| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.8 Cr+₹3.7 L (2.06%)Rejected-Finance 258 0 2ND FLOOR KILPAUK GARDEN ROAD KILPAUK REGENCY VILLAGE TOWN KILPAUK CITY CHENNAI CHENNAI TAMIL NADU 600010 INDIA | CHENNAI | TAMIL NADU | 600010 | ₹1.8 Cr+₹3.7 L (2.06%) | L2 | Rejected-Finance Rejected due to L2 |
| 3 | L3₹1.9 Cr+₹6.4 L (3.53%)Rejected-Finance | ₹1.9 Cr+₹6.4 L (3.53%) | L3 | Rejected-Finance Rejected due to L3 |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
23 Dec 2019, 4:00 pmClosed
EXECUTIVE ENGINEER, PORT DEPARTMENT
No1, Rue Dumas, Port Department, Pondicherry
Extended dredging at the common entrance of fishing and commercial harbour for free navigaton of fishing vessels phase III/2019-20
2019_PORT_5333_1
3299/PORT/EE/AE(M3)/OF/2019-20
Open Tender
Miscellaneous Services
Item Rate
90 days
Ariyankuppam river channel Port Department Pondich
As per NIT
2 documents required · 2 mandatory
₹1,050
EXECUTIVE ENGINEER PORT DEPARTMENT
₹3.6 L
No1, Rue Dumas, Port Department, Pondicherry-1
6 Feb 2020
10 Dec 2019
23 Dec 2019
10 Dec 2019
23 Dec 2019
13 Dec 2019
13 Dec 2019
Amount
Dredging
Dredging in the Ariyankuppam river Inner Channel from the existing level to the level to be indicated by the department in all kind of soils like clay, silt sand and gravel etc. but excluding isolated boulders and hard rock using non-propelled cutter suction dredger of the department including diesel cost, manning operation, all incidental cost towards water supply, power supply for illumination, shifting of anchors for piping as well as dredger swinging operation, connecting and dismantling floating pipeline and shore pipeline, hoses etc. The contractor has to make his own arrangement of a suitable Cutter Motor for the Dredger, install, commission and carry out the dredging operation using the cutter motor and take back the cutter motor after completion of the work. The dredged soil shall be pumped on the land at a dumping site to be indicated by the department.The charges for necesssary bunding and other arrangements are at the contractors cost. The lead distance of pumping is to be within 1.2Km .The length, width, depth, location and the quantity of the sand to be dredged shall be decided by the Engineer in charge as per site / weather / sea bed / dredgers conditions prevailing at the time of dredging and the same shall be adhered to by the contractor.(as per the specific terms and conditions enclosed)
Tebma Marine Pvt Ltd
BSP HYDRO DREDGING WORKS PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .