Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹7.0 L
EMD Value
₹7,000
Closing Date
26 May 2025, 2:00 pmClosed
Superintending Engineer
33/11 KV Sub Station, Hospital Chauraha, Bahraich
Fencing work against BP 2025-26 under EDD-1, Bahraich
2025_MVVNL_1032146_1
01/EDC(B)/2025-26
Open Tender
Electrical Works
Item Rate
90 days
Bahraich
Please Refer Tender Form
3 documents required · 3 mandatory
₹1,180
Superintending Engineer, EDC
₹7,000
5 Jun 2025
24 Apr 2025
26 May 2025
24 Apr 2025
26 May 2025
24 Apr 2025
Amount
Providing & Fixing of Cage fencing of 160, 250, 400, 630 & 1000 KVA Plinth mounted transformer in various area to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wire mesh) made of 10 gauge wire in suitable size angle iron frame (35X35X4 mm) of size 10'(L)x6'(W)x7'(H) by strengthening of wire mesh by 20x3 mm M.S. flat horizontally as well as vertically, Grouting the panel with 1:2:4 cement/coarse sand/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation. (Complete Fitting)
SAROJ CONSTRUCTION ELECTRICAL PRIVATE LIMITED (BID ID -5215894)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .