Installation of a solar-powered water tower with deep boring at Veer Birsa Club, Chach Linepar, under Chach Panchayat.
2026_ZPDH_117802_11
25/2026-27/DE/ZPDH/DHANBAD
Open Tender
Civil Works
Percentage
90 days
EGARKUND
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,250
₹10,700
Yes
24 Aug 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
29 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Deep Boring & Installation DW&SD Cost of Drilind 200 mmx16Smmx125 mtr deep bore well in all kind of Soil and
Page rock in rural area for instalation of pump set with Hydrolic DTII Rig machine all no-130 complete including all materials, tools,driling rig, air compressure and (SI. No- equipments as well as fule, lubricants and cost of transportation of rigmachine 119) and other vehical up to Site. (a) From 0.00 M to 50.00 M below G.L. | 50 | M | 885.12 | ₹44,256 |
| 2 | (b) From 51.0 M to125.00 M | 75 | M | 924.16 | ₹69,312 |
| 3 | D.S.R. Supplying, assembling, lowering and fixing in vertical position in bore well, un-Item plasticized PVC medium well casing (CM) pipe of required dia, all complete, for No. all depths, as per direction of Engineer-in-charge. 150 mm nominal size dia. 23.3.2 | 50 | M | 579.59 | ₹28,979.5 |
| 4 | DSR Development of tube well in accordance with IS : 2800 (part I) andlS: 11189, to
23.12 establish maximum rate of usable water yield withoutsand content (beyond permissible limit), with required capacity aircompressor, running the compressor for required time till well isfully developed, measuring yield of well by "V" notch method or anyother approved method, measuring stalic level & draw down etc. bystep draw down method, collecting water samples & getting testedin approved laboratory, i/c disinfection of tubewell, all complete,including
hire & labour charges of air compressor, tools & accessoriesetc., all as per
requirement and direction of Engineer-in-charge | 1 | Hours | 794.86 | ₹794.86 |
| 5 | DSR Providing and fixing M.S. clamp of required dia to the top of casing/housing pipe
23.14.2 of tubewell as per IS : 2800 (part I) including necessary bolts & nuts of requried size complete. 200 mm clamp | 1 | Each | 1,598.04 | ₹1,598.04 |
| 6 | DSR Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,having thermal
18.8.4 stability for hot & cold Water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe withclamps at 1.00 m spacing. Ihis includes jointing of pipes & fittingswith one st µ CPVC oivent cement and testing of joints complete as per direction of Engineer in Charge. (Excluding GST)
32 mm nominal outer dia Pipes | 60 | M | 640.81 | ₹38,448.6 |
| 7 | Supplying and Fitting Solar Pumping Provision & Installation ofSolar Powered submersible Auto run & Stop DC Pump Motor (900 Wp)of stainless steel suitable for minimum 125mmx115mm bore well operating head 60.00m discharge rate minimum 2000
LPH with lowering up to 57.00m suitable dia HOPE pipe &2.5sq mm x3core flat submersible cable ofIS694:l 190 including rrionql /Poly Crysta_lline PVC array (900WP) mounted·on steel structure for storage water tank (5.00mhigh)in a suitable direction to optimize
panel uses and withstand .the wind pressure up to 200 Km
/hour &making suitable arrangements to operated Hand pump manually in the same bore when there is no solar power including 5 years warranty against defects in materials and workmanship with locking arrangement of switch board . | 1 | Each | 1,19,000 | ₹1,19,000 |
| 8 | Carrying out recuparation/ Yeild test for ascertaining the discharge-of constructed well/excavetad profile as directed by the EIC. The test carried out by the
drawing down water from the well/ profile below normal/subsoil water level upto full depth rise is recorded the normal water level/
· sub soil water level in the well/ profile as well as strainer/ level at pump as per design of W.S. Scheme shall be recorded prior to the test | 1 | Each | 1,865 | ₹1,865 |
| 9 | Polythene water storage tank of mark with.cover and sitable locking system in double layer confirming to IS :12701-1996 WITH LATEST REVISION | 2,000 | LTRS | 7.76 | ₹15,520 |
| 10 | Construction of RCC Foundation for Steel structure staging & Solar panel
(Sub Estim,_.ate No:---02) Earthworkinexcavation in foundation trenches including all lifts leveling running the foundation trenches and
removing roots of trees shrubs_all complete as pear ppro
design,building speci!ication and direction of E/1. | 11.33 | cum | 151.82 | ₹1,720.12 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.23 MB
BOQ_159247.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].