| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹40.0 LAccepted-AOC | 1 | Accepted-AOC L1 Qualified | |
| 2 | 2₹43.8 L+₹3.8 L (9.55%)Rejected-Finance | 2 | Rejected-Finance 2nd lowest |
| Sl No | Description | Qty | Unit | Kunwar pal L1 | SADAN CONSTRUCTION AND SUPPLIERS L2 |
|---|---|---|---|---|---|
| 1.00 | Rising Main
Supplying carting , laying , jointing of full length 50 mm GI Class-C D/F pipes including testing of pipe line complete. | 40 | M | 600 ₹24,000 | 500 ₹20,000 Lowest |
| 2.00 | Excavation of earth for pipe line in soil mixed with shingle ,bajri, and boulder strata lift up to 1.5 m. lead up to 30m. Including reffiling, watering, remaining lf excavated earth into the trenches and removal of surplus earth up to a distance of 60m from trenches including supply of labour T&P etc. all complete. | 27.2 | cum | 280 ₹7,616 Lowest | 280 ₹7,616 Lowest |
| 3.00Providing & fixing of following valves and fitting ISI marked medium class:- Sluice valve Pressure PN 1.6 | |||||
| 3.01 | 50mm | 5 | no. | 9,600 ₹48,000 | 9,000 ₹45,000 Lowest |
| 4.00 | Constructing masonry Chamber 90x90x100 cm inside, in brick work
in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep (inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement
complete as per standard design : With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 | 1 | no. | 10,000 ₹10,000 Lowest | 14,000 ₹14,000 |
| 5.00Pipe Line Work Supply of HDPE pipe including laying jointing Field testing,commissioning complete at site of HDPE (pe100 grade compound)pipe as per IS 4984 and specifications for water application including all cost of material, labourrequired,transpotation,loading,unloading& stacking etc. | |||||
| 5.01 | 110mm | 382 | M | 459 ₹1,75,338 Lowest | 459 ₹1,75,338 Lowest |
| 5.02 | 90mm | 818 | M | 312 ₹2,55,216 Lowest | 313.6 ₹2,56,524.8 |
| 5.03 | 63 mm | 200 | M | 179 ₹35,800 Lowest | 179 ₹35,800 Lowest |
| 6.00Supply, carting and fixing in position of following CI D/F sluice / Gate valve for flow regulation & scouring including cost of valve specials, labour & T&Pcomplete. | |||||
Tender Value
₹46 L
EMD Value
₹92,000
Closing Date
14 Dec 2021, 5:00 pmClosed
Executive Engineer
Executive Engineer Construction Division UKPJN Haridwar
Supply and Laying and Jointing of pipe line and construction of OHT Pump House providing household connections construction of boundary wall boring of tube well in Rithora Grant Block Bahadrabad water supply scheme
2021_MDPEY_39182_1
Letter No. 2920/NIVIDA/600, Dated 29.11.2021
Open Tender
Civil Works
Item Rate
150 days
Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
Executive Engineer Construction Division UKPJN
₹92,000
6 Aug 2025
1 Dec 2021
16 Dec 2021
1 Dec 2021
14 Dec 2021
1 Dec 2021
Amount
Rising Main Supplying carting , laying , jointing of full length 50 mm GI Class-C D/F pipes including testing of pipe line complete.
Excavation of earth for pipe line in soil mixed with shingle ,bajri, and boulder strata lift up to 1.5 m. lead up to 30m. Including reffiling, watering, remaining lf excavated earth into the trenches and removal of surplus earth up to a distance of 60m from trenches including supply of labour T&P etc. all complete.
Providing & fixing of following valves and fitting ISI marked medium class:- Sluice valve Pressure PN 1.6
Constructing masonry Chamber 90x90x100 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep (inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design : With common burnt clay F.P.S.(non modular) bricks of class designation 7.5
Pipe Line Work Supply of HDPE pipe including laying jointing Field testing,commissioning complete at site of HDPE (pe100 grade compound)pipe as per IS 4984 and specifications for water application including all cost of material, labourrequired,transpotation,loading,unloading& stacking etc.
Supply, carting and fixing in position of following CI D/F sluice / Gate valve for flow regulation & scouring including cost of valve specials, labour & T&Pcomplete.
C.I. D/F Sluice Valves Confirming to IS: 14846-2000 ( Kirloskar or equivalent) of Pressure PN 1.0
Air valve 25 mm dia
Excavation of pipe line in soil mixed with course sand, shingle, kankar, including refilling of trenches after laying of pipe line including watering ramming etc.
House Hold connection including all material etc complete.
Dismantling of following type of road surfaces for laying of pipe line including sorting out of serviceable materials and disposal of unserviceable materials.
Cement concrete road
Reinstatement of following type of road surfaces after laying of pipe line including supply of all material ,labour,T&P etc complete.
Cement concrete road
Construction of following chambers
(i) Sluice valve/ wheel valve chamber(90X90X100)
Pump House Construction of Pump House and its all Apprutment work including all material Labour T&P etc complete as per drawing provided by deptt. and as per Direction of Engineer Incharge.
E&M Transportation of Rig Machine, Air Compressor, O P Unit and camp equipages, connected T&P and necessary material required for drilling up to site of work, including loading, unloading etc. complete.
Errection and leveling of ring machine and barricading at site of work `
Dismantling of ring machine and clearance of site after satisfactory completion of work
Drilling of borehole by Dual rotary/ DR/ DC-RC/Percussion Rig machine/ Odex.
Drilling of 175 mm dia borehole from GL to 100 Mtr BGL
Preparing & lowering of tube well assembly starting from G.L to the required depth including cutting, welding as required at site complete with all T&P required.
Supply and lowering of 175 mm dia MSERW fin cut plain pipe, 5.6 mm thick as per IS code 4270
200 mm dia bail plug
200 mm dia MS tube-well cap
Supply & fixing of 200 mm dia M.S.D.I. housing clamp & girder set
Supply & shrouding of pea gravel in between bore & tube well assembly to the entire depth of tube well.
Development of TW by 300 PSI/900 CFM Air compressor as below including Erection of compressor at site of work.
Running of compressor for development and testing of tube well.
Development of TW by suitable size of OP Unit as below including Erection of OP Unit and camp equipage at site of work.
Lowering of suitable size submersible pump motor set with column pipe and running of D.G. Set, running of OP Unit for development and yield test of tube well.
Geological survey of site
Chemical & bacteriological testing of water sample
Supply of submersible pump capable of delivering 150 Lpm discharge at 55 mt. head with 5 HP electric motor to be operated on 415 volt (+\- 10% ), 3 phase,50 C\s AC supply with 5 Mtr. submersible cable.
Supply of spare pumping plant as above .
Supply of electrical panel cum starter suitable for automation with panel of 5 HP .
Supply of 40 amp. 3 phase with neutral FN type main switch with enclouser and HRC fuses.
Supply of submersible cable 1x3x4 sq.mm .
Supply of aluminum armored cable 16 sq.mm 3.5 core .
SUPPLY OF MAIN PIPING AND VALVE OF 80 mm DIA HAVING FOLLOWING ITEM .
C class M S column pipe (confirming IS: 4270 or latest IS code) in 3 mt. length with interlocking arrangement (flanged/socketed) .
CI D\F PN-1.6 Sluice Valve with hand wheel .
CI D\F PN-1.6 Reflux Valve .
MS D\F pipe of 1.5 Mt. length- 2 Nos, MS D/F pipe of 1.0 Mt. length-1 No., Ventury - 1 No, Tee-1 No, CI D\F bend-2 Nos, TW Cap-1 No., Packing & nut bolt etc. - 1 Lot.
S/o 80 mm dia M.S.D.I. clamp set .
S/o Jointing material for wiring connection including lugs, thimble, insulation tapes etc.
S/o Pressure Gauges with control cock & fitting, nipple, pipe, elbow etc complete- 10Kg/Sq Cm.
Installation of pumping plants and accessories.
Supply and installation of dozing pump of 6kg/cm sqr. Up to 4 lph dozing of chlorination suitable to operate at single phase supply 215 v ,+/-10% along with all necessary connecting devices complete with 200 ltr. Tanks ,along with stabilizer, stands including first fill sodium hypo chloride solution of 200 ltr, complete in each and every respect .
Testing of pumping plants at manufacturer's works .
Earthing with G.I Earth plate of 600mmx600mmx 6mm size including accessories and providing masonry enclosure with providing and fixing 25mmx5mm GI strip on surface or in recess for connections with charcoal, salt as required.
Supply of necessary tools and spanners .
Supply of 2 ton capacity and 4.5 mt. lift chain pulley block .
Supply of rubber resistance insulated sheet 2M x 1M x 25mm thick .
Wiring for light point, fan point etc. with 1.5 sq mm FR PVC insulated copper conductor single core cable in surface PVC conduit with piano type switch, phenolic laminated sheet, suitable size GI box, with earth wire of 1.5 sq mm FR PVC insulated copper conductor single core cable etc as required.
Wiring for circuit/sub main along with earth wire with the following size of FR PVC insulated copper conductor single core cable in surface PVC conduit as required.
2x2.5 sq. mm + 1x2.5 sq. mm earth wire
2x4 sq. mm + 1x4 sq. mm earth wire
Supply and fixing of metal box of 180 rnmx100mmx160 mm deep on surface with suitable size phenolic laminated sheet cover in front including providing and fixing 6 pin 5/6 amp and 15x16 amp socket outlet and 15/16 amp piano type switch, connections, painting etc as required.
Supply and fixing of following way S.P.N. sheet steel, MCB DB, 240 V on surface complete with copper bus bar, neutral bus bar, earth bar, inter connections including earthing etc as required. (But without MCB/RCCB/Isolator)
6 Way double door ,
Supply and fixing of 5 A to 32 A, 240 V, 10 KA, C serious MCB suitable for inductive load of following pole in the existing MCB DB complete with connection, testing etc as required.
Supply and fixing of double pole, 240 V, isolator in the existing MCB DB complete with connection, testing etc as required.
Supply and fixing of 20 W LED tube light complete in all respect (Bajaj/Philips OR Equivalent make)
Supply in fixing of LED external lighting luminaries with mounting bracket etc. complete.
SADAN CONSTRUCTION AND SUPPLIERS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_46279.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .