Loading…
Loading…
Tender Value
₹5.5 L
EMD Value
₹13,762
Closing Date
8 Oct 2026, 11:00 am6d left
AE LSGD ELY GP
O/o The Assistant Engineer, LSGD Section, Elavanchery Grama Panchayat
Elavanchery GP 2026- 27 Mannathikolumbu Anganvadi Maintenance in Ward 6-Pro.No-66/26-27
2026_LSGD_874280_1
T2/2026/AE/LIDEW/ELYGP
Open Tender
Civil Works - Buildings
Item Rate
210 days
ELAVANCHERY
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,215
Yes
₹13,762
Yes
30 Sept 2026
30 Sept 2026
9 Oct 2026
30 Sept 2026
8 Oct 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance | |||||
| 1.001 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 6 | each | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 11.92 | cum | - | - |
| 1.003 | OD65605/2026-2027:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m | 9.16 | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.44 | cum | - | - |
| 1.005 | OD65604/2026-2027:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 6.52 | cum | - | - |
| 1.006 | OD64121/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 16.38 | cum | - | - |
| 1.007 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 8.14 | sqm | - | - |
| 1.008 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.62 | cum | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 109.92 | kilogram | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1483591.xls
BOQ • 0.32 MB
AFF.pdf
Tender Documents • 0.28 MB
EPAYMNT.pdf
Tender Documents • 0.28 MB
FEE.pdf
Tender Documents • 0.47 MB
FOT.pdf
Tender Documents • 0.29 MB
IPACT.pdf
Tender Documents • 0.23 MB
PAGMT.pdf
Tender Documents • 0.30 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 1.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .