Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
24 Jul 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CAPTAIN RAKHI RAM
FMU (MBI) NAVAL DOCKYARD MUMBAI 400001
REPAIR RATE CONTACT (RRC) FOR REPAIRS/OVERHAUL OF MARINISED ACs OF INDIAN NAVAL SHIPS
2021_NAVY_456748_1
FMU/344/RRC/MAC
Open Tender
Marine Services
Turn-key
365 days
NAVAL DOCKYARD, FMU (MBI)
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
PCDA NAVY
Exempted
9 Aug 2021
2 Jul 2021
26 Jul 2021
3 Jul 2021
24 Jul 2021
3 Jul 2021
3 Jul 2021 - 15 Jul 2021
120 days
Amount
1st YEAR
Service charges
1.5 TON AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearings
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of HPcutouts
Replacement of LP cutouts
Replacement of solenoid valve
Calibration of cutouts
Calibration of solenoid valve
Pressure testing, vaccumising & charging of Freon gas
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Replacement of charging valve
Replacement of control panel
Repair / caliberation of instrumentation gauge (analog)
Replacement of instrumentation gauge (analog)
Replacement of freon hoses (rate/ running feet)
Replacement of air filter
Replacement of seawater in-out adopter
Replacement of thermostat
Renewal of transformer of control panel
Repairs to frame
Renewal of outer shell cover
Renewal of compressor Contractor
Renewal of fan motor Contractor
Renewal of compressor overload relay
Renewal of fan overload relay
Renewal ofMCB
Renewal of control fuse base
Renewal of step down transformer
Renewal of drain tray
Renewal of Base frame
Renewal of Capilery tube (Rate per meter)
Renewal of fan scroll
Renewal of blower impeller
Renewal of rubber hose pipe (Per Meter)
Renewal of jublee clips
Installation of sea water system pipeline for new marinised ACs (MH.Cu-Ni 90-10).( Hoses and cocks would be provided by ship. Pipes and flanges to be provided by the firm) (Per feet)
2.0 TON AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearings
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of HPcutouts
Replacement of LP cutouts
Replacement of solenoid valve
Calibration of cutouts
Calibration of solenoid valve
Pressure testing, vaccumising & charging of Freon gas
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Replacement of charging valve
Replacement of control panel
Repair / caliberation of instrumentation gauge (analog)
Replacement of instrumentation gauge (analog)
Replacement of freon hoses (rate/ running feet)
Replacement of air filter
Replacement of seawater in-out adopter
Replacement of thermostat
Renewal of transformer of control panel
Repairs to frame
Renewal of outer shell cover
Renewal of compressor Contractor
Renewal of fan motor Contractor
Renewal of compressor overload relay
Renewal of fan overload relay
Renewal ofMCB
Renewal of control fuse base
Renewal of step down transformer
Renewal of drain tray
Renewal of Base frame
Renewal of Capilery tube (Rate per meter)
Renewal of fan scroll
Renewal of blower impeller
Renewal of rubber hose pipe (Per Meter)
Renewal of jublee clips
Installation of sea water system pipeline for new marinised ACs (MH.Cu-Ni 90-10).( Hoses and cocks would be provided by ship. Pipes and flanges to be provided by the firm) (Per feet)
Spares charges
1.5 TON AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearings
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of HPcutouts
Replacement of LP cutouts
Replacement of solenoid valve
Calibration of cutouts
Calibration of solenoid valve
Pressure testing, vaccumising & charging of Freon gas
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Replacement of charging valve
Replacement of control panel
Repair / caliberation of instrumentation gauge (analog)
Replacement of instrumentation gauge (analog)
Replacement of freon hoses (rate/ running feet)
Replacement of air filter
Replacement of seawater in-out adopter
Replacement of thermostat
Renewal of transformer of control panel
Repairs to frame
Renewal of outer shell cover
Renewal of compressor Contractor
Renewal of fan motor Contractor
Renewal of compressor overload relay
Renewal of fan overload relay
Renewal ofMCB
Renewal of control fuse base
Renewal of step down transformer
Renewal of drain tray
Renewal of Base frame
Renewal of Capilery tube (Rate per meter)
Renewal of fan scroll
Renewal of blower impeller
Renewal of rubber hose pipe (Per Meter)
Renewal of jublee clips
Installation of sea water system pipeline for new marinised ACs (MH.Cu-Ni 90-10).( Hoses and cocks would be provided by ship. Pipes and flanges to be provided by the firm) (Per feet)
2.0 TON AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearings
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of HPcutouts
Replacement of LP cutouts
Replacement of solenoid valve
Calibration of cutouts
Calibration of solenoid valve
Pressure testing, vaccumising & charging of Freon gas
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Replacement of charging valve
Replacement of control panel
Repair / caliberation of instrumentation gauge (analog)
Replacement of instrumentation gauge (analog)
Replacement of freon hoses (rate/ running feet)
Replacement of air filter
Replacement of seawater in-out adopter
Replacement of thermostat
Renewal of transformer of control panel
Repairs to frame
Renewal of outer shell cover
Renewal of compressor Contractor
Renewal of fan motor Contractor
Renewal of compressor overload relay
Renewal of fan overload relay
Renewal ofMCB
Renewal of control fuse base
Renewal of step down transformer
Renewal of drain tray
Renewal of Base frame
Renewal of Capilery tube (Rate per meter)
Renewal of fan scroll
Renewal of blower impeller
Renewal of rubber hose pipe (Per Meter)
Renewal of jublee clips
Installation of sea water system pipeline for new marinised ACs (MH.Cu-Ni 90-10).( Hoses and cocks would be provided by ship. Pipes and flanges to be provided by the firm) (Per feet)
2nd Year
Service charges
1.5 TON AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearings
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of HPcutouts
Replacement of LP cutouts
Replacement of solenoid valve
Calibration of cutouts
Calibration of solenoid valve
Pressure testing, vaccumising & charging of Freon gas
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Replacement of charging valve
Replacement of control panel
Repair / caliberation of instrumentation gauge (analog)
Replacement of instrumentation gauge (analog)
Replacement of freon hoses (rate/ running feet)
Replacement of air filter
Replacement of seawater in-out adopter
Replacement of thermostat
Renewal of transformer of control panel
Repairs to frame
Renewal of outer shell cover
Renewal of compressor Contractor
Renewal of fan motor Contractor
Renewal of compressor overload relay
Renewal of fan overload relay
Renewal ofMCB
Renewal of control fuse base
Renewal of step down transformer
Renewal of drain tray
Renewal of Base frame
Renewal of Capilery tube (Rate per meter)
Renewal of fan scroll
Renewal of blower impeller
Renewal of rubber hose pipe (Per Meter)
Renewal of jublee clips
Installation of sea water system pipeline for new marinised ACs (MH.Cu-Ni 90-10).( Hoses and cocks would be provided by ship. Pipes and flanges to be provided by the firm) (Per feet)
2.0 TON AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearings
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of HPcutouts
Replacement of LP cutouts
Replacement of solenoid valve
Calibration of cutouts
Calibration of solenoid valve
Pressure testing, vaccumising & charging of Freon gas
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Replacement of charging valve
Replacement of control panel
Repair / caliberation of instrumentation gauge (analog)
Replacement of instrumentation gauge (analog)
Replacement of freon hoses (rate/ running feet)
Replacement of air filter
Replacement of seawater in-out adopter
Replacement of thermostat
Renewal of transformer of control panel
Repairs to frame
Renewal of outer shell cover
Renewal of compressor Contractor
Renewal of fan motor Contractor
Renewal of compressor overload relay
Renewal of fan overload relay
Renewal ofMCB
Renewal of control fuse base
Renewal of step down transformer
Renewal of drain tray
Renewal of Base frame
Renewal of Capilery tube (Rate per meter)
Renewal of fan scroll
Renewal of blower impeller
Renewal of rubber hose pipe (Per Meter)
Renewal of jublee clips
Installation of sea water system pipeline for new marinised ACs (MH.Cu-Ni 90-10).( Hoses and cocks would be provided by ship. Pipes and flanges to be provided by the firm) (Per feet)
Spares charges
1.5 TON AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearings
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of HPcutouts
Replacement of LP cutouts
Replacement of solenoid valve
Calibration of cutouts
Calibration of solenoid valve
Pressure testing, vaccumising & charging of Freon gas
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Replacement of charging valve
Replacement of control panel
Repair / caliberation of instrumentation gauge (analog)
Replacement of instrumentation gauge (analog)
Replacement of freon hoses (rate/ running feet)
Replacement of air filter
Replacement of seawater in-out adopter
Replacement of thermostat
Renewal of transformer of control panel
Repairs to frame
Renewal of outer shell cover
Renewal of compressor Contractor
Renewal of fan motor Contractor
Renewal of compressor overload relay
Renewal of fan overload relay
Renewal ofMCB
Renewal of control fuse base
Renewal of step down transformer
Renewal of drain tray
Renewal of Base frame
Renewal of Capilery tube (Rate per meter)
Renewal of fan scroll
Renewal of blower impeller
Renewal of rubber hose pipe (Per Meter)
Renewal of jublee clips
Installation of sea water system pipeline for new marinised ACs (MH.Cu-Ni 90-10).( Hoses and cocks would be provided by ship. Pipes and flanges to be provided by the firm) (Per feet)
2.0 TON AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearings
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of HPcutouts
Replacement of LP cutouts
Replacement of solenoid valve
Calibration of cutouts
Calibration of solenoid valve
Pressure testing, vaccumising & charging of Freon gas
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Replacement of charging valve
Replacement of control panel
Repair / caliberation of instrumentation gauge (analog)
Replacement of instrumentation gauge (analog)
Replacement of freon hoses (rate/ running feet)
Replacement of air filter
Replacement of seawater in-out adopter
Replacement of thermostat
Renewal of transformer of control panel
Repairs to frame
Renewal of outer shell cover
Renewal of compressor Contractor
Renewal of fan motor Contractor
Renewal of compressor overload relay
Renewal of fan overload relay
Renewal ofMCB
Renewal of control fuse base
Renewal of step down transformer
Renewal of drain tray
Renewal of Base frame
Renewal of Capilery tube (Rate per meter)
Renewal of fan scroll
Renewal of blower impeller
Renewal of rubber hose pipe (Per Meter)
Renewal of jublee clips
Installation of sea water system pipeline for new marinised ACs (MH.Cu-Ni 90-10).( Hoses and cocks would be provided by ship. Pipes and flanges to be provided by the firm) (Per feet)
RL AIR CONDITIONING COMPANY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .