Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.0 L+₹54,951.62 (15.9%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.1 L+₹67,962.59 (19.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹4.1 L+₹68,011.87 (19.7%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹4.1 L+₹68,504.71 (19.9%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
23 Feb 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
Please refer BOQ
2026_RDPR_302947_3
e-NIT No. 298 REW Rajouri of 2025 Dated 11-02-2026
Open Tender
Civil Works
Percentage
90 days
Rajouri
Please refer NIT
2 documents required · 2 mandatory
₹500
Executive Engineer REW Rajouri
₹10,000
Yes
26 Feb 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width)80%AKS 20%OR
P/L CEMENT CONCRETE PCC OF GRADE M5
P/L CEMENT CONCRETE PCC OF GRADE M10
P/L OF BOULDERS
CENTERING AND SHUTTRING
P/L non pressure NP3class R C C pipes with collars jointed 800mm dia
Steel reinforcement for rcc work
P/L CEMENT CONCRETE PCC OF GRADE M15
carriage of NP3 RCC pipes by 70 Km MT
carriage of sand and aggregate 50 km MT 200m HL
carriage of boulders 10 km MT
Add Cost Of CIB
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_983247.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .