Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | DHARAM DEV CHAUHAN L1 | ARUN CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.01 | Dismentaling Brick work including stacking of material with in a distance of 60M as directed by Engineer-in-Charge | 14.95 | m3 | 500 ₹7,475 | 570 ₹8,521.5 |
| 1.02 | Earth work in Excavation/filling for making section of existing channel in all type of strata for linning including all leads, lifts, manual compaction and dressing to required profile with cost of all material,labour and T&P for proper completion of work as directed by Engineer-In-Charge as per drawing and I.D. specification. | 1,399.01 | m3 | 85 ₹1,18,915.85 | 85 ₹1,18,915.85 |
| 1.03 | Preparation of sub-grade excluding cost of earth in linning including watering compaction and all leads, lift and dressing to required profile with cost of all material, labour and T&P required for Proper completion of work. | 4,146 | M2 | 10 ₹41,460 | 50 ₹2,07,300 |
| 1.04 | Centering and shuttering for C.C. work including cost of all materials, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge | 981.43 | m2 | 500 ₹4,90,715 | 500 ₹4,90,715 |
| 1.05 | Providing & Laying C.C. (1:2:4) with coarse sand and crushed aggregate including all cost of material, labour and T&P etc.with all leads and lift for proper completion of work as directed by Engineer-in-Charge | 8.37 | m3 | 9,500 ₹79,515 | 10,900 ₹91,233 |
| 1.06 | Providing & Laying C.C. (1:1.5:3) with course sand and crushed aggregate with all cost of material, labour & T&P etc. as directed by Engineer-in-Charge | 488.75 | m3 | 10,500 ₹51,31,875 | 10,000 ₹48,87,500 |
| 1.07 | Providing and Filling100 mm thick coarse sand with cost of all material,labour and T&P for proper completion of work as directed by Engineer-In-Charge as per drawing and I.D. specification. | 451.81 | m3 | 4,800 ₹21,68,688 | 5,000 ₹22,59,050 |
| 1.08 | Providing and laying stone grite 12.5 mm to 20 mm with cost of all material,labour and T&P for proper completion of work as directed by Engineer-In-Charge as per drawing and I.D. specification. | 443.36 | m3 | 4,800 ₹21,28,128 | 5,600 ₹24,82,816 |
| 1.09 | Providing and laying 150 micron thick L.D.P.E film(first grade) with cost of all material,labour and T&P for proper completion of work as directed by Engineer-In-Charge as per drawing and I.D. specification. | 4,333.6 | m2 | 39 ₹1,69,010.4 | 39.5 ₹1,71,177.2 |
| 1.10 | Providing & Filing in Position bitumen mix filler of VG 10 in groove in expansion joints and contraction joints including cost of Bitumen materials and cost of fuel as directed by Engineer-In-Charge as per drawing and I.D. specification. | 3,576.1 | R.M | 60 ₹2,14,566 | 61.46 ₹2,19,787.11 |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
20 May 2026, 11:00 amClosed
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
C.C. Lining work
2026_UPIDC_1147928_4
04/S.E./2026-27
Open Tender
Civil Works
180 days
Azamgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,150
₹2.4 L
Yes
Azamgarh
25 Jun 2026
14 May 2026
20 May 2026
14 May 2026
20 May 2026
14 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismentaling Brick work including stacking of material with in a distance of 60M as directed by Engineer-in-Charge | 14.95 | m3 | - | - |
| 1.02 | Earth work in Excavation/filling for making section of existing channel in all type of strata for linning including all leads, lifts, manual compaction and dressing to required profile with cost of all material,labour and T&P for proper completion of work as directed by Engineer-In-Charge as per drawing and I.D. specification. | 1,399.01 | m3 | - | - |
| 1.03 | Preparation of sub-grade excluding cost of earth in linning including watering compaction and all leads, lift and dressing to required profile with cost of all material, labour and T&P required for Proper completion of work. | 4,146 | M2 | - | - |
| 1.04 | Centering and shuttering for C.C. work including cost of all materials, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge | 981.43 | m2 | - | - |
| 1.05 | Providing & Laying C.C. (1:2:4) with coarse sand and crushed aggregate including all cost of material, labour and T&P etc.with all leads and lift for proper completion of work as directed by Engineer-in-Charge | 8.37 | m3 | - | - |
| 1.06 | Providing & Laying C.C. (1:1.5:3) with course sand and crushed aggregate with all cost of material, labour & T&P etc. as directed by Engineer-in-Charge | 488.75 | m3 | - | - |
| 1.07 | Providing and Filling100 mm thick coarse sand with cost of all material,labour and T&P for proper completion of work as directed by Engineer-In-Charge as per drawing and I.D. specification. | 451.81 | m3 | - | - |
| 1.08 | Providing and laying stone grite 12.5 mm to 20 mm with cost of all material,labour and T&P for proper completion of work as directed by Engineer-In-Charge as per drawing and I.D. specification. | 443.36 | m3 | - | - |
| 1.09 | Providing and laying 150 micron thick L.D.P.E film(first grade) with cost of all material,labour and T&P for proper completion of work as directed by Engineer-In-Charge as per drawing and I.D. specification. | 4,333.6 | m2 | - | - |
| 1.1 | Providing & Filing in Position bitumen mix filler of VG 10 in groove in expansion joints and contraction joints including cost of Bitumen materials and cost of fuel as directed by Engineer-In-Charge as per drawing and I.D. specification. | 3,576.1 | R.M | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.63 MB
Biddocument4.pdf
Tender Documents • 1.93 MB
BOQ_2148359.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid