| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-Finance | ₹3.2 Cr | L1 | Accepted-Finance L1 bidder |
| 2 | L2₹3.3 CrRejected-Finance | ₹3.3 Cr | L2 | Rejected-Finance L2 bidder |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Rawel Singh and Company L2 | Sood And Company L1 |
|---|---|---|---|---|---|
| 1.00 | Diamond core drilling vertical hole (with 0-10 angle from vertical) of desire depth with double barrel core samplers for geological & geotechnical investigation in the project area and around the project alignment (as given below in desired mode) as per specification of NX size, having depth as per Direction of Engineer In Charge including all cost of transportation & shifting of machine, material, labour, T&P etc. complete in all respect, with a core recovery as per relevant IS I.S Specifications and boxing (Making and supplying of Steel core boxes with dummy (core loss), blocks and packing materials as per IS Specification number 4078 - 1980 with latest amendments, if any, including all cost of labor, materials, carriage and T&P complete in all respect with painting and writing, marking etc) leveling and transportation of the core etc. the above work also includes water permeability test (Double packer method) at every 1.5 to 3.00 M depth in ascending and descending order including all cost of materials, labour, T&P others equipment’s etc. complete in all respect required for performing the test including and cost of geological logging of drilled holes as per Indian standards and submission of report complete in all respect | 960 | RM | 24,300 ₹2,33,28,000 Lowest | 24,700 ₹2,37,12,000 |
| 2.00 | Rate for bore hole at Sl no 01 in angle between 10° to 30° | 100 | RM | 24,300 ₹24,30,000 Lowest | 24,700 ₹24,70,000 |
| 3.00 | Rate for leaving NX casing pipe (after drilling work is over) in loose strata as and where required | 160 | RM | 3,500 ₹5,60,000 | 2,000 ₹3,20,000 Lowest |
| 4.00 | Standard Penetration test as per I.S.: 2131 -1981. The test should be complete in all respects | 100 | Nos | 1,500 ₹1,50,000 | 1,000 ₹1,00,000 Lowest |
| 5.00 | Seismic Refraction Tomography (SRT) investigation as per IS 15681 (2006) and other relevant IS code and preparation of geological section along with proposed axis of Barrage with detailed lithology, overburden, geomorphology including submission of report with cost of all labour T&P equipment etc. required for proper completion of the work. (One Job means 800 m length of line) | 1 | Job | 12,00,000 ₹12,00,000 | 8,00,000 ₹8,00,000 Lowest |
| 6.00 | Plate Load Test and determination of Bearing capacity of soil as per relevant IS specification including preparation of report with cost of all labour T&P etc required for the test | 2 | Job | 7,00,000 ₹14,00,000 | 6,00,000 ₹12,00,000 Lowest |
| 7.00 | Permeability Test of strata as per relevant IS specification including preparation of report with cost of all labour T&P etc required for the test | 1 | Job | 25,000 ₹25,000 | 10,000 ₹10,000 Lowest |
| 8.00 | Earth resistivity Test of strata as per relevant IS specification including preparation of report with cost of all labour T&P etc required for the test | 2 | Job | 5,50,000 ₹11,00,000 | 5,00,000 ₹10,00,000 Lowest |
| 9.00 | Petrographic test and determination of silt factor as per relevant IS specification including preparation of report with cost of all labour T&P etc required for the test | 2 | Job | 25,000 ₹50,000 Lowest | 30,000 ₹60,000 |
| 10.00 | Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30moutside the periphery of the area as per Technical Specification Clause 201. (By Manual Means) | 0.45 | Hectare | 25,000 ₹11,250 Lowest | 30,000 ₹13,500 |
Tender Value
₹3.3 Cr
EMD Value
₹8.2 L
Closing Date
24 Nov 2025, 5:00 pmClosed
Executive Engineer (Civil)
O/o the Executive Engineer (Civil), UJVNL Munsiyar
Geotechinical Investigations and field/in situ test at Sela urthing HEP
2025_UJVN_88585_1
04/UJVNL/EE(C-SBR)/2025-26
Open Tender
Civil Works
Item Wise
Dharchula Pithoragarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
UJVN Limited
₹8.2 L
Yes
10 Jul 2026
3 Nov 2025
1 Dec 2025
3 Nov 2025
24 Nov 2025
10 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Diamond core drilling vertical hole (with 0-10 angle from vertical) of desire depth with double barrel core samplers for geological & geotechnical investigation in the project area and around the project alignment (as given below in desired mode) as per specification of NX size, having depth as per Direction of Engineer In Charge including all cost of transportation & shifting of machine, material, labour, T&P etc. complete in all respect, with a core recovery as per relevant IS I.S Specifications and boxing (Making and supplying of Steel core boxes with dummy (core loss), blocks and packing materials as per IS Specification number 4078 - 1980 with latest amendments, if any, including all cost of labor, materials, carriage and T&P complete in all respect with painting and writing, marking etc) leveling and transportation of the core etc. the above work also includes water permeability test (Double packer method) at every 1.5 to 3.00 M depth in ascending and descending order including all cost of materials, labour, T&P others equipment’s etc. complete in all respect required for performing the test including and cost of geological logging of drilled holes as per Indian standards and submission of report complete in all respect | - | RM | 24,750 | - |
| 2 | Rate for bore hole at Sl no 01 in angle between 10° to 30° | - | RM | 23,625 | - |
| 3 | Rate for leaving NX casing pipe (after drilling work is over) in loose strata as and where required | - | RM | 1,485 | - |
| 4 | Standard Penetration test as per I.S.: 2131 -1981. The test should be complete in all respects | - | Nos | 945 | - |
| 5 | Seismic Refraction Tomography (SRT) investigation as per IS 15681 (2006) and other relevant IS code and preparation of geological section along with proposed axis of Barrage with detailed lithology, overburden, geomorphology including submission of report with cost of all labour T&P equipment etc. required for proper completion of the work. (One Job means 800 m length of line) | - | Job | 10,57,500 | - |
| 6 | Plate Load Test and determination of Bearing capacity of soil as per relevant IS specification including preparation of report with cost of all labour T&P etc required for the test | - | Job | 6,75,000 | - |
| 7 | Permeability Test of strata as per relevant IS specification including preparation of report with cost of all labour T&P etc required for the test | - | Job | 8,100 | - |
| 8 | Earth resistivity Test of strata as per relevant IS specification including preparation of report with cost of all labour T&P etc required for the test | - | Job | 5,40,000 | - |
| 9 | Petrographic test and determination of silt factor as per relevant IS specification including preparation of report with cost of all labour T&P etc required for the test | - | Job | 40,500 | - |
| 10 | Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30moutside the periphery of the area as per Technical Specification Clause 201. (By Manual Means) | - | Hectare | 24,577 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_105093.xls
BOQ • 0.36 MB
Tender04SUF.pdf
Tender Documents • 1.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].