Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹2.1 L
EMD Value
₹2,100
Closing Date
29 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Chief Officer, Umreth Municipality, Umreth
BID DOCUMENTS FOR RENOVATION OF EXISTING AANGANWADI NEAR DATTATERY TEMPLE, ODE BAJAR AT UMRETH NAGARPALIKA UNDER: I.C.D.S YOJANA.
357440
ICDS/2026-27
Open
Civil Works - Buildings
Works
Anand
3 documents required · 3 mandatory
₹708
The Chief Officer, Umreth Municipality, Umreth
₹2,100
21 Oct 2026
21 Oct 2026
21 Oct 2026
29 Oct 2026
21 Oct 2026
120 days
Item Qty. Description Total Unit Amount
1 55.00 Dismentalling of tiled or stone floors in mortar including stacking of
Smt serviciable material and disposal of unserviciable material with all
2 11.00 Dismentling doors, windows, ventilators etc (wood or steel) shutters
Each including chowkhats, architraves, holdfasts and other attachment etc,
complete and stacking them within all lead and lift. (i) Not exceeding
3 Sq. m in area
3 210.53 Removing dry or oil bound distemper by washing and scraping and
Smt. sand papering the wall surface smooth including necessary repairs
to scratches complete.
4 48.00 Removing dry or oil bound distemper on ceiling and sloping roofs by
Smt. washing and scraping and sand papering the wall surface smooth
including necessary repairs to scratches complete.
5 2.50 Steel work, welded in built up sections framed work including
q cutting, hoisting, fixing in position and applying a priming coat of
red lead paint. (A)In beams and joists, channels angles Tees, flats,
with connecting plates or angle cleats as in main and cross beams.
Hip and jack rafters, purlins conneted to common rafters and the
6 0.00 Providing and fixing M. S. grills of requried pattern to wooden frames
Kgs. of window etc. with M. S. flats at requried spacings and frame
alround square or round bars with round headed bolts and nuts or by
screws. 106.23 Kg.
7 38.50 Providing and laying polished kota stone slab flooring over 20 mm
Smt. (average) thick base of cement mortar 1 : 6 (1 cement : 6 coarse
sand) or L.M. 1 : 1.5 (1: Lime putty : 1.5 coarse sand ) laid over and
jointed with grey cement slurry mixed with pigment to match the
shade of slab including rubbing and polishing etc. complete.(A)
mm thick. ( upto 10 ton) 1017.69 Smt.
SBD SECTION-7 BILL OF QUANTITIES-152
8 8.50 Painting two coats (Excluding Priming Coat) on new steel and other
Smt. metal surface with synthetic enamel paint, brushing to give an even
shade including cleaning the surface of all dirt, dust and other foreign
matter. 68.56 Smt.
9 32.00 Providing 15mm thick cement plaster in single coat on on rough
Smt. (similar) side of single or half brick walls for interior plastering and
finished even and smooth in. Cement Mortar 1:4 ( 1 Cement :
Sand) and finishing with a floating coat of neat cement slurry for
above floor two level. 127.87 Smt.
10 7.50 Providing 10mm thick cement plaster in single coat on ceilings and
Smt. soffits of stairs for interior plastering and finished even and smooth
in. Cement Mortar 1:3 ( 1 Cement : 3 Sand) and finishing with a
floating coat of neat cement slurry for above floor two level.
11 15.00 Providing 20mm thick sand faced cement plaster on wall up to height
Smt. 10 metres above ground level consisting of 12mm thick backing coat
of C.M. 1:3 (1 Cement ; 3 Sand) and 8mm thick finishing coat of C.M.
1:1 (1 Cement : 1 Sand) etc. Complete.
12 259.00 Applying two coats of Birla (White Cement based) or Asian acrylic
Smt. lappy (putty) or equivalent & two coats of primer of approved brand
and manufacture on new wall surface to give an even shade
including thoroughly brushing the surface free from mortar dropping
and other foreign matter and sand Papered smooth.
13 211.00 Distempering (Three Coat) with oil bound washable distemper of
Smt. approved brand and manufacture and of required shade on wall
surfaces to give and even shade over and including a primer coat
with alkali resistance primer of approved brand after throughly
brushing the surface free from other foreign matter and also
including preparing the surface even and sand papered
14 48.00 Distempering (Three Coat) with oil bound washable distemper of
Smt. approved brand and manufacture and of required shade on Ceiling &
Sloping Roof surfaces to give and even shade over and including a
primer coat with alkali resistance primer of approved brand after
throughly brushing the surface to give and free from other foreign
matter and also including preparing the surface even and sand
papered smooth.Celling 115.76 Smt.
SBD SECTION-7 BILL OF QUANTITIES-153
15 97.00 Finishing wall with Weather Proof Acrylic Exterior Emulsion Paint on
Smt. wall surface (two coats) to give and required shape even shade and
of approved brand and manufacturer after throughly brushing the
surface to remove all dirts, and remians of loose powdered materials
etc. complete. 120.26 Smt.
16 49.20 Providing and laying China Mosaic type water proofing treatment in
Smt. terrace including (a) Applying neat cement slurry 2.75 Kgs./Smt. of
cement admix with water proofing compound after cleaning the
surface (b) laying cement concrete using brick bats 25mm to 100mm
isze with 50% cement mortar 1:5 (1 Cement : 5 Coarse Sand)
admixed mortar proofing compound over 20mm thick layer of cement
mortar 1:5 to required slope including rounding of junctions of walls
and slabs (c) after two days of proper curing applying a second coat
of cement slurry (d) finished the surface with 20mm thick cement
mortar 1:4 (1 Cement : 4 Coarse Sand) and china mosaic tiling &
finally finishing the surface with trowel with white cement slurry (e)
after finishing the whole terrace shall be flooded with water for a
period of two weeks. 779.70 Smt.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Control Rs.
I / We am/are willing to carry out the work at _____________ % above / below (percent should be written in figure and in
( In words ) __________________________________________ Percentage above / below the estimated rate.
Estimated Amount put to tender Rs.
Deduct _______ % below Rs. Rs.
Estimated Amount put to tender Rs.
Add _______ % above Rs. Rs.
Total Amount Rs.
Total Amount Rs.
*( Please strike out whichever is not applicable)
Note :1 All work shall be carried out as per Public Works Department Hand Book and other specifications of
Note :2 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and
Note :3 I/ We have read the conditions mentioned in this tender and agree to abide by the same.
Seal & Signature of Contractor President Chief Officer
Umerth Nagarpalika Umerth Nagarpalika
SBD SECTION-7 BILL OF QUANTITIES-154
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD.pdf
Notes.pdf
BOQ.pdf
Other Important-1.pdf
Other Important-2.pdf
Other Important-3.pdf
Other Important-4.pdf
Other Important-5.pdf
Other Important-6.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .