Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.9 LAccepted-AOC AT PO GOTAMARA BANARPAL ANGUL 759135 ANGUL ODISHA INDIA | ANGUL | ANGUL | ODISHA | 759135 | L1 | Accepted-AOC L1 | |
| 2 | L2₹42.2 L+₹6.3 L (17.6%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹42.3 L+₹6.4 L (17.9%)Rejected-AOC AT PO GOTAMARA P S BANARPAL ANGUL 759128 ANGUL ODISHA INDIA | ANGUL | ANGUL | ODISHA | 759128 | L3 | Rejected-AOC L3 | |
| 4 | L4₹46.4 L+₹10.5 L (29.2%)Rejected-AOC BANARPAL GOTAMARA GOTAMARA ANGUL ANGUL ODISHA 759128 UDYAM OD 01 0008043 | ANUGUL | ODISHA | 759128 | L4 | Rejected-AOC L4 | |
| 5 | L5₹48.0 L+₹12.1 L (33.7%)Rejected-AOC KULAD NALCONAGAR ANGUL 759145 ODISHA | ANGUL | ANGUL | ODISHA | 759145 | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
2 Sept 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SHRI K.L.DAS
AGM (MECH.), CONTRACT CELL, CPP, NALCO, ANGUL
CONSTRUCTION OF RCC ROAD FROM 90 DEGREE BEND TO WATCH TOWER-03
2020_NALCO_577150_1
MC-4939
Limited
Miscellaneous Services
Item Rate
240 days
CPP, NALCO, ANGUL
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹60,000
Yes
16 Feb 2021
13 Aug 2020
8 Sept 2020
13 Aug 2020
2 Sept 2020
13 Aug 2020
90 days
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared complete as per direction of Manager in charge.
Earthwork in excavation in all kinds of soil in trenches for foundation, pipes and for drainage of water/rain water etc, including dressing the sides and ramming of bottom, lift upto 1.5mtr including getting out and stacking the excavated soil and disposal of surplus excavated soil within a lead of 100 M as per direction of the manager in charge .
Preparation of subgrade by excavating earth to an average of 22.5cm depth including dressing and cambering etc including compacting of subgrade with power road roller including making good the undulations etc Transporting & disposal of surplus earth within a lead up to 100 mtr complete as per instruction of the Manager-in-charge.
Providing & lying of granite stone boulder of maximum 225mm size for boulder soling and filling the interstices with Nalco issued fly ash/bottom ash/pond ash including cutting, loading,unloading,trasporting,segregating,laying,placing with spells,preparing the surface ,watering,compacting with necessary number of passes using power road roller of 8 to 10 tonne capacity .The rates inclusive of stacking, transporting, spreading, royality, other levies and other applicable taxes etc .complete as per specification and instruction of the Manager-in-charge. (Payments shall be made on the basis of consolidated thickness of boulder soling)
Providing and laying in position Plain cement concrete of proportion 1:4:8 (1 cement : 4 coarse of sand: 8 graded stone aggregate of 40mm nominal size) excluding the cost of centering, shuttering, finishing and reinforcement as per specification, drawing and direction of EIC. (Cement free issue)
Providing and laying in position Plain cement concrete of proportion 1:3:6 (1 cement : 3 coarse of sand: 6 graded stone aggregate of 20mm nominal size) excluding the cost of centering, shuttering, finishing and reinforcement as per specification, drawing and direction of EIC. (Cement free issue)
Providing and laying in position Reinforced cement concrete of proportion 1:1.5:3 (1 cement : 1.5 coarse of sand: 3 graded stone aggregate of 20mm nominal size) excluding the cost of centering, shuttering, finishing and reinforcement as per specification, drawing and direction of EIC (Cement & steel free issue)
Centering and shuttering including strutting, bracing, propping etc., keeping the same in position during concreting and removal of the same after specified period etc. all complete and as specified and direction of MIC. For all concrete and RCC work.
Tor Steel Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete as per specification and direction of MIC. (Reinforcement shall be issued as FIM from NALCO's store)
Dismantling of RCC including supplying of all tools ad tackles, machineries, labour etc complete, Transporting & disposal of all debris etc at the designated place within the plant premises as indentified by the manager in charge all complete.
Sealing of expansion joint in the concrete road including removing the filler board if any at the joints up to specified depth, cleaning of top 25mm for the entire road width, laying in position bitumen hot sealing compound for expansion for 25mm width & 50mm depth at the joints complete including the cost of bitumen as per the instruction of manager in charge.(Bitumen will be supplied by Agency)
M/s A.C.Barah
M/s. BINAYAK CONSTRUCTION
GAJANANA CONSTRUCTION AND CO
M/s. Power Construction
ROAD & ROOF CONSTRUCTION
M/s Dinesh Enterprisers
M/s.KAMADEVI ENTERPRISERS
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .