Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹6.8 L+₹12,663.88 (1.90%)Rejected-AOC | L2 | Rejected-AOC SECOND LOWEST BIDDER | |
| 3 | L3₹7.1 L+₹37,722.71 (5.65%)Rejected-AOC | L3 | Rejected-AOC THIRD LOWEST BIDDER | |
| 4 | L4₹7.1 L+₹41,214.83 (6.17%)Rejected-AOC | L4 | Rejected-AOC FORTH LOWEST BIDDER |
Tender Value
₹7.6 L
EMD Value
₹19,100
Closing Date
5 Nov 2020, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, LBC Sub Division, Malampuzha Project, Tharekkad, Palakkad Head Post Office Pin 678001
MP LBC Urgent rectification works to the weak and vulnerable portion of canal between ch.18.400Km to 19.000 Km of Peringottukurussi canal
2020_Irrig_395203_1
12/ET/AEE/LBC/PKD/2020-21
Open Tender
Civil Works - Canal
Item Rate
180 days
NEAR KOTTACHANDHA, PERINGOTTUKURUSSI
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,900
Yes
online
₹19,100
Yes
9 Feb 2021
27 Oct 2020
13 Nov 2020
27 Oct 2020
5 Nov 2020
27 Oct 2020
27 Oct 2020 - 4 Nov 2020
Amount
canal lining work
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
60.6 : PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
BENNY KURIAKOSE
ABDUL KHADER SUFAID C M
A ARAVINDAKSHAN
Bidder Name
C MUKUNDAN
BENNY KURIAKOSE
A ARAVINDAKSHAN
ABDUL KHADER SUFAID C M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_562527.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .