Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | L1 | Accepted-AOC 1st lowest | |
| 2 | L2₹4.5 L+₹37,916.38 (9.09%)Rejected-AOC | L2 | Rejected-AOC 2nd lowest |
Tender Value
₹4.0 L
EMD Value
₹9,999
Closing Date
8 Jun 2020, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, PWD Roads Sub Division, Muvattupuzha
Patch work using emulsion and shelmac to be carried out for avoiding further development of pot holes,
2020_PWD_360489_1
ET-14/AEE/2020-21
Open Tender
Civil Works - Roads
Item Rate
90 days
various roads under Road section Muvattupuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹885
Assistant Executive Engineer, PWD Roads Sub Divisi
₹9,999
Yes
27 Aug 2020
29 May 2020
11 Jun 2020
29 May 2020
8 Jun 2020
29 May 2020
Amount
Estimate
2.3.2.A : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br>Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
od4690/2020_2021 : Engaging Excavator for removing earth including all charges
od4691/2020_2021 : Engaging Tipper for conveying earth and debris including all charges
od2214/2020_2021 : Engaging Coolies
od4007/2020_2021 : Filling up of pot hole (cut & formed to to regular shapes & defective materials removed) after supplying a prime coat of bitumen emulsion using graded metal (36mm,12mm,6mm broken stone) and compacting with power to get a compact surface
55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.3 : Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
od4692/2020_2021 : Supplying and laying quarry waist for road way formation work
10.2 : Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
N A SUBAIR
Bidder Name
RAFEEK C.H
N A SUBAIR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_508289.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .