Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.6 LAccepted-AOC GSTIN: 06AAFCE6903L1ZI | ₹34.6 L | 1 | Accepted-AOC Lowest L1 |
| 2 | 1₹34.6 LRejected-Finance GSTIN: 19AGRPD1007H1ZLVICHIITRA SHOP NO 45 KOLKATA WEST INTERNATIONAL CITY SALAP JUNCTION HOWRAH AMTA ROAD BOMBAY CROSSING | HOWRAH | HOWRAH | WEST BENGAL | ₹34.6 L | 1 | Rejected-Finance Lowest L1 |
| 3 | 2₹42.0 LRejected-Finance GSTIN: 19AAOCA0236H1ZP | ₹42.0 L | 2 | Rejected-Finance Lowest L2 |
| Sl No | Description | Qty | Unit | PRECISION SURVEY CONSULTANCY L1 | ADVANCE LAND AND HYDROGRAPHY SURVEY INDIA PRIVATE LIMITED L2 | Ehyte India Private Limited L1 |
|---|---|---|---|---|---|---|
| 1.00 | Carrying out Bathymetry survey of Salaulim Dam including Hydrographic and Topographic survey to cover the entire area of the reservoir up to FRL with 100 m x 100 m grid for hydrographic survey ( area under submergence ) and 100 m x 100 m grid for topographic survey ( area non submerge ) including preparation of Elevation –Area –Capacity table / curve, cross section and L sections, contour maps upto MWL 45.50M, sediment sample collection and a analysis, estimation of quantity of deposited sediment, rate of sedimentation , submission of report, analysis and result completing all aspects as directed by the Engineer in –charge etc. complete.
The following drawings are to be submitted:
1) Contour Map: Contour maps of the reservoir area up to MWL 45.50M.
2) Slop Map: Showing the slop of the reservoir area.
3) 3D surface Map: Showing the 3D surface of the reservoir area.
4) Cross Section Profile Plots: Showing the cross – sectional profiles of the reservoir.
5) Longitudinal Section: Showing the longitudinal section of the deep valley.
6) Tables and Charts: Showing the reservoir area capacity with respect to elevation, life of reservoir, sedimentation profile analysis, particle size distribution, finding, conclusion, and recommendations.
Raw and Processed Data: All data including raw and processed data analysis, reports, and bathymetric charts, will be submitted in both hardcopy and softcopy formats. | 29.64 | Sq Km | 99,000 ₹29.3 L | 1,20,000 ₹35.6 L | 99,000 ₹29.3 L |
Tender Value
₹35.0 L
EMD Value
₹69,950
Closing Date
16 Mar 2026, 4:00 pmClosed
Executive Engineer, WDX, WRD
Works Division X, WRD, Pajimol, Sanguem, Goa
Modeling of sediment yield and its distribution in Salaulim dam.
2026_WRD_28088_1
WDX/Accts./2025-26/e-22
Open Tender
Miscellaneous Works
180 days
Works Division X, WRD, Pajimol, Sanguem
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹69,950
9 Apr 2026
6 Mar 2026
17 Mar 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
Carrying out Bathymetry survey of Salaulim Dam including Hydrographic and Topographic survey to cover the entire area of the reservoir up to FRL with 100 m x 100 m grid for hydrographic survey ( area under submergence ) and 100 m x 100 m grid for topographic survey ( area non submerge ) including preparation of Elevation –Area –Capacity table / curve, cross section and L sections, contour maps upto MWL 45.50M, sediment sample collection and a analysis, estimation of quantity of deposited sediment, rate of sedimentation , submission of report, analysis and result completing all aspects as directed by the Engineer in –charge etc. complete. The following drawings are to be submitted: 1) Contour Map: Contour maps of the reservoir area up to MWL 45.50M. 2) Slop Map: Showing the slop of the reservoir area. 3) 3D surface Map: Showing the 3D surface of the reservoir area. 4) Cross Section Profile Plots: Showing the cross – sectional profiles of the reservoir. 5) Longitudinal Section: Showing the longitudinal section of the deep valley. 6) Tables and Charts: Showing the reservoir area capacity with respect to elevation, life of reservoir, sedimentation profile analysis, particle size distribution, finding, conclusion, and recommendations. Raw and Processed Data: All data including raw and processed data analysis, reports, and bathymetric charts, will be submitted in both hardcopy and softcopy formats.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_28532.pdf
techsummary_28532.pdf
finance_28532.pdf
BOQ Comparative Chart
xlsx
finsummary_28532.pdf
e22Wo.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 1.26 MB
BOQ_28532.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid