Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Technically NOT Acceptable |
| 4 | Rejected-Technical | Rejected-Technical Technically NOT Acceptable |
Tender Value
Refer Docs
Closing Date
17 Mar 2021, 4:00 pmClosed
GENERAL MANAGER (MATERIALS AND CONTRACTS)
Indian Oil Corporation Limited, Western Region Pipelines, P.O. Bedipara, Morbi Road, Gauridad, Distt. Rajkot-360 003 (Gujarat)
AMC for 03 no. of RO Plants Installed at Mt. Girnar Complex and Gangotri Complex at IOCL Residential Colonies, Rajkot
2021_WRRAJ_132076_1
PWRJT20061
Open Tender
Services
Works
720 days
WRPL Gauridad
Please refer Tender Documents
14 documents required · 14 mandatory
Exempted
20 May 2021
25 Feb 2021
18 Mar 2021
25 Feb 2021
17 Mar 2021
3 Mar 2021
Composite Items
Comprehensive Annual Maintenance Contract (AMC) for 03 (Three) Nos., 200 Litre/Hour (LPH) capacity RO Plants installed at IOCL residential colonies named "Mount Girnar Complex" and "Gangotri Complex" at Rajkot (Gujarat). The Contractor shall perform all the activities as per schedule, scope of work, Tender terms & conditions and directions of the Officer-in-Charge. (Unit "EA" shall mean per RO plant per quarter). (03 Nos. RO Plants X 04 Quarters per year X 02 Years = 24) The following essential services shall be carried out during the Contract period (02 years) at the prescribed frequency:- 1. Compulsory RO Membrane Change: Once at the start of the contract period & subsequent replacement of Membrane every year at NO EXTRA CHARGES inclusive of all material, transportation & manpower. (01 membrane per year X 03 RO Plants X 02 Years = 06) 2. Complete RO Cleaning including de-scaling and disinfection of RO Membrane: 06 (six) services per year (once in 02 (two) months) at NO EXTRA CHARGES inclusive of all material, transportation & manpower. (06 services per year X 03 RO Plants X 02 Years = 36) 3. Inspection of Membrane for telescoping & fouling: 01 (one) Service every 06(six) months at NO EXTRA CHARGES inclusive of all material, transportation & manpower. (02 services per year X 03 RO Plants X 02 Years = 12) 4. Regeneration 02 (Two) Regenerations per week that includes periodic back washing and rinsing of filter plants and regeneration of water softener plant at NO EXTRA CHARGES inclusive of all material, transportation & manpower (104 Regenerations per year X 03 RO Plants X 02 Years = 624) 5. Cartage Filter Changing: 01 (One) service every Month at NO EXTRA CHARGES inclusive of all material , transportation & manpower (12 Cartage filters per year X 03 RO Plants X 02 Years = 72) 6. ACF & Softener Services: 01 (One) service per year at NO EXTRA CHARGES inclusive of all material , transportation & manpower (01 service per year X 03 RO Plants X 02 Years = 06) 7. Replacement / Repairing of Parts/ Consumables / Supervision of Resin Replacement: As and when required at NO EXTRA CHARGES inclusive of all material , transportation & manpower 8. Water Report of RO Plant from any Govt. Accredited Agency: Every Six Months (02 water reports per year X 03 RO Plants X 02 Years = 12)
Sagar Technochem
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .