Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 CrAccepted-AOC 1008 7 GALI DAVI WALI JAURA PIPAL AMRITSAR | AMRITSAR | PUNJAB | 143001 | ₹3.7 Cr | 1 | Accepted-AOC AWARDRD |
| 2 | 2₹4.0 Cr+₹26.6 L (7.22%)Rejected-Finance OLD CANTT ROAD FARIDKOT | FARIDKOT | FARIDKOT | PUNJAB | ₹4.0 Cr+₹26.6 L (7.22%) | 2 | Rejected-Finance HIGH BIDDER |
| 3 | 3₹4.1 Cr+₹44.9 L (12.2%)Rejected-Finance | ₹4.1 Cr+₹44.9 L (12.2%) | 3 | Rejected-Finance HIGH BIDDER |
Tender Value
₹4.3 Cr
EMD Value
₹8.6 L
Closing Date
15 Oct 2024, 10:00 amClosed
Executive Engineer
FARIDKOT CANAL AND GW DIVISION FARIDKOT
Estimate for concrete lining of Kokri distributary from RD 63530-74853
2024_WR_127912_1
Estimate for concrete lining of Kokri distributary from RD 63530-74853
Open Tender
Civil Works - Canal
Item Rate
90 days
Jagroan
Pre Qualification Details
2 documents required · 2 mandatory
₹1,000
Yes
₹8.6 L
Yes
FARIDKOT
18 Dec 2024
24 Sept 2024
16 Oct 2024
24 Sept 2024
15 Oct 2024
24 Sept 2024
4 Oct 2024
Amount
Ordinary Jungle Clearance of both banks of running Disty., Minors and Drains including Boundary road with discharge e 1.5 to 3 cumecs
Excavation in soil (any type) using Hydraulic Excavator CK 90 hydraulic excavator of 0.9 cum bucket capacity including cutting and leading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30 m.
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads including cost of earth complete in all complete in all respect, but excluding royality. Lead 7.86 km pucca with last 0.86 km kacha.
Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications
Dressing of Earthwork for new work or remodeling work.
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 1.5 to 3.0 mtr depth
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches.
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification.
Dag Belling single kassi stroke complete in all respect
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes.
Cement concrete lining 10cm thick or less (75mm) with mechanical Paver for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km. Concrete lining to be done on bed and on slide slopes upto vertical height 2.0m.
Providing and laying cement concrete M-15 for Coping mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications
Providing and laying cement concrete M-15 for Sleeper mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Filling Contraction/ construction Joint with sealing compound complete in all respect
Filling expansion joint with Sealing Compound. complete in all respect.
Extra bitumen painting at 0.69 Kg. per Sqm.
Providing & laying 250 mm wide Polythene LDPE Film 150 micron over sleepers
Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling , consolidation and dressing ) With 'H' 0.5 m to 0.9 m. CSR Item No 20.1b(ii)
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling i.e. concrete R.C. Slab and cement masonry. With 'H' 0.5 m to 0.9 m. CSR ITEM NO. 20.02 b (ii)
Earth work involved in constructing new O.F., A.P.M. or O.S.M. type outlets. With 'H' 0.5 m to 0.9 m. CSR Item No 20.1d(ii)
Extra labour for dressing bricks On O.F. and A.P.M. type outlets With H more than 0.5 m. but upto 0.9 m
Making temporary A.P.M. Block and fixing at site In case of new outlets where no dismantling and reconstructing of gullet walls is involved. CSR ITEM NO. 20.3a
Cement concrete 1:3:6 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth.
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.
Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering) including attached pilasters, buttresses etc when curved.
Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc.
Any other Item
CHAMAN LAL GOYAL CONTRACTOR
MADAN MOHAN
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .