Loading…
Loading…
Tender Value
₹4.8 Cr
EMD Value
₹9.6 L
Closing Date
8 Jun 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TRD/NS
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or "V" whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited.
Three similar works costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works costing not less than the amount equal to 40% of advertised value of the tender, or One similar work costing not less than the amount equal to 60% of advertised value of the tender.
In reference to sub para-01 above, similar single work means "Execution of any 1500 V DC or 25 KV AC OHE works".
18 conditions · 8 needing a document upload
Tenderer should submit certified copy of partnership deed, Memorandum & articles of association if applicable.
Tenderer should submit EPFO/ESIC details, if applicable.
Tenderer should submit certified copy of Power of attorney, board resolution/ Memorandum of Association & Article of association authorization to sign the tender documents on behalf of partnership/Limited/Pvt Ltd firm if applicable
Tenderer should submit attested copy of Annexure I.
For Technical Eligibility Criteria, Tenderer should submit completion certificate issued by the concerned executive of nature Similar work: Note- Work executed with Central/State Govt./Semi- Govt. Organisations/Authorities, PSUs, Govt. of India under takings shall only be considered to qualify above eligibility. Certificates from the private Individuals/Organizations shall not be considered. DOCUMENTS TO BE UPLOADED ALONG WITH TENDER : The following documents are required to be uploaded along with tender. a)List of personnel, Organisation available on hand and proposed to be engaged for the subject work. b)List of Plant & Machinery, available on hand (own) and proposed to be inducted (own & hired to be given separately) for the subject work. c)List of works completed, in the qualifying period giving description of work, organisation for whom executed, approximate value of contract at the time of award , date of award & date of scheduled completion of work, date of actual start, actual completion and final value of contract should also be given. d)List of works on hand indicating description of work, contract value, approximate value of balanced work yet to be done & date of award. Note : 1) In case of item (c) & (d) above, supportive documents/ certificates from the organisation with whom they worked/ are working should be enclosed. 2) Certificates from the private individuals for whom such works are executed/being executed will not be accepted.
Tenderer should submit attested copy of pan card.
Tenderer should submit certificate stating that the company is not Blacklisted/Debarred.
Tenderer should submit attested copy of Employment/ Partnership or Non employment/partnership of Retired Railway certificate if applicable.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
In case the date of submission / opening is declared as holiday by the Central Govt., then the tender shall be opened on next working day in the same manner.
GST will be applicable as per latest rule.
Tenderer are advised to update the all required details mentioned in Shramik Kalyan Portal of Indian Railway website www.shramikkalyan.indianrailways.gov.in and as well as LOA details early.
The Tenderer have to visit the work site and should be aware of the site conditions.
The Tenderer have to read and go through the Tender document and GCC April 2022 with amendments and if any conditions or any criteria which has not been mentioned in tender document but are applicable as per GCC April 2022, it should be strictly followed
OHE modification work in connection with extension of NIYOL-BHET by pass line to UP Loop with provision of extension of DN loop upto S-5 UDN in Virar-Surat section of Mumbai Division
EL-TRD-W-118-26-27-8
EL-TRD-W-118-26-27-8
Open
Works - General
12 Months
Valsad, Gujarat
₹0
₹9.6 L
8 Jun 2026
14 May 2026
25 May 2026
123 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 4,79,23,304.6 | ||
| — | 10.00 | — | — | ||
| Survey,design and preparation of OHE lay outplan, SED and relevant drawings as per specifications & explanatory notes. | — | — | — | 2,56,770 | |
| — | 4.00 | — | — | ||
| Preparation of SWR diagram board as per specifications & explanatory notes. | — | — | — | 58,400 | |
| — | 4.00 | — | — | ||
| Erection of SWR diagram board as per specifications & explanatory notes. | — | — | — | 5,844 | |
| — | 80.00 | — | — | ||
| Supply of fabricated galvanised steel structure and SPS as per specifications & explanatory notes. | — | — | — | 1,13,23,440 | |
| — | 80.00 | — | — | ||
| Erection of fabricated galvanised steel structure and SPS as per specifications & explanatory notes. | — | — | — | 7,22,400 | |
| — | 800.00 | — | — | ||
| Digging,casting ,grouting & muffing of foundation(including cost of cement & materials) as per specifications & explanatory notes. | — | — | — | 57,28,800 | |
| — | 250.00 | — | — | ||
| Supply of cantilevers assemblies complete including insulators as per specifications & explanatory notes. | — | — | — | 66,07,750 | |
| — | 250.00 | — | — | ||
| Erection of cantilevers assemblies complete including insulators as per specifications & explanatory notes. | — | — | — | 5,55,500 | |
| — | 6.00 | — | — | ||
| Erection of over head equipment including supply of droppers, clip etc as per specifications & explanatory notes. | — | — | — | 16,41,552 | |
| — | 24.00 | — | — | ||
| Supply of material for termination of single/double conductor as per specifications & explanatory notes. | — | — | — | 3,32,736 | |
| — | 24.00 | — | — | ||
| Erection of material for termination of single/double conductor as per specifications & explanatory notes. | — | — | — | 49,344 | |
| — | 12.00 | — | — | ||
| Supply of regulating equipment 3-pulley type as per specifications & explanatory notes. | — | — | — | 7,51,896 | |
| — | 12.00 | — | — | ||
| Erection of regulating equipment 3-pulley type as per specifications & explanatory notes. | — | — | — | 97,032 | |
| — | 24.00 | — | — | ||
| Supply of guy rod assemblies as per specifications & explanatory notes. | — | — | — | 2,49,360 | |
| — | 24.00 | — | — | ||
| Erection of guy rod assemblies as per specifications & explanatory notes. | — | — | — | 40,752 | |
| — | 4.00 | — | — | ||
| Supply of section insulator assembly as per specifications & explanatory notes. | — | — | — | 2,05,376 | |
| — | 4.00 | — | — | ||
| Erection of section insulator assembly as per specifications & explanatory notes. | — | — | — | 42,712 | |
| — | 120.00 | — | — | ||
| Supply of solid core 9-tone cut-in insulators as per specifications & explanatory notes. | — | — | — | 9,58,920 | |
| — | 120.00 | — | — | ||
| Erection of solid core 9-tone cut-in insulators as per specifications & explanatory notes. | — | — | — | 1,80,960 | |
| — | 8.00 | — | — | ||
| Supply of in-span droppers with dropper clips etc, according to 2 x 25 kV system including 1 'C' jumper in each span with PG clamps and related fittings and required Anti- theft Jumper with fittings and fasteners as per specifications & explanatory notes. | — | — | — | 8,56,992 | |
| — | 8.00 | — | — | ||
| Erection of in-span droppers, improvement of presag to 50 mm, contact wire gradient improvement (2 mm/ 1mm) as per specifications & explanatory notes. | — | — | — | 1,71,480 | |
| — | 60.00 | — | — | ||
| Supply of material for Provision of solid core suspension insulator with all accessories for feeder wire as per specifications & explanatory notes. | — | — | — | 6,08,436.6 | |
| — | 60.00 | — | — | ||
| Erection of material for Provision of solid core suspension insulator with all accessories for feeder wire as per specifications & explanatory notes. | — | — | — | 74,135.4 | |
| — | 6.00 | — | — | ||
| Supply of 234sqmm Aluminum (Spider conductor) feeder wire on seperate mast as per specifications & explanatory notes. | — | — | — | 11,58,273 | |
| — | 6.00 | — | — | ||
| Erection of 234sqmm Aluminum (Spider conductor) feeder wire on seperate mast as per specifications & explanatory notes. | — | — | — | 1,15,823.16 | |
| — | 80.00 | — | — | ||
| Provision (Supply and Erection) of various items for successful erection and commissioning of feeder wire as per specifications & explanatory notes. | — | — | — | 13,75,889.6 | |
| — | 8.00 | — | — | ||
| Supply of material for provision of termination assembly for feeder wire as per specifications & explanatory notes. | — | — | — | 90,138.72 | |
| — | 8.00 | — | — | ||
| Erection of material for provision of termination assembly for feeder wire as per specifications & explanatory notes. | — | — | — | 9,171.36 | |
| — | 40.00 | — | — | ||
| Supply of bimetallic parallel clamp to avoid direct connection between aluminum feeder & copper jumper as per specifications & explanatory notes. | — | — | — | 13,015.92 | |
| — | 40.00 | — | — | ||
| Erection of bimetallic parallel clamp to avoid direct connection between aluminum feeder & copper jumper as per specifications & explanatory notes. | — | — | — | 1,296.96 | |
| — | 6.00 | — | — | ||
| Supply of Arial Earth Conductor (AEC) with Supply of Arial Earth Conductor (AEC) with necessary accessories, fittings and fastenerson OHE mast/ Portals as per specifications & explanatory notes. | — | — | — | 4,53,211.08 | |
| — | 6.00 | — | — | ||
| Erection of Arial Earth Conductor (AEC) with Supply of Arial Earth Conductor (AEC) with necessary accessories, fittings and fastenerson OHE mast/ Portals as per specifications & explanatory notes. | — | — | — | 1,04,588.22 | |
| — | 6.00 | — | — | ||
| Supply of Buried Earth Conductor (BEC) with necessary accessories fittings and fasteners as per specifications & explanatory notes. | — | — | — | 2,44,034.58 | |
| — | 6.00 | — | — | ||
| Erection of Buried Earth Conductor (BEC) with necessary accessories fittings and fasteners as per specifications & explanatory notes. | — | — | — | 2,09,176.5 | |
| — | 30.00 | — | — | ||
| Supply of Earthing stations as per specifications & explanatory notes. | — | — | — | 1,44,553.14 | |
| — | 30.00 | — | — | ||
| Erection of Earthing stations as per specifications & explanatory notes. | — | — | — | 49,122.36 | |
| — | 2.00 | — | — | ||
| Supply of 25KV 1600A single pole isolators as per specifications & explanatory notes. | — | — | — | 1,29,358 | |
| — | 2.00 | — | — | ||
| Erection of 25KV 1600A single pole isolators as per specifications & explanatory notes. | — | — | — | 9,862 | |
| — | 20.00 | — | — | ||
| Adjustment of OHE overlap/crossover as per specifications & explanatory notes. | — | — | — | 5,34,280 | |
| — | 240.00 | — | — | ||
| Modification of Catenary wire with false contact wire(Contact wire will be supplied by Railway) as per specifications & explanatory notes. | — | — | — | 1,40,880 | |
| — | 2.00 | — | — | ||
| Supply of PTFE Neutral Section as per specifications & explanatory notes. | — | — | — | 22,20,270 | |
| — | 2.00 | — | — | ||
| Erection of PTFE Neutral Section as per specifications & explanatory notes. | — | — | — | 7,234 | |
| — | 80.00 | — | — | ||
| Transfer of OHE from one mast / support to another as per specifications & explanatory notes. | — | — | — | 8,37,040 | |
| — | 1000.00 | — | — | ||
| Supply of various types of galvanized traction bonds as per specifications & explanatory notes. | — | — | — | 6,63,000 | |
| — | 1000.00 | — | — | ||
| Erection of various types of galvanized traction bonds as per specifications & explanatory notes. | — | — | — | 2,91,000 | |
| — | 600.00 | — | — | ||
| Supply of retro-reflective type number plates with SPS as per specifications & explanatory notes. | — | — | — | 2,91,000 | |
| — | 600.00 | — | — | ||
| Erection of retro-reflective type number plates with SPS as per specifications & explanatory notes. | — | — | — | 49,200 | |
| — | 100.00 | — | — | ||
| Supply of Caution board as per specifications & explanatory notes. | — | — | — | 2,91,300 | |
| — | 100.00 | — | — | ||
| Erection of Caution board as per specifications & explanatory notes. | — | — | — | 97,100 | |
| — | 20.00 | — | — | ||
| Supply of 'G' tpye copper jumper of 160 sq.mm as per specifications & explanatory notes. | — | — | — | 2,04,200 | |
| — | 20.00 | — | — | ||
| Erection of 'G' tpye copper jumper of 160 sq.mm as per specifications & explanatory notes. | — | — | — | 44,320 | |
| — | 20.00 | — | — | ||
| Slewing/lowering of OHE for crane working as per specifications & explanatory notes. | — | — | — | 1,00,520 | |
| — | 20.00 | — | — | ||
| Lowering/raising of height of OHE by adjustment of bracket termination assembly as per specifications & explanatory notes. | — | — | — | 42,000 | |
| — | 20.00 | — | — | ||
| Repairing of platform roof surface after replacement of OHE structures as per specifications & explanatory notes. | — | — | — | 78,360 | |
| — | 20.00 | — | — | ||
| Transportation of released material from site to store depot or for DS-8ed as per specifications & explanatory notes. | — | — | — | 1,16,240 | |
| — | 1200.00 | — | — | ||
| Supply & erection of UV protected HDPE mesh inside the portal booms as per specifications & explanatory notes. | — | — | — | 2,94,000 | |
| — | 2500.00 | — | — | ||
| Supply & Erection of Anti bird disc suitable for porcelain type Bracket/Stay/9 tonne insulators as per RDSO drawing as per specifications & explanatory notes. | — | — | — | 51,37,500 | |
| — | 60.00 | — | — | ||
| Dismantling of cantilever assembly as per specifications & explanatory notes. | — | — | — | 1,00,500 | |
| — | 88.00 | — | — | ||
| Dismantling & removal of Mast, portal, TTC & other small part steel as per specifications & explanatory notes. | — | — | — | 5,12,248 | |
| — | 100.00 | — | — | ||
| Breaking of OHE structure cement concrete foundation as per specifications & explanatory notes. | — | — | — | 2,14,100 | |
| — | 10.00 | — | — | ||
| Stencil work as per specifications & explanatory notes. | — | — | — | 28,910 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022.pdf
ATTACHMENT
AnnexureV.pdf
ATTACHMENT
AnnexureV-A.pdf
ATTACHMENT
AnnexureI.pdf
ATTACHMENT
AnnexureVI-A.pdf
ATTACHMENT
ACS1.pdf
ATTACHMENT
ACS2.pdf
ATTACHMENT
ACS3.pdf
ATTACHMENT
GCCACS4.pdf
ATTACHMENT
ACS5.pdf
ATTACHMENT
GCCACS6.pdf
ATTACHMENT
ACS7.pdf
ATTACHMENT
ACS8-Termiationperforma.pdf ACS 8
ATTACHMENT
ACS 9
ATTACHMENT
ACS10.pdf
ATTACHMENT
ACS11.pdf
ATTACHMENT
Tenderdocument_1.pdf
ATTACHMENT
ACS8-Termiationperforma.pdf
ATTACHMENT
ACS9-Insurancesecuritybond.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .