Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹3.8 L
Closing Date
31 Jul 2026, 3:00 pm
Akshat Agarwal, CE (Civil)
Room no. 03, Shed no. 22, Regional Stores, ONGC WON Basin, Vadodara
Construction of Office Shed for Infocom Section near Community Centre, WON Basin, ONGC, Vadodara
2026_ONGC_283631_1
B25AC26011
Open Tender
Construction Works
180 days
ONGC Complex
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹3.8 L
Yes
10 Jul 2026
10 Jul 2026
3 Aug 2026
10 Jul 2026
31 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works | |||||
| 1.01 | Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: Channels, angles, tees and flats | 9,554.05 | kg | 2.3 | ₹21,974.31 |
| 1.02 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: Asbestos Cement sheet | 767.75 | sqm | 77.3 | ₹59,347.08 |
| 1.03 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 191.76 | cum | 2,060.2 | ₹3,95,063.95 |
| 1.04 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 69.89 | cum | 2,434.25 | ₹1,70,129.73 |
| 1.05 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 96.42 | cum | 3,551.25 | ₹3,42,411.53 |
| 1.06 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 6 | each | 367.2 | ₹2,203.2 |
| 1.07 | Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in Charge | 3 | each | 134.1 | ₹402.3 |
| 1.08 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sgm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 446.32 | cum | 260.3 | ₹1,16,177.1 |
| 1.09 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 107.27 | cum | 2,123.75 | ₹2,27,814.66 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tender_Document.pdf
Tender Documents • 2.08 MB
Integrity_Pact.pdf
Other Document • 0.51 MB
Annex_VI_Bidder_Response_Sheet.xls
Other Document • 0.18 MB
Annex_V_BEC_Matrix.xls
Other Document • 0.05 MB
BOQ_330922.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid