| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -3.77% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 CrAdmitted-Finance | -2.39% | ₹1.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.2 CrAdmitted-Finance | -0.50% | ₹1.2 Cr | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
16 Apr 2026, 5:00 pmClosed
GENERAL MANAGER CIVIL
SEC 6 NOIDA
M/o Road (M/o Drain, Culvert, Paver Block and Outer Boundary Wall, Repair of LIG Appartment in Sector-99) Noida
2026_NOIDA_1132632_1
44/NOIDA/DyGM/SM-WC-03/2025-26
Open Tender
Civil Works - Others
180 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹2.4 L
6 May 2026
2 Apr 2026
17 Apr 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. DSR 2018/I.No. 15.56/P-253 | - | Sqm | - | - |
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | - | Cum | - | - | |
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | - | Cum | - | - | |
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge | - | Sqm | - | - | |
Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost). | - | Sqm | - | - | |
Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction and of approved size and design/ shape laid in required colour and pattern over and including 50mm thick compacted bed of course sand, filling the joints with coarse sand etc. all complete as per the direction of Engineer-in-charge. DSR 2018/I.No. 16.68/P-277 | - | Sqm | - | - | |
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.The contractor has to diffrent utilites like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-charge. all kinds of soil. | - | Cum | - | - | |
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured) : From brick work in cement mortar DSR-18/ I.No: 15.8.3 | - | 1000 Nos. | - | - | |
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (Brick available at site & free of cost) | - | Cum | - | - | |
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. . DSR-18/I.No-15.60 | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
TD.pdf
Tender Documents • 5.42 MB
44C.xls
Additional Documents • 0.05 MB
BOQ_2113978.xls
BOQ • 0.27 MB