| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.5 LRejected-Finance | ₹2.5 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | JAGANNATHA RAI L1 | MUHAMMED SABIR GH L2 |
|---|---|---|---|---|---|
| 1.00SEETHAMGOLI CHOWKKAR ROAD MAINTENENCE | |||||
| 1.00 | 2.14.2.A:Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 (II) By Mechanical Means (A) Bituminous Courses | 2.16 | cum | 425.85 ₹919.84 | 426.28 ₹920.76 |
| 1.00 | 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 66 | sqm | 15 ₹990 | 15.01 ₹990.66 |
| 1.00 | OD129586/2025-2026:Granular sub-base/base/surface course with Serviceable material available during scarifying of existing road. Construction of granular sub-base with department materials spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. ( Modified 4.11.2) | 4.95 | cum | 190.71 ₹944.01 | 190.91 ₹945 |
| 1.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65) | 20.8 | sqm | 387.02 ₹8,050.02 | 387.4 ₹8,057.92 |
| 1.00 | 5.5.A.1a:Modified Penetration Macadam 50 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 20.4 | sqm | 298.89 ₹6,097.36 | 299.19 ₹6,103.48 |
| 1.01 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 8.1 | cum | 3,517.81 ₹28,494.26 | 3,521.34 ₹28,522.85 |
| 1.01 | 5.1.1a:Prime Coat :- Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 108 | sqm | 75.64 ₹8,169.12 | 75.71 ₹8,176.68 |
| 1.01 | 5.2.3a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 108 | sqm | 16.37 ₹1,767.96 | 16.39 ₹1,770.12 |
| 1.01 | 5.2.1a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 258 | sqm | 13.71 ₹3,537.18 | 13.73 ₹3,542.34 |
Tender Value
₹2.5 L
EMD Value
₹6,348
Closing Date
5 Nov 2025, 1:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER Badiadka Grama Panchayath
Annual Plan-BADIADKA GP PROJ NO 141/26 SEETHAMGOLI CHOWKKAR ROAD MAINTENENCE-WARD 19-General Civil Work
2025_LSGD_816032_1
02/2025-26/AE/LSGD/BGP
Open Tender
Civil Works - Roads
180 days
Badiadka Grama Panchayath
Please refer Tender documents
9 documents required · 9 mandatory
₹560
Yes
₹6,348
Yes
7 Feb 2026
28 Oct 2025
6 Nov 2025
28 Oct 2025
5 Nov 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1366706.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.74 MB
Download all tender documents and submit your bid