Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 CrAdmitted-Finance NO 2 GF AKSHAYRAJ APARTMENT JUBILEE CIRCLE BHUJ 370 001 | BHUJ | KACHCHH | GUJARAT | 370001 | ₹9.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.0 Cr+₹93.2 L (10.3%)Admitted-Finance | ₹10.0 Cr+₹93.2 L (10.3%) | L2 | Admitted-Finance |
| 3 | L3₹11.1 Cr+₹2.1 Cr (23.2%)Admitted-Finance SEMARJHAL TAUNS NARWAL KANPUR KANPUR NAGAR UTTAR PRADESH 209401 | KANPUR NAGAR | UTTAR PRADESH | 209401 | ₹11.1 Cr+₹2.1 Cr (23.2%) | L3 | Admitted-Finance |
| 4 | L4₹11.9 Cr+₹2.9 Cr (32.3%)Admitted-Finance C 301 SHREE BALAJI RESIDENCY BEHIND SANGATH SILVER APARTMENT SABARMATI GANDHINAGAR HIGHWAY MOTERA AHMEDABAD 380005 | AHMEDABAD | AHMEDABAD | GUJARAT | 380005 | ₹11.9 Cr+₹2.9 Cr (32.3%) | L4 | Admitted-Finance |
| 5 | L5₹12.1 Cr+₹3.1 Cr (34.2%)Admitted-Finance | ₹12.1 Cr+₹3.1 Cr (34.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Hariom Projects Pvt Ltd L4 | P K CONSTRUCTION CO. L3 | R.S CONSTRUCTIONS L5 | M/s. Ambabhai K patel L1 | PRATIK ENTERPRISES L2 | Hi Tech Transpower Pvt Ltd L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00List of Works | |||||||||
| 1.10 | Total amount of Sch 'A' part-I ( Buildings/ Structures) | 1 | LUMPSUM | 8,50,00,000 ₹8,50,00,000 | 7,67,10,000 ₹7,67,10,000 | 8,30,00,000 ₹8,30,00,000 | 6,26,17,899 ₹6,26,17,899 Lowest | 6,51,51,111 ₹6,51,51,111 | 11,02,52,592 ₹11,02,52,592 |
| 2.00 | Total amount of Sch 'A' part-II (Excavation, Earthwork, & Site Development) | 1 | LUMPSUM | 85,26,374.59 ₹85,26,374.59 | 85,00,000 ₹85,00,000 | 86,00,000 ₹86,00,000 | 55,00,000 ₹55,00,000 Lowest | 85,11,111 ₹85,11,111 | 79,18,138.68 ₹79,18,138.68 |
| 3.00 | Total amount of Sch 'A' part-III ( Retaining Wall ) | 1 | LUMPSUM | 58,25,085.68 ₹58,25,085.68 | 60,00,000 ₹60,00,000 | 69,70,000 ₹69,70,000 | 45,00,000 ₹45,00,000 Lowest | 57,21,111 ₹57,21,111 | 88,79,632.66 ₹88,79,632.66 |
| 4.00 | Total amount of Sch 'A' part-IV (Internal water supply) | 1 | LUMPSUM | 4,32,363.8 ₹4,32,363.8 | 4,50,000 ₹4,50,000 | 6,50,000 ₹6,50,000 | 4,35,000 ₹4,35,000 | 4,11,111 ₹4,11,111 Lowest | 5,97,982.11 ₹5,97,982.11 |
| 5.00 | Total amount of Sch 'A' part-V ( Internal Electric Supply) | 1 | LUMPSUM | 16,80,794.2 ₹16,80,794.2 | 18,00,000 ₹18,00,000 | 19,10,000 ₹19,10,000 | 15,00,000 ₹15,00,000 Lowest | 16,51,111 ₹16,51,111 | 45,31,667.28 ₹45,31,667.28 |
| 6.00 | Total amount of Sch 'A' part-VI ( External Water Supply) | 1 | LUMPSUM | 2,73,414.86 ₹2,73,414.86 | 4,00,000 ₹4,00,000 | 4,60,000 ₹4,60,000 | 2,75,000 ₹2,75,000 | 2,73,414 ₹2,73,414 Lowest | 4,47,059.52 ₹4,47,059.52 |
| 7.00 | Total amount of Sch 'A' part-VII (External Electric Supply ) | 1 | LUMPSUM | 6,13,038.8 ₹6,13,038.8 | 10,00,000 ₹10,00,000 | 8,50,000 ₹8,50,000 | 5,85,000 ₹5,85,000 Lowest | 6,13,038 ₹6,13,038 | 20,75,462.35 ₹20,75,462.35 |
| 8.00 | Total amount of Sch 'A' part-VIII ( Lightning Protection & Aviation Obstruction Light ) | 1 | LUMPSUM | 1,18,768.2 ₹1,18,768.2 | 2,00,000 ₹2,00,000 | 1,50,000 ₹1,50,000 | 1,25,000 ₹1,25,000 | 1,18,768 ₹1,18,768 Lowest | 9,33,002.4 ₹9,33,002.4 |
| 9.00 | Total amount of Sch 'A' part-IX (Area Drainage ) | 1 | LUMPSUM | 8,56,222.73 ₹8,56,222.73 | 9,50,000 ₹9,50,000 | 9,35,000 ₹9,35,000 | 7,00,000 ₹7,00,000 Lowest | 8,56,222 ₹8,56,222 | 11,25,972.9 ₹11,25,972.9 |
Tender Value
₹10.5 Cr
EMD Value
₹8.5 L
Closing Date
7 Aug 2026, 6:00 pmClosed
CE (NW) KOCHI
CHIEF ENGINEER NAVAL WORKS KOCHI MILITARY ENGINEER SERVICE NAVAL BASE POST KATARIBAGH KOCHI-682004
PROVISION OF DEFICIENT SINGLE LIVING ACCOMMODATION FOR SAILORS (STAFF AND TRAINEE) AT INS VALSURA, JAMNAGAR
2026_MES_766628_1
891097
Open Tender
Civil Works
Lump-sum
900 days
JAMNAGAR
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,000
GE (I) (Navy) Jamnagar
₹8.5 L
Yes
9 Sept 2026
20 May 2026
10 Aug 2026
20 May 2026
7 Aug 2026
27 Jul 2026
20 May 2026 - 11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1List of Works | |||||
| 1.1 | Total amount of Sch 'A' part-I ( Buildings/ Structures) | 1 | LUMPSUM | 6,85,00,000 | ₹6,85,00,000 |
| 2 | Total amount of Sch 'A' part-II (Excavation, Earthwork, & Site Development) | 1 | LUMPSUM | 51,67,662.21 | ₹51,67,662.21 |
| 3 | Total amount of Sch 'A' part-III ( Retaining Wall ) | 1 | LUMPSUM | 57,65,989.98 | ₹57,65,989.98 |
| 4 | Total amount of Sch 'A' part-IV (Internal water supply) | 1 | LUMPSUM | 4,32,363.8 | ₹4,32,363.8 |
| 5 | Total amount of Sch 'A' part-V ( Internal Electric Supply) | 1 | LUMPSUM | 21,27,633.72 | ₹21,27,633.72 |
| 6 | Total amount of Sch 'A' part-VI ( External Water Supply) | 1 | LUMPSUM | 3,07,314.86 | ₹3,07,314.86 |
| 7 | Total amount of Sch 'A' part-VII (External Electric Supply ) | 1 | LUMPSUM | 6,13,038.8 | ₹6,13,038.8 |
| 8 | Total amount of Sch 'A' part-VIII ( Lightning Protection & Aviation Obstruction Light ) | 1 | LUMPSUM | 1,18,768.2 | ₹1,18,768.2 |
| 9 | Total amount of Sch 'A' part-IX (Area Drainage ) | 1 | LUMPSUM | 8,56,222.73 | ₹8,56,222.73 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
PREPRICED_SCHEDULE.pdf
Tender Documents • 0.35 MB
TENDER.pdf
Tender Documents • 1.95 MB
BOQ_858579.xls
BOQ • 0.35 MB
corri_8_tenderdoc.pdf
PDF • 0.36 MB
Corri_7_dwg_merged.pdf
PDF • 0.57 MB
Rev_Drawing_merged.pdf
PDF • 8.53 MB
Prepriced_Amnd.pdf
PDF • 0.34 MB
Corri_6_tenderdoc.pdf
PDF • 0.91 MB
Corri_5_date.pdf
PDF • 0.25 MB
Corri_4_date.pdf
PDF • 0.25 MB
Corri_3_date.pdf
PDF • 0.25 MB
Corri_2.pdf
PDF • 0.25 MB
Corrigendum_1_Drawing_Merged.pdf
PDF • 11.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .