand) and
8mm thick finishing coat of C.M. 1:1 (1-
cement : 1-sand) etc. complete.
34 Wall painting (three coats) with primer 98.00 98.00 196.00 Sqm 130.40
plastic emulsion paint of approved brand
and manufacture on undecorated wall
surface to give an even shade including
throughly brushing the surface free from
mortar droppings and other foreign matter
and sand papered smooth. etc. complete.
35 Finishing wall with weather proof exterior 143.00 143.00 286.00 Sqm 122.14
emulsion paint on wall surface (two coats)
to give an required shape even shade
after thoroughly brushing the surface to
remove all dirt, and remains of loose
powdered materials.etc complete
36 Providing and laying broken chine mosaic 32.00 32.00 64.00 Sqm 816.50
flooring for terrace using 12 mm to 20 mm
broken pieces of glazed tiles to be laid
over cement mortar 1:3 to plain or slope
mixed with 2% of integral water proofing
compound by weight of cement and to be
tempered to bring mortar creme out upto
surface using white cement including
rounding off junctions and extending them
upto 15 cm along the wall, clearing with
water and oxalic acid etc as directed. (Use
of waterproofing compound for 1 square
37 Providing TMT Bar FE 500D reinforcement 974.00 974.00 1948.00 Kg 77.29
for R.C.C. work including bending, binding
and placing in position complete upto floor
38 Providing and laying cement concrete 7.00 7.00 14.00 Cum 4606.87
pavement (25mm to 50mm thick) with
1:2:4 (1-cement : 2-coarse sand : 4-stone
aggregate 20mm nominal size) including
finishing with floating coat of neat cement
I/We am/are willing to carry out the work at….......................% above/below percent (Should be written in figures and words) of the estimated
rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For Above INR 50 Cr. )
Description of Item (with brief
specification and reference to book Quantity Unit Amount
of specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… By
(C)Net Tendered Amount (A-B) (in figure) ……………………………… EE
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which
no extra payment shall be made.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analys` is Standard Cement Consumption has been taken as per Govt. G.R.: No. MIS 102010/17/K1, dtd.
30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
Gir Somnath Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Two Checkdam.pdf
BOQ.pdf
Tender Notice No.23 of 2026-27.pdf
Jhakharwada Drawing.pdf
Kalapan Drawing.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .