| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 LAccepted-AOC 231 JAGGI GARDEN BALDEV NAGAR AMBALA CITY HARYANA 134003 | AMBALA CITY | AMBALA | HARYANA | 134003 | ₹28.7 L | L1 | Accepted-AOC Being lowest and reasonable bidder |
| 2 | L2₹31.3 L+₹2.5 L (8.84%)Rejected-Finance 154 GANDHI MARKET AMBALA CANTT HARYANA 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | ₹31.3 L+₹2.5 L (8.84%) | L2 | Rejected-Finance Not lowest bidder |
| 3 | L3₹37.0 L+₹8.3 L (28.7%)Rejected-Finance | ₹37.0 L+₹8.3 L (28.7%) | L3 | Rejected-Finance Not lowest bidder |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
16 May 2022, 6:00 pmClosed
CWE AF AMBALA
HQ CWE AF Ambala Ambala Cantt PIN 133001
COMPREHENSIVE MAINT OF CENTRAL AIR CONDITIONING PLANT, ELECTRICAL INSTALLATION AND MISC REPAIRS AT TECH AREA OF SITE III UNDER GE (AF) AMBALA
2022_MES_517335_1
CWE/AF AMB/AMB-01/2022-23
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
Ambala cantt
For MES enlisted contractor Class D Category b i and c i and for un-enlisted contractor refer NIT
7 documents required · 7 mandatory
₹500
₹70,000
Yes
27 May 2022
8 Apr 2022
18 May 2022
8 Apr 2022
16 May 2022
2 May 2022
8 Apr 2022 - 18 Apr 2022
Amount
Periodical, preventive and comprehensive maintenance of 3x150TR Central Air Conditioning Plant alongwith under mentioned accessories installed at site-III under GE AF Ambala as per manufacturer's manual of preventive and comprehensive maintenance with periodicity(monthly) mentioned therein and as per particular specifications detailed here-in-after complete all as specified & directed:- (a) Package chiller units each consisting of 3 x 150 semi-hermetic/open type compressor along with motor and its condenser, flooded chiller, microprocessor based control panel system - 03 Nos. (b) Preventive, comprehensive & routine maintenance of the following equipments:- (i) Condensing pump sets along with motors of 600 USGPM - 03 Nos. (ii) Chiller pump sets alongwith motors of 400 UPGPM - 03 Nos. (iii) Pumping set for hot water circulation 25 HP - 02 Nos. (iv) FRP cooling towers complete with motor, fan, gear box - 03 Nos. (v) Condenser water pipe lines and its control valves - 01 Lot. (vi) Chiller water pipe lines and its control valves - 01 Lot. (vii) Expansion tanks including their insulation for chilled water and hot water system - 02 Nos.
(viii) Electrical operated hot water generator of capcity 60 KW with automatic and safety controls such as safety valve, purge valve, high limit cut out, automatic and manual reset, low level cut out stop controller, thermostat, heaters including its control panel - 04 Nos. (ix) Descaling of 150 TR condensing units of the condenser by recommended chemical, Cleaning agent by soaking methods disconnecting of condenser from system by taking out nut, bolts studs, 2 valves and MS/GI pipe line from both side cover, cleaning with nylon brush to each tubes for the AC plants. Notes:- (i) The maintenance shall be done through OEM i.e. Blue Star Ltd or Voltas or Daikin. (ii) The Contractor shall submit a Memorundam of Understanding (MoU) on stamp paper duly notarized, as per performa specified hereinafter alongwith a copy of Annual Maintenance Contract from OEM within 10 days from the date of acceptance, failing which the contract will be liable to be cancelled and work shall be got executed at the risk & cost of the Contractor. (iii) The Contractor shall carry out all major and minor break down/repairs pertaining to machineries of central AC Plant & connected cooling tower and RO plant installed for pure water supply after filtration through passing plant and fire hydrant system complete with Jocky pump, LT panel, Starter of motor and connected items & AHUs.
(iv) The contractor shall maintain indoor design condition as dry bulb 23 degree celsius plus/minus 2 degree, if the above said temperature and relative humidity as specified is not achieved a penalty of Rs 5000/- per hour shall be imposed on the contractor from the dues as and when becomes due. (v) In case of breakdown, it is contractor's responsibility to attend the breakdown immediately without any extra cost. (vi) Taking down/out of old spare parts and fixing only of new spare parts (unless otherwise specified here-in-after) deemed to be included in quoted rates, however the new spare parts shall be measured & paid seperately as supply only under respective items here-in-after. (vii) The maintenance shall run for entire period of contract from the date of commencement and during this period the smooth funcitoning of plant is responsibility of contractor. (viii) The Contractor will arrange OEM visit quarterly for inspection and to check functionality of the plants including maintenance services as required and shall provide satisfaction certificate of smooth functioning of plant (ix) The rates quoted shall be deemed to be inclusive of the all above aspects.
Servicing / overhauling of Hot Water Genrator system 60KW capacity (installed at Site-III ) by taking out and removing unserviceable/defective parts/spares, cleaning, servicing, de-scaling water jackets, refixing the serviceable parts in position after proper cleaning testing complete all as specified & directed
Dismantling the rusted body of AHU of 8000CFM / 10000CFM capacity, blower motor, blower shaft, and other spares from AHU for repairing/ over-hauling the body of AHU by replacement of defective components to ensure the proper functioning of the AHU, reassembling after necessary repairs, connecting, and testing complete all as specified & directed.
Dismantling the rusted body of AHU of 1200CFM capacity, blower motor, blower shaft, and other spares from AHU for repairing/ over-hauling the body of AHU by replacement of defective components to ensure the proper functioning of the AHU, reassembling after necessary repairs, connecting, and testing complete all as specified & directed. Notes for BOQ item No. 2.00 to 4.00: (i) The Hot water generator system and AHU(s) shall be got repaired / overhauled from specialized firm or agency as approved by the GE. (ii) Taking down/out of old spare parts and fixing only of new spare parts (unless otherwise specified here-in-after) deemed to be included in quoted rates, however the new spare parts shall be measured & paid seperately as supply only under respective items here-in-after.
Supply & charging Refrigerent R-134a gas (MEFRON / REFRON / FLORON ) in plant (Central AC plant Screw type compressor of capacity 150 TR at site-III) after detection / rectification of any leakages in the system by using CO2 gas and flushing the complete system thoroughly with nitrogen gas including pressure test complete all as specified & directed. Notes :-. (i) Gas shall be brought by the contractor at site from authorised dealer/ manufacturer company in sealed cylinder of standard packing with test certificate and purchase vouchers and charging of gas shall be done through OEM only. (ii) Re-filling/charging shall be done in the presence of Engr-in-charge. (iii) The empty cylinder after use shall be returned to the contractor. (iv) Only gas used/filled shall be considered for payment purposes. (v) While filling/charging, if any leakage of gas noticed/occured, payment for that qty shall not be accounted for. (vi) The unit rate quoted is includes leakage test to pressure test.
Supply & filling Compressor oil including drain out existing oil, non freezing of grade CPI 120 WC in AC plant including vaccum testing complete all as specified & directed. Note :- (i) Compressor oil shall be brought by the contractor in sealed canes from the authorised dealer alongwith the test certificate with purchase Vouchers. (ii) Replacement of compressor oil will be carried out in presence of Engineer-in-charge. (iii) Only qty of filled oil accounted as per compressor capacity shall be considered for payment purposes. (iv) While filling , if any leakage/wastage of oil noticed/occured, payment for that qty shall not be accounted for.
Supply only of spare part (BOQ item No. 7.01 to 7.51 here-in-after) for AC plant & other installations as specified here-in-before Note:- (i) Cost of labour element in respect of taking down and fixing of spare part has already been included in items here-in-before. (ii) The items covered here-in-after are provisional and shall be executed only if required during overhauling / repair / Servicing of AC plant.
Supply only copper heating element , 3 phase, rating-20 KW, 60cm long alongwith 10mm, 6 hole flanged including insulation material/gasket, nuts, bolts & washer for hot water generator complete all as specified & directed.
Supply only UPS 1000 VA capacity suitable for online switching and operation with battery backup for 30 minutes comprising of SMF batteries complete all as specified & directed.
Supply only UPS 600 VA capacity suitable for online switching and operation with battery backup for 30 minutes comprising of SMF batteries complete all as specified & directed.
Supply only Temperature and Relative humidity sensors suitable for duct Sensor (Temperature Range: -40°C to 70°C, output: DC 0 to 10Volt and Humidity: DC 0 to 10Volt) by instrukart duct mounting complete all as specified & directed. Make: Catpart No. QFM2120 of Siemens or equivalent in Voltas or Daikin
Supply only Temperature sensors suitable for Chiller line (Temperature Range: -40°C to 70°C, output: DC 0 to 10Volt ) by instrukart in chiller line complete all as specified & directed. Make: Catpart No. QAE2120 of Siemens or equivalent in Voltas or Daikin
Supply only 3 way solenoid valve 25mm bore with actuator for operating at 0-10 Volt DC supply for hot water alongwith thermostate control complete all as specified & directed. Make: AIP / Advance / Siemens / Suzlon / Danfoss
Description all as per BOQ item No. 7.06 here-in-before but 3 way solenoid valve 40 mm bore.
Supply only 3 way motorised valves 50mm bore with actuator for operating at 0-10 Volt DC supply for chilled water alongwith thermostate control complete all as specified & directed.
Description all as per BOQ item No. 7.08 here-in-before but 3 way motorised valve 65 mm bore.
Supply only 25mm bore ball valves, gun metal, without strainer, PN1.6 Rating, for hot water system complete all as specified & directed.
Supply only 200mm dia butterfly valve, lever operated (along with its lever ), stainless steel disc type, nitrile/EPDM rubber lining, PN 1.6, including flange/rubber packing with adequate size nut and bolt (number of hole 12 or as per sample) complete all as specified & directed.
Description all as per BOQ item No. 7.11 here-in-before but 150mm dia butterfly valve.
Description all as per BOQ item No. 7.11 here-in-before but 100mm dia butterfly valve.
Description all as per BOQ item No. 7.11 here-in-before but 65mm dia butterfly valve.
Description all as per BOQ item No. 7.11 here-in-before but 50mm dia butterfly valve.
Description all as per BOQ item No. 7.11 here-in-before but 40mm dia butterfly valve.
Supply only water pressure gauge 100mm dia range 0-100 LBS/Square inches complete all as specified & directed.
Supply only suction pressure gauge suitable for range (-) 30 to 150 LBS/Square inches complete all as specified & directed.
Supply only discharge pressure gauge suitable for range 0-300 LBS/Square inches complete all as specified & directed.
Supply only Tempreture gauge suitable for range 0-300 degree centigrate Bi-Metal Strip type with Accuracy: ± 2.0% FSD, Enclosure Protection: IP-65 type complete all as specified & directed.
Supply only pressure transmitter range (-) 01 to 12 bar, output 10 to 90% , supply 4.75 Volt DC complete all as specified & directed..
Supply only pressure transmitter range upto 25 bar, output 4 to 20mA, supply 9 to 28 Volt DC complete all as specified & directed.
Supply only new expension valve, ET 1000 of 150 TR AC Plant, compatible for AC Plant complete all as specified & directed.
Supply only contactor with ampere range 175 amp, 415 volts, 50 Hz mechanical endurance, basic unit, minimum 10 million operating cycles, 3 pole AC, model No 3TF51 all as per sample approved and complete all as specified & directed.
Supply only contactor with ampere range 100 amp, 415 volts, 50 Hz mechanical endurance, basic unit, minimum 10 million operating cycles, 3 pole AC, model No 3TF49 all as per sample approved and complete all as specified & directed.
Supply only contactor MNO 22E (2NO+2NC) 230 Volt complete all as specified & directed.
Supply only MNX 9 Auxilary contactor complete all as specified & directed.
Supply only 18A MNX contactor 230 Volt (2NO+2NC) complete all as specified & directed.
Supply only 25A MNX contactor 230 Volt (2NO+2NC) complete all as specified & directed.
Supply only 32A MNX contactor 230 Volt (2NO+2NC) complete all as specified & directed.
Supply only Timer ETR 550, 220 Volt complete all as specified & directed.
Supply only over load relay 25-50 Amp, MAX complete all as specified & directed.
Supply only Over load relay MN 14-23 Amp complete all as specified & directed.
Supply only relay MNX A2, (1NO+1NC) complete all as specified & directed.
Supply only relay MNX A1, (2NO+2NC) complete all as specified & directed.
Supply only relay MY2NJ, 5 Amp, 150VAC, 8 pin complete all as specified & directed.
Supply only relay MK2P-N, 8 pin, 250 VAC/24VD,10 Amp res, 250VAC/7A complete all as specified & directed.
Supply only Power Contactors CL25, 3 Pole AC Control 45Amp complete all as specified & directed.
Supply only V belt of size A-24 complete all as specified & directed.
Supply only V belt of size B-25 complete all as specified & directed.
Supply only V belt of size B-103 complete all as specified & directed.
Supply only V belt of size B-82 complete all as specified & directed.
Supply only 3/8" bore brass ball valve on & off, ISO 9001 certified & tested, without strainer, PN 4.0 rating alongwith gas welding as reqd, suitable size nuts, bolts & washers and making necessary connections complete all as specified & directed.
Supply only AHU water flow switch model WFS 6000 for 150 PSI, 100 degree centigrate, 15Amp, 250 Volt, alongwith its paddle of existing material including provn of making hole in the pipe etc as per sample complete all as specified & directed.
Supply only Loading/unloading relay for 150 TR compressor, SMG-1, CY,12Watt, 24 Volts, 25/60 Hz complete all as specified & directed.
Supply only Aluminium fan blade for Cooling tower of Size 24" to 30" required as per existing size and model complete all as specified & directed.
Supply only Honeycomb PVC Fills Fins as per existing model 600mm x 300mm x 150mm in size complete all as specified & directed
Supply only MPCB SUPERNOVA MOG-H1-0400, 2.5 - 4 Amp, Short Circuit Range 32.5Amp, Breaking Capacity (Icu) 100kA, 50/60 Hz all as per sample approved complete all as specified & directed
Supply only relay over and under voltage relay MV12, auxillary supply 24-110Volt, AC/DC +/-15%, 59 O/V complete all as specified & directed.
Supply only coin cell battery size BR2032, output voltage 3 Volts, capacity 200mAh complete all as specified and as directed.
Supply only Pencil Cell/Dry Cell AAA Batteries (Pack of 10 Nos.)
Miscelleneous items for repair / overhauling of AC plant & Misc items (BOQ item 8.00 to 34.00 here-in-after): M&L spray painting the condensers, chillers, compresors, Induction motors, C channels, All pipe lines, Valves and outer body of cooling towers and AHU's of 3 x 150 TR capacity plant by removing peeled old paint with scrapper and applying two coats of synthetic enamel paint of 1st quality, any tint with different colour code system and writing SM No/ MES No as exists with black enamelled paint complete all as specified & directed.
S&F in replacement nozzle of existing size for cooling tower of capacity 150 TR complete all as specified & directed.
S&F in replacement top protector cover to the CT fan motor at the iron top of the cooling tower made out of GI sheet 20 SWG, concial shape with and including flat iron clamps of required size to protect the CT fan motor form rain water complete all as specified & directed.
S&F in replacement metallic viscos filter made out of GI wire mesh interspaced with two crimp layers with three flat layers and housed in 2" deep metal frame, filteration 10 micron, efficiency 90 %, as per existing size and pattern complete all as specified & directed.
S&F in replacement air grills made out of GI sheet as per existing size and pattern with necessary nuts, bolts, clamps and MS frame made out of angle iron, damper for opening and closing of grills complete all as specified & directed.
S&F in replacement insulation for the pipe line with 13mm thickness closed cell chemically cross linked fire retardant polythylene foam, W3CF2 of density 30 Kg per Cum fixed with rubber based adhesive, covered with aluminum foil on 200-250mm dia pipe complete all as specified & directed.
S&F in replacement pre-filter 10 micron made out of GI wire mesh interspaced with two crimp layers, three flat layers flanged/ 2" deep box type and efficiency 90% for the all three AC Plant air handling unit complete all as specified & directed.
S&F in replacement underdeck insulation with 19mm thick Aluminum foil faced Nitreile rubber/ Aluminium foil faced ZLPE material complete all as specified & directed.
S&F in replacement gun metal gate valve with iron wheel head screwed both ends, for iron pipe 25 mm bore complete all as specified & directed.
S&F in replacement gun metal gate valve with iron wheel head screwed both ends, for iron pipe 40 mm bore complete all as specified & directed.
S&F in replacement gun metal gate valve with iron wheel head screwed both ends, for iron pipe 50 mm bore complete all as specified & directed.
S&F in replacement 50 mm bore Non return valve, heavy duty, PN 1.6, flanged end both ends for GI/cast iron pipes including gasket complete all as specified & directed.
S&F in replacement 150 mm bore Non return valve, heavy duty, PN 1.6, flanged end both ends for GI/cast iron pipes including gasket complete all as specified & directed.
S&F in replacement Y strainer 150mm bore, heavy duty PN 1.6, flanged end both ends for GI/cast iron pipes including gasketcomplete all as specified & directed
S&F in replacement 150mm bore Sluice Valve, heavy duty, PN 1.6 with iron wheel head jointing, flanged end both ends for GI/cast iron pipes including gasket complete all as specified & directed
M&L in replacement 65 mm bore MS Pipe, heavy grade, ISI marked, with all fittings laid in floors or fixed to walls complete all as specified & directed .
M&L in replacement 100 mm bore MS Pipe, heavy grade, ISI marked, with all fittings laid in floors or fixed to walls complete all as specified & directed .
M&L in replacement 50 mm bore GI Pipe, heavy duty, ISI marked, with all fittings laid in floors or fixed to walls complete all as specified & directed .
S&F in replacement self priming monoset pump KW/HP 2.23/3.0, 415 volt, speed 3000 RPM, connection star, Insulation class B , phase 3, suction & discharge 50mm, head 15mtr, discharge 2.5 LPS complete all as specified & directed.
Disconnecting from mains & taking out existing unserviceable outer unit of Split type Air Conditioner capacity 1.5 tonne of any make any type from any location and Supply, Installation & testing of company made Outer Unit including cleaning and removing dust/dirt from the Inner Unit with necessary modification (capilary tube etc.) & Charging of Gas F-22/R-134A and commisioning of both inner & outer unit to entire satisfaction of Engineer-in-charge complete all as specified & directed.
Disconnecting from mains & taking out existing unserviceable inner unit of Split type Air Conditioner capacity 1.5 tonne of any make any type from any location and Supply, Installation & testing of company made Inner Unit including cleaning and removing dust/dirt from the Outer Unit with necessary modification (capilary tube etc.) & Charging of Gas F-22/R-134A and commisioning of both inner & outer unit to entire satisfaction of Engineer-in-charge complete all as specified & directed. Note for BOQ item No. 27.00 & 28.00:- (i) The supply & charging of Gas is included in quoted rates. (ii) The contractor shall obtain one year guarantee certificate from the manufacturer's and shall submit to Engineer-in-charge in respect of new outer unit as well as new inner unit.
S&F in replacement LED flood light 70Watt with high power discreet LED, PDC housing and integral driver with IP 65 protection galaxy-I type with all accessories pre-wired and connecting with twin core twisted flexible copper conductor cable with suitable size rod complete all as specified & directed.
S&F FRP Cooling Tower deck of size 8 feet x 8 feet, made of fiberglass Reinforced Polyester material with provision of fixing arrengement of cooling tower fan moter vertically alongwith blade, including taking down existing Cooling Tower deck complete all as specified & directed. Note:- All minor part i.e nut/bolts, adesive material, gasket are deemed included in quoted rates. Repair of any damage in adjacent cooling tower during taking down or fixing of this item is also deemed to be included in quoted rates.
S&F in replacement RRL Hose Pipe with SS Coupling Type A, 15 mtr in size comply IS:636 complete all as specified & directed.
S&F in replacement Hose box made of 18 gauge MS Sheet 800mm X 600mm X 250mm with double door with 4 mm thick glasses and door frame made of 16 gauge MS sheet painted fire red outside and brilliant white inside yard comply IS:636 complete all as specified & directed.
S&F in replacement Fire brigade inlet connection 4 WAY Type with gun metel body, Working Pressure 15 bars, Test Pressure 22.5 bar, Hydraulic Tested to 21 Kgf/sqcm complete all as specified & directed.
S&F in replacement flame proof light (FLP-WP) groups IIA & IIB, IS 2206 (Part II)/1976, 240Volt with LED 2x16Watt pre-wired with all connected accessories complete all as specified & directed.
M&L servicing of silent DG sets 500 KVA at site in any location / position, decoupling the engine from alternator, cleaning of diesel tank internally thoroughly with water and air pressure, removing the sludge from the tank, opening of oil chamber cover, draining out used engine oil, cleaning the chamber throughly internally and refixing the chamber cover, taking off and replacing worn out / unserviceable parts, replacing worn out thimbles, bolts, washers, 'O' rings, etc. and making DG set functional including all testing on full load, etc. complete all as specified & directed. Notes: (i) Minor spares parts such as thimbles, bolts, washers, 'O' rings, etc. shall be deemed to be included in the quoted rates. (ii) Cost of labour element in respect of taking down of old spare parts & fixing of new spare parts are included in quoted rates. (iii) New spare parts, Engine oil & Coolant shall be measured & paid seperately as supply only (BOQ item No. 35.01 to 35.07 here-in-after). (iv) Labour element of filling/charging of engine oil & coolant are deemed to included in quoted rates.
Supply only fuel filter complete all as specified & directed.
Supply only lubricant oil filter complete all as specified & directed.
Supply only bypass filter complete all as specified & directed.
Supply only Air filter set complete all as specified & directed.
Supply only Engine oil (20 W 40) complete all as specified & directed.
Supply only Coolant complete all as specified & directed.
Supply only heavy duty brass battery terminal for battery 80/180 AH 12 Volts including nuts, bolts & washers complete all as specified & directed.
S&F in replacement Battery cable 35 Sqmm multi stranded copper conductor including complete all as specified & directed.
Taking down/out radiator assembly of DG set of capacity upto 500 KVA from engine mounting by opening water hose, nuts & bolts, cleaning of radiator inside and out side with anti rust solution, checking the radiator by filling water, repairing any leakage by brazing the radiator to ensure for no leakage, refixing the radiator at place including water hoses and other connected accessories after testing complete all as specified & directed.
Taking down/out self starter 12 Volts from DG set of capacity upto 500 KVA for servicing, replacing carbon brushes, benteak, bearing, contact blades etc and refixing after servicing and replacement of other parts complete all as specified & directed.
S&F in replacement self starter bearing of DG set of capacity upto 500 KVA suitable for 12/24 volts starter complete all as specified and as directed.
S&F in replacement maintenace free generator starting system with SMPS charger suitable for 24Volt, 32AH complete all as specified & directed. Make: Ultra Plus Model No AX1013235 of Cummins or equivalent in Kirloskar or Exide
S&F in replacement MCCB 200 Amp, 25 kA, three pole and protection short circuit & overload with adjustable thermal & magnetic setting complete all as specified & directed.
S&F in replacement MCCB 250 Amp, 36 kA, three pole and protection short circuit & overload with adjustable thermal & magnetic setting complete all as specified & directed.
S&F in replacement MCCB 400 Amp, 36 kA, three pole and protection short circuit & overload with adjustable thermal & magnetic setting complete all as specified & directed.
S&F in replacement VTPN sheet metal enclosures for special purpose distribution board, 415 Volts, Triple pole and neutral, 12 way, Double door with 200 Amps rated busbar & 63 Amps Four pole 16KA MCCB - 01 No as incomer and MCBs as outgoing as required including making good the disturbed surfaces also matching the exisiting surfaces complete all as specified & directed. Make :- Havells/Indo Asian/Standard Note :- (i) MCCB rate shall deemed to be included in quoted rates.
S&F in replacement Metal clad socket outlet with Triple pole and earth, encolsure with a three pin & earth plug with socket & including one triple pole 20 Amp MCB complete all as specified & directed.
S&F in replacement MCB triple pole, 25 to 63 Amp, 440Volt, 10kA complete all as specified & directed
S&F in replacement MCB triple pole & neutral, 63 Amp, 440Volt, 10kA complete all as specified & directed
S&F in replacement Voltmeter digital type suitable for 0-500 volts complete all as specified & directed,
S&F in replacement Ampere meter digital type suitable for 0-200 Amps complete all as specified & directed,
S&F in replacement Indicator bulbs Red, Blue and Yellow(set of three) complete all as specified & directed,
S&F in replacement ON/ OFF switch to start & stop the motors (set of two) complete all as specified & directed.
Dismantling the 3 Phase Induction motor, 2 HP from the present situation after disconnection of pump and / or other connected items and carry it to the authorised workshop for the following repair/replacement complete all as specified & directed:- (a) Replacement of both the bearing of existing size and type - 01 Job (b) Replacement of cooling fan of existing size and type -01 (c) Removing rotor, taking out burnt copper winding from the stator and re- winding it with super enamelled copper conductor winding wire of same gauge, weight, insulating varnishing, baking, keeping its pole and sequence same - 01 Job (d) Re-metalling the shaft made out of HCS - 01 No (e) Repacement of carbon brushes of existing thickness, length & specification. (f) Repacement of slip rings with its end shield. (g) Cleaning & greasing and re-assembling the stator, rotor along with its other components, rubber gasket and transporting the same, fixing and testing at site.
S&F Pump motor coupling for 20 HP pump motor, SW/RRS 110 coupling set aluminium body alongwith its rubber gas kit/packing SW 110 all as per sample approved complete all as specified & directed.
Dismantling the 3 Phase Induction motor, 10HP to 20HP from the present situation after disconnection of pump and / or other connected items and carry it to the authorised workshop for the following repair/replacement complete all as specified & directed:- (a) Replacement of both the bearing of existing size and type - 01 Job (b) Replacement of cooling fan of existing size and type -01 (c) Removing rotor, taking out burnt copper winding from the stator and re- winding it with super enamelled copper conductor winding wire of same gauge, weight, insulating varnishing, baking, keeping its pole and sequence same - 01 Job (d) Re-metalling the shaft made out of HCS - 01 No (e) Repacement of carbon brushes of existing thickness, length & specification. (f) Repacement of slip rings with its end shield. (g) Cleaning & greasing and re-assembling the stator, rotor along with its other components, rubber gasket and transporting the same, fixing and testing at site.
Dismantling & disconnecting 20 HP/15 KW centrifugal pump set from the electric motor and re-assembling the pump on existing foundation and complete with motor after repair / overhauling with following and testing complete all as specified & directed :- (a) fixing of new bearing of existing metal and size - 02 Nos. (b) Re-metalling the pump shaft made out of HCS - 01 No. (c) fabrication and replacement of sleeve nut as per existing -01 Nos. (d) fabrication & replacement of gun metal shaft sleeves as per sample - 01 No (e) Fabrication and replacement of neck ring/impeller wear ring made out of gun metal (as per sample) - 02 Nos. (f) repair and replacement of seal gland cup made out of gun metal (as per sample) along with mechanical seal. (g) cleaning, greasing & re-assembling all its parts duly completed in all respect along with rubber gaskit complete and transporting the same and fixing & testing at site complete all as specified & directed.
S&F in replacement Current transformer copper wound, 230 Volt, AC and 24 Volt/80 VA for DDS panels complete all as specified & directed.
S&F in replacement low voltage HRC fuse 315 Amp, 50 Hz, protection against short circuit and overloded condition, compact design complete all as specified & directed.
Servicing of ACB microprocessor type and range between 800 Amp to 1600Amp, 415Volt, 50Hz, 50 KA, category 'B' and electrical panel including replacing minor parts like springs, levers, terminals, packing etc and re-connecting, calibrating and testing complete to match with the present system comprising of the following complete all as specified & directed:- (i) Cleaning of breaker with CRC-226 , part of service /maintenance kit. (ii) Removal of old grease and re-greasing the same with recommended grease. (iii) Checking condition of arcing contact and gap between fixed and moving arcing contacts (iv) Checking the reset mechanism, tripping of breaker through push button. (v) Checking tripping of ACB through protection release. (vi) Tripping of ACB manually through volt metric release.. (vii) Checking and adjust freeness of DN and volt metric release trip rod. (viii) Checking presence and proper tightening of hardware. (ix) Checking presence of all clips. (x) Checking condition and alignment of jaw contact with cradle terminals. (xi) Checking condition of ACB wiring. (xii) Checking and adjusting gap between hylum sheet and side plate. (xiii) Checking proper closing of all poles together. (xiv) Checking working of anti pumping device of EDO ACB. (xv) Checking alignment of SIC and it’s operation. (xvi) Checking scrapping earth alignment.
(xvii) Checking condition of arc chutes. (xviii) Checking ACB tripping through shunt release. (xix) Checking motor operation in case of EDO ACB. (xx) Checking closing coil operation of EDO ACB. (xxi) Checking continuity and proper changeover of aux contact block. (xxii) Checking of release by secondary injection for O/L, S/C, E/F. (xxiii) Setting of release as per the load. (xxiv) Checking the healthiness of C.T’s. (xxv) Checking U/V release pick up and drop off. Notes: (i) Minor spares parts shall be deemed to be included in the quoted rates. (ii) Cost of labour element in respect of taking down of old spare parts & fixing of new spare parts are included in quoted rates. (iii) Spare parts shall be measured & paid separately as supply only (BOQ item No. 59.02 to 59.09 here-in-after).
Supply only Closing Coil for C-Power ACB 220Volt, capacity 800 to 1600 amp all as per the existing at site & directed.
Supply only Under Voltage Release ACB 220Volt, capacity 800 to 1600 amp all as per the existing at site & directed.
Supply only Auxilary Contact Block 6NO+6NC, capacity 800 to 1600 amp all as per the existing at site & directed.
Supply only Charging spring for 800-1600Amp, capacity 800 to 1600 amp all as per the existing at site & directed.
Supply only Jaws Contacts 800-1600Amp, capacity 800 to 1600 amp all as per the existing at site & directed.
Supply only Cradle terminals 800-1600Amp, capacity 800 to 1600 amp all as per the existing at site & directed.
Supply only Fixed Arcing Contacts 800-1600Amp, capacity 800 to 1600 amp all as per the existing at site & directed.
Supply only Moving Arcing Contacts 800-1600Amp, capacity 800 to 1600 amp all as per the existing at site & directed.
Cleaning & utility servicing of HT Vacuum Circuit Breaker (VCB), 11KV, outdoor/indoor type, 400/630Amp, 3 phase, checking of each moving parts, spring charging system, triping system, indication system, metering system, remote operation, closing & trip coil assembly and proper oiling, greasing and proper adjustment of trip bars, closing bar including testings complete all as specified & directed comprising of the following:- (i) ON/OFF testing in local and remote position (ii) Spring charge system (iii) Tripping test in overload and earth fault position by external current injecting Kit on both primary & secondary sides (iv) Meggar testing between phase to phase and phase to earth in ON/OFF position both Notes: All the test reports shall be submitted by the contractor to Engineer-in-Charge.
Supply, fixing, connecting and testing spring charging motor (universal motor) for 11 KV, VCB, operated on 230/24 volt AC/DC with charging time less than 15 Sec after taking down/out motor as existing at site complete all as specified & directed.
S&F in replacement shunt trip coil assembly suitable for HT, VCB, operating on 24/110Volt system and testing complete all as specified & directed.
S&F in replacement Closing coil assembly suitable for HT, VCB, operating on 24/110Volt system and testing complete all as specified & directed.
S&F in replacement under voltage coil assembly suitable for HT, VCB, operating on 24/110Volt system and testing complete all as specified & directed.
S&F in replacement electric hooter suitable for VCB complete all as specified & directed.
S&F in replacement Insulating sleeves of HT VCB of capacity 630 Amp 11 KV resin cast insulator complete all as specified & directed.
S&F in replacement vaccum interpetor set (stud/non stud type) (set of 3) for 11 KV, VCB, as per existing size and type complete all as specified & directed.
S&F in replacement insulator for 11 KV, VCB (horizontol/vertial type) for spacing/insulating between earth & phase (set of 06) all as per existing size and type complete all as specified & directed.
S&F Busbar Copper type (for HT VCB) 3 phase 800 amps including making all necessary electrical connection, drilling, nut and bolt all as per existing patern, size & complete including dismantling of old unserviceable busbar complete all as specified & directed.
Supply, installation & commissioning in replacement Current Transofmer 11 KV rated voltage and the CT ratio 100/05 Amp, 3 Phase, 50 Hz, INSULATION LEVEL V.F as per the existing CT , SHORT TIME CURRENT (STC RATING) 13.1KA for 1 Sec, CT TYPE OIL FILLED, duly connecting up complete to the metering protection system of HT VCB 11 KV complete all as specified & directed
S&F in replacement VCB SPOUT for 11 KV, VCB (horizontol/vertial type) for spacing/insulating between earth and phase (set of 06) including copper busbar all as per existing size and type complete all as specified & directed
S&F in replacement power capacitor bank, power quality heavy duty 25kVAR, 440Volt, 50Hz, double di-electric capacitor, with rated current 32.8Amp, required phase discharge device with resistance appropriate insulation level and rated current including suitable sized copper conductor cable, thimbles, diode and testing on fixing and connecting up complete all as specified & directed
S&F in replacement synthetic insulating mat 2mtr x 1mtr, 25mm thick for HT 11000 Volt mat as existing at site complete all as specified & directed.
Supply and filling bentonite base earthing enhancement back fill compound in the earthing pit complete all as specified & directed. Note :- Earthing compound should comply with the latest Indian standard
Supply and filling graphite base earthing enhancement back fill compound in the earthing pit complete all as specified & directed. Note :- Earthing compound should comply with the latest Indian standard.
Desludging/desilting of semi underground water reservoir of 50000 gallons capacity, removing and depositing the sludge to a distance not exceeding 500 mtr , cleaning walls by wire brush, disinfecting the reservior with approved chemical solution using at the rate of 0.20 Kg per sqm for making surface bacteria free , finally cleaning with fresh water including painting for MS plates, manhole covers, suction pipe, rungs etc with two coats of anti-corresive paint and writing outside the tank as 'tank cleaned on date with capacity of tank on black painted surface including removing all dirt outside MD land complete all as specified & directed..
Potable water chemical analysis testing of water conducted by laboratories authosied by NABL, PPCB & CPCB, tests will analysis pH, colour, odour, taste, turbidity, total hardness, total alkalinity, Iron, chloride, residual free chlorine, fluroide, total dissolved solid, sulphate, nitrate, total coliform, E-coli etc including collecting of water in front of MES rep from the source, in a specilised glass botte used for this purpose and collecting & depositing the reports from the lab complete all as specified & directed..
Excavation in trenches not exceeding 1.5mtr wide and exceeding 1.5mtr but not exceeding 3.0mtr in depth for foundation etc or for walls, shafts, manholes, poles not exceeding 10 sqm on plan or for laying pipes/cables etc and getting out, in soft/loose soil complete all as specified & directed.
Returning filling in including spreading leveling watering and well ramming in layers not exceeding 25 cm thick each in soft/loose soil complete all as specified & directed.
Removal of excavated soil to a distance not exceeding 50 mtr & depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified & directed.
M&L Sand cushioning with fine dry sand to cable with a layer of sand 8 cm thick before laying the cable and 15 cm thick after laying the cable (punned down to 18 cm thick after laying and stretching of cable) complete all as specified & directed.
Supply and laying in replacement old size, common burnt clay, sub class 'B' bricks, designation 75, laid flat & dry for protection of cable in trenches, adjacent to each other, perpendicular to central axis of cable complete all as specified and directed.
Supply, laying, jointing, testing and commissioning in replacement HT XLPE cable (heavy duty), 11000 volts (earthed), cross sectional area 95 Sqmm, 3 core, insulated, screened, sound compacted aluminium conductor, screening with extruded semi conducting layers, insulation screening with copper tape covers laid up with PVC (ST-2), extruded inner sheathed GI strip armoured PVC (ST-2) out sheathed, ISI marked with IS-7098 Part II with amendment, laid in trenches /pipes /ducts /along poles/ walls/ equipment etc complete all as specified & directed. Notes:Excavation & earth work, sand cushioning, end termination joints, protection pipes & protection covers shall be measured and paid separately.
M&L finding cable fault with electronic fault detector in LT/HT UG cable of size 25 to 300 sqmm, 3.5/4/3 core after taking out faulty cable from both end, put the cable on test including excavation & earth work complete all as specified & directed. Note :- Cost of Electricity supplied to the cable fault machine shall be deemed to included in the quoted rates.
M&L in replacement cable jointing kit for 11 KV (Earthed) grade cable for straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 95 sqmm complete all as specified & directed.
M&L in repalcement cable jointing kit for 11 KV (Earthed) grade cable for outdoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 95 sqmm complete all as specified & directed.
Supply, laying, jointing, testing and commissioning in replacement LT electric cable, 1100 Volts grade, heavy duty, XLPE insulated, armoured electric power cable with aluminium conductor of cross sectional area 16 sqmm, 4 core conforming to IS- 7098 (Part I) 1988 as in trenches or along the wall/pole through pipe etc, complete all as specified & directed.
Description all as per BOQ item No. 88.00 here-in-above but cross sectional area 70 sqmm, 3.5 core.
Description all as per BOQ item No. 88.00 here-in-above but cross sectional area 120 sqmm, 3.5 core.
Description all as per BOQ item No. 88.00 here-in-above but cross sectional area 240 sqmm, 3.5 core. Notes for BOQ item No. 88.00 to 91.00:- Excavation & earth work, sand cushioning, end termination joints, protection pipes & protection covers etc. shall be measured and paid separately.
M&L in replacement earthing complete with galvanized steel earth plate electrode 60cm X 60cm X 6mm thick buried vertically in ground to depth not less than 2.25 mtr below ground level, with top edge of earth plate not less than 1.5 mtr below ground level surrounded from all sides by 15cm thick packed layer of Charcoal dust & common salt filled in alternate layers and electrode connected to GI earth lead wire of 4.0mm dia upto 7.5mtr long by means of bolts, nuts, check nuts and washers of galvanized iron and connection to earthing test point & earth dolly & watering pipe medium grade GI 20mm bore including protection pipe light grade GI 15mm bore, including wire mesh, funnel, lugs, salt, charcoal dust, excavation in any type of soil, returning filling & removal of surplus soil upto 50mtr, pit chamber shall be of PCC 1:3:6 type C1 using 20 mm graded mechnically crushed stone aggregates and pit cover slab 40mm thick shall be of Precast RCC 1:2:4 type B-1 using 20 mm graded mechnically crushed stone aggregates reinforced with 8mm dia MS bar @ 150mm c/c spcacing both side including necessary form work complete all as shown in electrical plate No 3 of SSR part-I, including testing on completion at site complete all as specified and directed.
M&L in replacement earthing complete with galvanized steel earth plate electrode 60cm X 60cm X 6mm thick buried vertically in ground to depth not less than 2.25 mtr below ground level, with top edge of earth plate not less than 1.5 mtr below ground level surrounded from all sides by 15cm thick packed layer of Charcoal dust & common salt filled in alternate layers and electrode connected to GI earth lead strip 32mm x 6mm upto 7.5mtr long by means of bolts, nuts, check nuts and washers of galvanized iron and connection to earthing test point & earth dolly & watering pipe medium grade GI 20mm bore including protection pipe light grade GI 40mm bore, including wire mesh, funnel, lugs, salt, charcoal dust, excavation in any type of soil, returning filling & removal of surplus soil upto 50mtr, pit chamber shall be of PCC 1:3:6 type C1 using 20 mm graded mechnically crushed stone aggregates and pit cover slab 40mm thick shall be of Precast RCC 1:2:4 type B-1 using 20 mm graded mechnically crushed stone aggregates reinforced with 8mm dia MS bar @ 150mm c/c spcacing both side including necessary form work complete all as shown in electrical plate No 3 of SSR part-I, including testing on completion at site complete all as specified and directed. Notes for BOQ item No. 92.00 & 93.00:- (i) Any variation in length of earth lead and protection pipe of earth lead shall be adjusted through DO. (ii) On testing if the desired earth resistance is not obtained, earthing will be generated at no extra cost , till the desired earth resistance is obtained. (iii) The chamber shall be constructed atleast 1.5 mtr away from the earth electrode.
M&L in replacement for maintenance free chemical earthing consisting each set of 03 Nos of earth electrode 17.2 mm dia, 3.00 mtr long made of high tensile low carbon steel circular rods having 250 microns, minimum thickness, molecularly bonded copper on outer surface of earth electrode to be lowered in 150 mm dia bore including filling of back fill/JAM compound in 50 mm dia bore in immediate contract around the earth electroode and the rest of the bore shall be fitted with well compacted earth and top of the bore shall be finished with 40 mm thick PCC1:2:4 type B1 using 20 mm graded mechanically crushed stone aggregates over 75 mm thick PCC in 1:4:8 type D-2 using 40 mm graded mechanically crushed stone aggregates and back fill/JAM compound shall be covered with advance polymer pit cover of 30 mm x 30 mm size complete all as specified & directed. Notes :- (i) The earthing shall comply to IS 3043, UL 467, BS/EN 50164-7. (ii) The earth resistance shall be less than one ohm. (iii) To obtain less than one ohm if a combination two or more earthings are to be interconnected or the length of the electrode is to be increased it shall be measured and paid as one earthing only. (iv) Testing of the earth shall be carried out along the departmental rep and a report shall be submitted to the Engineer-in-charge. (v) The cost of the above aspects and cost of Earthwork (if any) are deemed to be included in the quoted rates.
Conducting montly periodical testing of earth pits of chemical earthings (Total 250 chemical Earthing) by standred earth megger after disconnecting earth strip & submitting the records to Engineer-in-charge including reconnection complete all as specified & directed. Note:- (i) Rs.10000(Ten thousand) penlty for each month shall be levied to contractor, if contractor fail to submit the record in time for every month in 1st week. (ii) The work shall be executed through a specialist firm dealing in chemical earthing work as approved by GE. Contractor shall obtain approval of specialist firm from GE before testing of earthing started. (iii) Replecment of damaged nut/bolts, and required brazzing, soldring of strip are deemed to be included in quoted rates. (iv) The testing shall be carried out by contractor in the presence of rep of GE. (v) The total 250 Nos.(minimum) earthing pits shall be tested in a month.
S&F in replacement copper strip of size 20mm x 3.0mm with saddles and fixing screws, etc. for roof conductors, down conductors and wall conductors above the ground, etc. brazed/welded at each joint complete all as specified & directed
For Credit Schedule refer tender documents. The amount of credit schedule shall be deducted in total quoted amount of BOQ to arrive contract sum.
Esha Engineers
Star Electricals Udyog
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .