Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Finance | -46.13% | ₹7.0 L | L1 | Admitted-Finance |
| 2 | L2₹7.8 LAdmitted-Finance | -40.31% | ₹7.8 L | L2 | Admitted-Finance |
| 3 | L3₹7.8 LAdmitted-Finance | -39.87% | ₹7.8 L | L3 | Admitted-Finance |
| 4 | L4₹7.8 LAdmitted-Finance | -39.80% | ₹7.8 L | L4 | Admitted-Finance |
| 5 | L5₹8.1 LAdmitted-Finance | -37.37% | ₹8.1 L | L5 | Admitted-Finance |
Tender Value
₹13 L
EMD Value
₹26,000
Closing Date
16 Mar 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer
As BOQ
2026_RDPR_305640_19
e-NIT No- 156 REW Samba of 2026 Dated-07-03-2026
Open Tender
Civil Works
30 days
Vijaypur
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executve Engineer Rew Samba
₹26,000
28 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kind of soil, Disposal of 1 mtr from cutting edge.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
Supply & Dumping of Stone at site
Providing and laying in 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
P/Applying 12mm thick c.plaster in 1:6 c.mortar
Centering and shuttering incl. Propping and removal of same in Foundation and footings
Providing and laying 80mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge
sand average ,lead 10 km by mt
Bajri from 10 KM by MT
stone from 10 KM by MT
Add cost of Padestal with marble plate
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.35 MB
BOQ_992700.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid