Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.2 LAccepted-Finance | ₹48.2 L | L1 | Accepted-Finance L1 Bidder |
| 2 | L2₹49.9 L+₹1.6 L (3.36%)Accepted-Finance | ₹49.9 L+₹1.6 L (3.36%) | L2 | Accepted-Finance L2 Bidder |
| 3 | L3₹49.9 L+₹1.6 L (3.38%)Accepted-Finance | ₹49.9 L+₹1.6 L (3.38%) | L3 | Accepted-Finance L3 Bidder |
| Sl No | Description | Qty | Unit | Shubhash Chandra Pandey L3 | MUKESH WALDIA L2 | GOPAL SINGH BHANDARI L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in soil in Hilly areay by mechanincal | 319.5 | cum | 91.57 ₹29,256.62 | 91 ₹29,074.5 | 90 ₹28,755 Lowest |
| 2.00 | Excavation in hilly area in ordinary rock not requirintg blasting by mechanical means | 191.7 | cum | 233.76 ₹44,811.79 | 233 ₹44,666.1 | 232 ₹44,474.4 Lowest |
| 3.00 | Excavation in hilly areas in hard roack means. Lift upto 1.5 m and disposal | 127.8 | cum | 406.39 ₹51,936.64 | 406 ₹51,886.8 | 405 ₹51,759 Lowest |
| 4.00 | Excavatiopn in foundaiton for retaining breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus | 82.69 | cum | 524.27 ₹43,351.89 | 524 ₹43,329.56 | 523 ₹43,246.87 Lowest |
| 5.00 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete | 72 | cum | 5,284.75 ₹3,80,502 | 5,284 ₹3,80,448 | 5,240 ₹3,77,280 Lowest |
| 6.00 | R.R.laid Dry | 518.4 | cum | 2,859.61 ₹14,82,421.82 | 2,859 ₹14,82,105.6 | 2,750 ₹14,25,600 Lowest |
| 7.00 | R.R.laid Dry | 42.5 | cum | 5,107.04 ₹2,17,049.2 | 5,107 ₹2,17,047.5 | 4,900 ₹2,08,250 Lowest |
| 8.00 | providing concrete for plain/ reinforce concrete in open foundtaions 1:2:4 | 324 | cum | 8,431.93 ₹27,31,945.32 | 8,431 ₹27,31,644 | 8,300 ₹26,89,200 Lowest |
| 9.00 | P/F marble sign board complete including writing yojana vivran | 1 | no | 5,900 ₹5,900 Lowest | 5,900 ₹5,900 Lowest | 5,900 ₹5,900 Lowest |
Tender Value
₹48.7 L
EMD Value
₹97,480
Closing Date
20 Mar 2026, 4:00 pmClosed
AMA ZILA PANCHYAT PITHORAGARH
AMA ZILA PANCHYAT PITHORAGARH
Track route from Suvalekh to Chandika Ghat and Chandika Ghat fair ground development work.
2026_PRD_92640_11
2063 Dated 28-02-2026
Open Tender
Civil Works - Roads
Item Rate
365 days
PITHORAGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,502
AMA ZILA PANCHYAT PITHORAGARH
₹97,480
25 Jul 2026
2 Mar 2026
23 Mar 2026
2 Mar 2026
20 Mar 2026
2 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil in Hilly areay by mechanincal | 319.5 | cum | 91.57 | ₹29,256.61 |
| 2 | Excavation in hilly area in ordinary rock not requirintg blasting by mechanical means | 191.7 | cum | 233.76 | ₹44,811.79 |
| 3 | Excavation in hilly areas in hard roack means. Lift upto 1.5 m and disposal | 127.8 | cum | 406.39 | ₹51,936.64 |
| 4 | Excavatiopn in foundaiton for retaining breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus | 82.69 | cum | 524.27 | ₹43,351.89 |
| 5 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete | 72 | cum | 5,284.75 | ₹3,80,502 |
| 6 | R.R.laid Dry | 518.4 | cum | 2,859.61 | ₹14,82,421.82 |
| 7 | R.R.laid Dry | 42.5 | cum | 5,107.04 | ₹2,17,049.2 |
| 8 | providing concrete for plain/ reinforce concrete in open foundtaions 1:2:4 | 324 | cum | 8,431.93 | ₹27,31,945.32 |
| 9 | P/F marble sign board complete including writing yojana vivran | 1 | no | 5,900 | ₹5,900 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.65 MB
TECH_BID_DOCUMENT.pdf
Tender Documents • 0.69 MB
BOQ_109678.xls
BOQ • 0.32 MB
2114.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .